Skip to main content
LED & Solar hiring kit

How to hire commercial solar installers.

To hire for LED & solar well, My Trade Talent's LED & Solar hiring kit takes all 2 roles we recruit in order: what each seat is and what it pays, the technical questions that test it, the 4 credentials to verify, and what can kill the offer between acceptance and the first day.

2 roles: Solar Photovoltaic Installer, Electrician (LED & Solar). Free, with nothing to fill in. If you would rather a recruiter ran the search, that is the LED & Solar recruiting page.

Step 1 · Plan

What each LED & solar seat is, and what it pays.

Each band is labelled with where it comes from. A My Trade Talent band is mid-experience, built from our own engagement history, and moves with experience and region. A BLS band is the federal 10th to 90th percentile, national and unadjusted, used where we have not closed enough searches in the trade to publish our own.

LED & Solar roles, pay bands and credentials

BLS 10th to 90th percentileEvery bar is drawn on one scale, $35,000 to $115,000.

  • Solar Photovoltaic Installer

    BLS 10th to 90th percentile

    Installs commercial photovoltaic systems: racking and attachment to the roof or structure, module setting, DC wiring and combiners, inverters, and the labelling and rapid shutdown the code requires.

    Pay band $41,600 to $79,970 Federal figures: BLS Occupational Employment and Wage Statistics, May 2025, national, SOC 47-2231. The range is the 10th to 90th percentile and the median is $53,140. It is not adjusted for experience or region, and it is not a My Trade Talent band.
    Credentials that move an offer NABCEP (preferred)
  • Electrician (LED & Solar)

    BLS 10th to 90th percentile

    Performs the licensed electrical work on lighting retrofit and solar projects: service and panel work, conductor sizing and runs, inverter and disconnect installation, interconnection, controls and sensors on lighting jobs, and the commissioning and utility sign-off at the end.

    Pay band $42,640 to $108,510 Federal figures: BLS Occupational Employment and Wage Statistics, May 2025, national, SOC 47-2111. The range is the 10th to 90th percentile and the median is $63,190. It is not adjusted for experience or region, and it is not a My Trade Talent band.
    Credentials that move an offer State License

We publish no LED & solar median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. The full distribution is in the Hiring Index.

Price the seat by experience and region in the salary calculator, and work out what leaving it open costs in the cost of vacancy calculator.

Step 3 · Interview

How to interview for each LED & solar role.

Everyone who applies will claim the experience. These are the questions that test it, the signals that separate a strong candidate from a plausible one, and the mistake each seat invites.

Solar Photovoltaic Installer

BLS 10th to 90th percentile NABCEP (preferred)

Installs commercial photovoltaic systems: racking and attachment to the roof or structure, module setting, DC wiring and combiners, inverters, and the labelling and rapid shutdown the code requires. Most of the risk is on a roof, and the roof warranty is somebody else's.

Questions that find out

  1. How do you attach racking on a membrane roof without voiding the warranty?

    A strong answer Finds out who holds the roof warranty and what their approved attachment detail is before anything is fixed, and uses it - usually a manufacturer-supplied curb or a flashed penetration installed by a roofer approved by them, or a ballasted system where the roof and the structure allow. Gets the roofing manufacturer's written acceptance and often their inspection. Says that a correct-looking penetration by the wrong contractor still ends the warranty.

    Follow up with Who physically makes the penetration on your jobs, and why does that matter?

  2. What does the code require for rapid shutdown and how do you verify it works?

    A strong answer Knows rapid shutdown limits the voltage within the array boundary and outside it within a set time after initiation, and that the current code requires module-level control rather than only shutting down at the array edge. Knows where the initiation device and the labelling have to be. Verifies by initiating it and measuring the voltage at the conductors after the required interval, rather than trusting the equipment to do what it claims.

    Follow up with How do you actually prove rapid shutdown worked?

  3. A string is reading low at the combiner. How do you trace it?

    A strong answer Compares the string against its neighbours under the same conditions rather than against a datasheet, then halves it: measures open-circuit voltage along the string to find a missing module or a bad connection, and checks for a module that is shaded, soiled, cracked or has a failed bypass diode. Checks the connectors, which are the usual culprit. Knows a low voltage points at a module or connection and a low current at shading or soiling.

    Follow up with Low voltage or low current - what does each point at?

  4. How do you verify the roof structure will take the array?

    A strong answer Does not assume. Knows the structural capacity is an engineer's decision, with the dead load of the array plus wind uplift and, where it applies, snow, and that a ballasted system is heavier than a penetrated one. Checks the structural letter or stamped drawings exist before mobilising, and raises anything on site that does not match - deteriorated deck, rusted purlins, a roof that has already been re-covered twice.

    Follow up with What would you stop for on a roof that the drawings did not mention?

  5. What is your approach to string sizing in cold weather?

    A strong answer Knows module voltage rises as temperature falls, so the string is sized on the record low temperature for the site rather than on standard conditions, and that a string sized for a mild day exceeds the inverter's maximum input voltage on the coldest morning of the year. Uses the module's temperature coefficient and the correct design temperature. Says this is the mistake that destroys inverters and voids warranties.

    Follow up with What temperature do you size the string for, and where does that number come from?

  6. How do you handle a roof plane that is partially shaded?

    A strong answer Looks at what shades it and when, across the year rather than on the day they are standing there, and whether it can be removed. Designs around it: keeps shaded modules off strings with unshaded ones, or uses module-level electronics so one shaded module does not drag a string. Models the loss honestly and tells the customer before installing rather than explaining the production shortfall afterwards.

    Follow up with Why does one shaded module matter so much on a string?

  7. Walk me through your commissioning checks before energising.

    A strong answer Describes a sequence: mechanical complete and torque verified, polarity confirmed on every string before connecting anything, open-circuit voltage measured and compared string to string, insulation resistance tested, grounding and bonding continuity verified, rapid shutdown and labelling in place, then energise in order and check each string's current under load. Documents the readings as the baseline for future troubleshooting.

    Follow up with What do you measure before you connect a single string to the inverter?

  8. What do you do when the array layout does not match the plan set?

    A strong answer Stops and raises it rather than adjusting on the roof, because the plan set is what was permitted and what the inspector will check against. Finds out whether the difference is the roof, an obstruction nobody surveyed, or a setback requirement. Gets a revision from the designer and, where the permit requires it, from the authority. Knows an as-built that differs from the approved plans fails inspection and delays the interconnection.

    Follow up with Why can't you just shift the array a row and carry on?

  9. How do you handle grounding and bonding on an array?

    A strong answer Bonds the modules and the racking as a continuous path using the listed methods for that racking - integrated bonding clips or washers used exactly as listed, not a substitute - and takes the equipment grounding conductor to the required point with the right size. Verifies continuity with a meter rather than assuming the rack is bonded through its clamps. Knows a bonding path through a painted or anodised surface is not a bonding path.

    Follow up with How do you prove the racking is actually bonded end to end?

  10. What is your approach to module layout around obstructions and setbacks?

    A strong answer Works from the approved plan and the local fire access requirements - ridge and perimeter setbacks and pathways - rather than filling the roof. Keeps clear of vents, curbs, skylights and anything that needs service, and allows for the shade they throw. Checks the setbacks with the authority where they are ambiguous. Says fire setbacks are the thing most often trimmed on site and most often caught at inspection.

    Follow up with Which setback is most often ignored on site?

  11. How do you deal with a racking system you have not used before?

    A strong answer Reads the installation manual before starting rather than assuming it works like the last one, because the torque values, the bonding method and the attachment detail are specific to the listing. Builds a small section and checks it against the manual. Calls the manufacturer's technical line for anything ambiguous. Knows that deviating from the manual voids the listing and the structural certification, whatever the result looks like.

    Follow up with What varies most between racking systems that catches people out?

  12. What is your process for torque and fastener verification?

    A strong answer Torques to the manufacturer's value with a calibrated wrench rather than by feel, marks what has been checked so the crew can see what is done, and has a second person verify a sample. Knows under-torqued clamps let modules move and over-torqued ones crack glass or strip rails. Records it as part of the commissioning package, because wind uplift failures come back to fastener torque.

    Follow up with How do you know, at the end of the day, that every clamp was torqued?

  13. How do you handle working on a roof in high wind?

    A strong answer Has a wind limit and stops at it rather than pressing on, because a module is a sail and will take a person off a roof. Secures every module and loose component rather than leaving anything on the roof, keeps the laydown low and strapped, and watches the forecast through the day. Says they have called a day for wind. Treats a module being carried in gusts as the hazard rather than the inconvenience.

    Follow up with At what wind speed do you stop handling modules?

  14. What is your approach to DC wire management so nothing chafes?

    A strong answer Supports every conductor off the roof surface in listed clips or trays at the required intervals rather than letting it lie in the pan or hang in loops, keeps it out of standing water, and protects it where it crosses anything abrasive. Keeps connectors mated properly and of the same make. Knows that a chafed DC conductor is an arc fault and a roof fire, and that this is the most common long-term installation defect.

    Follow up with Why does a conductor lying in the roof pan eventually fail?

  15. How do you deal with a module damaged during installation?

    A strong answer Takes it off the roof rather than installing it, however small the damage, because micro-cracked glass fails later as a hot spot and a possible arc source. Records it and reports it rather than hiding it in the middle of the array. Knows a damaged module also voids its own warranty and that nobody will find it until the string underperforms. Checks whether the damage points at a handling practice that will damage more.

    Follow up with What happens to an array with one cracked module in it two years later?

  16. What do you check before you call the array mechanically complete?

    A strong answer Walks every row: attachments flashed and sealed, torque verified and marked, bonding continuous, modules aligned and secure with no damage, wire management complete and off the roof, conduit supported, labelling in place, and the roof left clean with no fasteners or offcuts that will puncture the membrane. Photographs the attachments before anything is covered, and confirms the roofer has signed off their part.

    Follow up with What do you photograph before it is covered up?

What a strong candidate shows

  • Knows the attachment detail and who holds the roof warranty
  • Describes rapid shutdown and labelling requirements as code, not paperwork
  • Fall protection stated as a working practice rather than a certificate

The mistake

The mistake this seat invites. Hiring residential installers for commercial work without checking the structural and electrical scale-up. The systems, the attachments and the inspection are different.

Electrician (LED & Solar)

BLS 10th to 90th percentile State License

Performs the licensed electrical work on lighting retrofit and solar projects: service and panel work, conductor sizing and runs, inverter and disconnect installation, interconnection, controls and sensors on lighting jobs, and the commissioning and utility sign-off at the end.

Questions that find out

  1. Walk me through an interconnection from application to permission to operate.

    A strong answer Describes the real sequence: the utility application with the single line and equipment specifications, their study and the interconnection agreement, the building permit and plan review, construction, the jurisdiction's inspection and sign-off, then the utility's witness test or meter change, and only then permission to operate. Knows the system cannot be energised before that and what the penalties are. Knows where the time actually goes in their utility.

    Follow up with Which step in that sequence takes the longest in your area?

  2. How do you size conductors and overcurrent protection on a PV circuit?

    A strong answer Works from the module and inverter ratings through the code's required factors rather than from the nameplate alone: the continuous current adjustment for PV source circuits, then temperature and conduit fill derating for a conductor on a hot roof, and checks the result against the overcurrent device and the terminal temperature rating. Checks voltage drop separately. Knows rooftop ambient adders are the step most often skipped.

    Follow up with What do people most often forget when sizing a conductor on a roof?

  3. A networked lighting control system is not holding its schedule. How do you commission it?

    A strong answer Separates the layers before touching settings: is it the time source, the network, the controller, or the individual devices? Checks the clock and whether it has a reliable time reference and a daylight saving rule, whether devices are actually joined and reporting, and whether somebody has overridden locally. Commissions by zone with the owner watching, documents the programming, and hands over how to change it without calling them.

    Follow up with What is the most common reason a lighting schedule drifts?

  4. How do you size and terminate at the point of interconnection?

    A strong answer Knows the rules for connecting a supply-side or load-side tap and the limits that apply to a busbar with two sources, and checks the existing panel's rating and the main breaker against them before promising anything. Terminates with listed lugs or a tap device rated for the conductors and the fault current, labels it as the code requires, and torques to the manufacturer's value. Documents what the existing equipment actually is.

    Follow up with What limits where you can land on an existing busbar?

  5. What is your approach to rapid shutdown compliance?

    A strong answer Knows what the adopted code edition in that jurisdiction requires - voltage limits inside and outside the array boundary within the required time - and that meeting it usually means module-level equipment. Installs a listed system as listed rather than mixing components, puts the initiation device and labelling where the fire service will find them, and tests it by initiating and measuring rather than assuming.

    Follow up with Where does the initiation device have to be, and who decides?

  6. How do you troubleshoot a string producing below expectation?

    A strong answer Compares like with like first - the same string against its neighbours at the same moment - then looks at the pattern: an even shortfall across all strings suggests the inverter, irradiance or soiling, while one string points at a module, a connection or shading. Measures open-circuit voltage and operating current, checks connectors, and inspects for soiling, shading and visible module damage. Uses the commissioning baseline readings.

    Follow up with All strings are down ten per cent. Where do you look?

  7. How do you coordinate a shutdown to tie into a live service?

    A strong answer Plans it with the building: who it affects, what cannot lose power, how long it will be, and what the backup is - and gets it agreed in writing with a date and a window. Verifies isolation and locks out rather than trusting a label, tests dead before working, and has the parts and people ready so the outage is as short as promised. Says they have refused to do a live tie-in that somebody wanted to avoid a shutdown.

    Follow up with What do you do when the building will not give you an outage?

  8. How do you handle an inspection comment on labelling and signage?

    A strong answer Treats labelling as a code requirement rather than cosmetic: the placards and warnings required at the disconnects, the array, the point of interconnection and the service, with the wording, durability and location the code specifies. Fixes it and asks the inspector what they want where, because local practice varies. Checks the labelling before calling the inspection rather than failing on it, since it is the easiest thing to get right.

    Follow up with What labelling do inspectors in your area write up most often?

  9. How do you perform a load calculation before adding a system to an existing service?

    A strong answer Uses the method the code allows - a standard calculation or, on an existing building, measured maximum demand over a qualifying period where that is permitted - and documents which. Checks the existing service and panel ratings against both the load and the new source, and the available fault current. Says what happens when the calculation shows the service is inadequate: a service upgrade, a different point of connection, or a smaller system.

    Follow up with What do you tell a customer when the calculation says their service will not take it?

  10. What is your approach to conduit, raceway and wire management on a roof?

    A strong answer Routes to keep conductors off the roof surface and out of water, supports at the required intervals with listed supports that do not damage the membrane, and allows for thermal expansion on long runs. Minimises penetrations and flashes every one to the roofer's detail. Derates for the rooftop ambient. Keeps runs out of the way of service access and future roof work, and labels the raceway.

    Follow up with Why does a long conduit run on a roof need expansion fittings?

  11. How do you handle an inverter fault code you have not seen?

    A strong answer Reads the manufacturer's documentation rather than guessing or clearing it, and records the conditions at the time - irradiance, temperature, which string, what else was happening. Calls technical support with the serial and the log. Checks the obvious external causes first: grid voltage or frequency excursions, a ground fault, arc fault detection, or insulation resistance. Does not repeatedly reset a fault that is protecting something.

    Follow up with What is the risk of just clearing a fault and walking away?

  12. What is your process for commissioning and system verification?

    A strong answer Runs a defined sequence and records it: continuity and polarity on every circuit, insulation resistance, open-circuit voltage per string compared across strings, grounding verified, rapid shutdown tested, then energise and record operating current and power against expectation for the conditions. Hands over the readings as a baseline. Says that a system commissioned without recorded numbers cannot be troubleshot properly later.

    Follow up with What baseline numbers do you leave with the owner?

  13. How do you handle a lighting retrofit where the existing circuits are not as documented?

    A strong answer Verifies rather than trusting the panel schedule, which is almost always wrong in an older building: traces circuits, confirms what is on them and what else shares them, and checks for switch legs, emergency circuits and controls that are not on the drawings. Updates the schedule as they go. Knows emergency and egress lighting circuits are the ones that get wrongly reused and that the consequence is found during a power failure.

    Follow up with Which existing circuit do you most need to identify correctly before you start?

  14. What is your approach to a retrofit where the existing panel is full?

    A strong answer Looks at the real options rather than defaulting to the most expensive: a supply-side connection, a sub-panel, a listed tandem or a panel replacement, each checked against the busbar rating and the code's limits for a panel with two sources. Checks whether the existing load calculation supports what is there now. Prices the options for the customer honestly rather than deciding for them.

    Follow up with When is a supply-side connection the right answer?

  15. How do you handle arc fault or ground fault trips on a new array?

    A strong answer Treats them as real until proven otherwise rather than resetting repeatedly. For a ground fault, isolates by string with an insulation resistance tester to find the compromised conductor, and looks at the usual causes - a pinched conductor at a clamp, a damaged connector, water ingress in a junction. For an arc fault, inspects the connectors and the wire management rather than assuming it is nuisance tripping. Documents what was found.

    Follow up with How do you find which string has the ground fault?

  16. What would make you refuse to energise?

    A strong answer Names real triggers: no permission to operate from the utility, an inspection not signed off, labelling or rapid shutdown incomplete, an insulation resistance or polarity test that failed, a ground fault present, equipment damaged, or a service whose rating the system exceeds. Says they would rather have the conversation about a delayed energisation than be the person who energised a system that then faulted.

    Follow up with Who has pushed you to energise early, and what did you say?

What a strong candidate shows

  • Electrical licence current for the jurisdiction, stated without hedging
  • Has done an interconnection and dealt with the utility, not just the inverter
  • Lighting controls described as commissioning work rather than device installation

The mistake

The mistake this seat invites. Treating retrofit work as device swapping. The licensed electrical scope, the interconnection and the controls commissioning are where the job succeeds or stalls.

Every role in every trade is in the interview question bank.

Step 4 · Offer

What can kill an LED & solar offer before day one.

The things that end an accepted offer between the yes and the start date, specific to this trade and each sourced.

  • NABCEP is not a licence, and candidates think it is

    NABCEP says so itself: its board certification is peer recognition, not registration or licensure. A hiring manager who screens on NABCEP alone finds after the offer that the work still has to be performed or supervised under a state electrical or solar contractor licence held by somebody else.

    Source: www.nabcep.org/certifications/frequently-asked-questions/
  • The electrician licence does not cross the state line

    Reciprocity is narrow and level-specific rather than general. Texas publishes journeyman reciprocity with ten named states and master reciprocity with a much shorter list, and states plainly that no other licence types reciprocate. A journeyman relocating from outside those lists starts again.

    Source: www.tdlr.texas.gov/electricians/out-of-state.htm
  • PVIP cannot be earned without an employer

    It requires documented project credits on permitted, finally inspected systems in a decision-making role, verified and recent. A candidate between jobs, or one whose previous firm will not verify their projects, cannot complete it alone, so the plan to get certified after hire often quietly fails.

    Source: www.nabcep.org/certifications/nabcep-board-certifications/
  • Height is the day-one filter

    Commercial rooftop PV triggers fall protection duties above six feet on low-slope roofs, and lighting retrofit means aerial lifts, where only trained and authorised people may operate and a harness or restraint is required. Harness fit, lift certification gaps and plain comfort at height surface on the first morning, not in the interview.

    Source: www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.501

Add up the whole offer, not just the base, in the offer calculator.

Step 5 · Onboard

Credentials to verify before the first day.

Each names the body that issues it and links to the issuer's own page or a .gov page. Researched 2026-09-23; re-read the source before relying on an entry.

  • NABCEP PV Installation Professional (PVIP)

    North American Board of Certified Energy Practitioners (NABCEP)

    The certification commercial EPCs put on bid qualifications, covering PV design, installation, commissioning and maintenance. It requires documented completed installations in a decision-making role, plus OSHA construction outreach training, so it is not a credential a first-year installer can hold.

    Source: www.nabcep.org/certifications/nabcep-board-certifications/
  • NABCEP PV Associate

    North American Board of Certified Energy Practitioners (NABCEP)

    The entry credential, which NABCEP says qualifies someone to design, sell, install or maintain systems in a supervised capacity. This is the realistic ask for a first-year installer.

    Source: www.nabcep.org/certifications/associate-program/
  • NALMCO Certified Apprentice Lighting Technician (CALT) and Certified Senior Lighting Technician (CSLT)

    NALMCO, the International Association of Lighting Management Companies

    The technician ladder specific to commercial lighting retrofit rather than solar. CSLT covers lighting fundamentals, planned maintenance, luminaires, emergency lighting, energy management and controls, safety and electrical code, and troubleshooting. NALMCO states that CALT must be obtained before earning the CSLT designation. Both renew every three years on nine hours of continuing education.

    Source: www.nalmco.org/cslt
  • OSHA 10-hour and 30-hour Construction Outreach cards

    OSHA Outreach Training Program, US Department of Labor

    OSHA does not itself require these, but states that some states, cities and employers mandate them as a prerequisite to employment. In practice the card gates site access on most general-contractor-controlled commercial jobs, and NABCEP requires the 10-hour for PVIP.

    Source: www.osha.gov/training/oshacardfacts

State licensing for 39 states (Alabama, Arkansas, Arizona, California, Colorado, Connecticut, District of Columbia, Florida, Georgia, Hawaii, Iowa, Idaho, Illinois, Indiana, Kansas, Kentucky, Louisiana, Massachusetts, Maryland, Michigan, Minnesota, Missouri, North Carolina, Nebraska, New Mexico, Nevada, New York, Ohio, Oklahoma, Oregon, Pennsylvania, Rhode Island, South Carolina, Tennessee, Texas, Utah, Virginia, Washington and Wisconsin) is in the credential check, each with the agency and its source. Open the credential check for LED & Solar.

Step 6 · Retain

Where each role goes next.

Candidates ask about the next step in the first conversation, and an employer who can answer it keeps the people who had other options. Say it on day one, too.

  • Solar Photovoltaic Installer

    Installers move to lead and foreman, and the electrical side of the work opens licensure paths.

  • Electrician (LED & Solar)

    Electricians on this work move to foreman or project manager, and NABCEP certification raises their standing on solar jobs.

Questions

Hiring for LED & solar: questions.

What interview questions should I ask when hiring for LED & solar?

My Trade Talent's LED & Solar hiring kit carries 16 technical questions for each of its 2 roles. For the Solar Photovoltaic Installer, the first is: "How do you attach racking on a membrane roof without voiding the warranty?" The full set, with the signals that separate a strong answer, is on this page and in the interview question bank.

What credentials should I verify when hiring in LED & solar?

The LED & Solar kit lists 4, each with its issuing body and a primary source: NABCEP PV Installation Professional (PVIP), NABCEP PV Associate, NALMCO Certified Apprentice Lighting Technician (CALT) and Certified Senior Lighting Technician (CSLT) and OSHA 10-hour and 30-hour Construction Outreach cards.

What can kill an LED & solar job offer before the start date?

The LED & Solar kit names 4, each sourced: NABCEP is not a licence, and candidates think it is, The electrician licence does not cross the state line, PVIP cannot be earned without an employer and Height is the day-one filter.

What do LED & solar roles pay?

Solar Photovoltaic Installer: $41,600 to $79,970 (BLS 10th to 90th percentile); Electrician (LED & Solar): $42,640 to $108,510 (BLS 10th to 90th percentile). My Trade Talent bands are mid-experience and move with experience and region; BLS figures are national and unadjusted.

How long does it take to hire in LED & solar?

We publish no LED & solar median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.

Trade Talk A monthly hiring brief for commercial trades employers

What changed in your trade this month, and what to do about it.

One email a month, and only one. We write a separate issue for every trade we recruit in, so you get yours - not a round-up with your trade buried in paragraph nine. Every issue is written for the person actually doing the hiring.

  • Where wages moved in your trade, by market, and what that does to your next offer
  • How long roles like yours are taking to fill, and where it is getting worse
  • Interview and screening tactics that are landing candidates this month
  • What contractors competing for the same people are doing differently

Built on federal wage data, our own closed searches, and what we hear on the desk every week. Written for employers, not candidates. No pitch, no filler, one click to leave.

Pick your trade. That is the one issue you get, once a month.

One email a month. Your trade and your address, nothing else - we do not sell either, and you can unsubscribe from the bottom of any issue. Read this month's issue for your trade first →