Elevator Project Manager Performance Review Template

Elevator Maintenance

5 weighted sections, 26 criteria, on a scale with written anchors. The criteria are things a manager can observe on a job rather than adjectives about a person, which is the difference between a review somebody can prepare for and one they can only receive.

5weighted sections
26observable criteria
1 to 5anchored scale, every point written out
Take this away as a Word document The same instrument with the scoring columns, a computed overall score with bands, development goals and a sign-off block. The first download asks for your name, company, work email and phone; after that every document here downloads without a form.
Download .docx

The scale

RatingWhat it means
1Does not meet. Specific, repeated and known to the person.
2Below the seat. Needs supervision the role is not supposed to need.
3Meets the seat. This is the standard, not the consolation.
4Above the seat. Others are learning from how they do it.
5Rare. Changes how the company does the work.

A 3 is the standard the seat was hired against, not a disappointment. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing.

How the weighted score works

Each section rating is multiplied by that section's weight; the five results are added and divided by 100. Worked through with this role's own weightings, for an illustrative Elevator Project Manager who is strong on the trade itself, standard on output and safety, and below the seat on communication:

SectionWeightExample ratingWeighted
A. Technical skill and execution25%41.00
B. Productivity and measured results20%30.60
C. Safety and compliance15%30.45
D. Communication and customer handling25%20.50
E. Reliability, teamwork and development15%30.45
Overall100% 3.00

3.00 on a scale where 3.00 is the seat performed to standard. The total is the least interesting number in that table. A 2 in one section can sit inside a total that reads as unremarkable, which is exactly why the section scores go on the form and the conversation happens section by section rather than about an average. The ratings above are an illustration, not a finding about anyone.

A. Technical skill and execution 25%

CriterionWhat good looks like
Scope and document commandIdentified scope gaps and specification conflicts at buyout on the projects reviewed, documented them, and none surfaced later as an unrecovered cost
Submittal and permit workSubmittals and permit applications were complete on first issue and approved without a rejection for missing information this year
Hoistway and machine room coordinationVerified shaft tolerances, pit, overhead and power conditions before equipment arrived, with no crew standby caused by a site condition the PM should have caught
Procurement and lead-time managementEquipment was released early enough to meet the schedule, with no project delayed by a release the PM controlled
Code and inspection knowledgeAnticipated the code and AHJ requirements for each project, including variances, with no late-stage redesign or re-inspection caused by a missed requirement

B. Productivity and measured results 20%

CriterionWhat good looks like
Projects delivered on scheduleAssigned projects reached substantial completion within the approved schedule, with delays documented and attributable
Cost performanceFinal job cost met or beat the sold margin on the projects closed this period
Change order disciplineAdded scope was priced and approved in writing before the work, and change orders were billed in the month they were approved
Labor forecast accuracyCrew forecasts matched actual manning closely enough that the superintendent could plan, with no repeated last-minute crew demands
Billing and closeout cyclePay applications were submitted on time and final billing and retainage release were completed within the contract terms

C. Safety and compliance 15%

CriterionWhat good looks like
Safety planning for the projectIssued a site-specific safety plan and reviewed the rigging and hoistway access plans with the crew before mobilization on every project
Site conduct and PPEWore required PPE and followed site rules on every visit, with no general contractor safety observation naming the PM
Shutdown and public protection planningPlanned occupied-building shutdowns with barricades, signage and building notification, with no passenger or public incident on an assigned project
Regulatory documentationPermits, certified payroll, inspection filings and test records were complete and filed within the required deadlines on assigned projects
Incident and claim handlingReported and documented any site incident, damage or claim the same day and followed through on the corrective action

D. Communication and customer handling 25%

CriterionWhat good looks like
General contractor relationshipHeld readiness and schedule commitments with the general contractor in writing, and the GC project manager would request this PM again
Owner and consultant communicationGave owners and consultants accurate status, including bad news early, and no project this year surprised a client with a date or a cost
Meeting and record disciplineAttended required OAC meetings and issued written records of decisions, RFIs and commitments that the team relied on
Internal communication with the fieldGave the superintendent and crews the drawings, approvals, parts and schedule they needed before they mobilized, with examples from this period
Inspector and AHJ handlingScheduled inspections with realistic readiness and represented the company professionally, with no inspection aborted for an unready unit
Punch list and turnover handlingClosed punch items with documented resolution and turned the project over without a trailing list the service branch inherited

E. Reliability, teamwork and development 15%

CriterionWhat good looks like
Follow-through on commitmentsDid what was promised by the date promised, or renegotiated the date in advance, with no commitment dropped silently this year
Project records and system hygieneProject files, schedules, submittal logs and cost data were current in the company system so anyone could pick up the job
Support of the service branchHanded over units with a warranty start date, route assignment, documentation and a walkthrough the service team accepted
Teamwork with estimating and the superintendentFed field lessons and cost history back into estimating and planned manning jointly with the superintendent rather than around him
Professional developmentCompleted training or earned a credential this year in code, scheduling or contract management and applied it on a project

What this seat is measured on day to day

MeasureWhat it captures
Schedule performance against approved milestonesEquipment release, site readiness, startup, inspection and turnover dates hit against the baseline schedule
Submittal and approval turnaroundDays from award to submittal issue and from issue to state or AHJ approval on each project
Job cost against sold valueFinal labor, material and freight cost compared to the sold estimate, including change order recovery
Inspection and witness test pass rateShare of state and third-party inspections and witness tests passed on the first scheduled attempt
Turnover package completeness at substantial completionWiring diagrams, test records, maintenance control program, manuals and certificate documentation complete before final billing
Change order capture and approvalAdded scope identified, priced and approved in writing before the work was performed, and billed
Warranty callbacks in the first ninety daysCallbacks on turned-over units in the warranty window traced to installation or coordination rather than equipment defect

The same measures the job description for this role is written against, so the document you hire against and the document you rate against are measuring one thing.

Where this person goes next

Elevator PMs move to senior PM, operations manager, or branch management.

The review is the natural place for this conversation and the wrong place to have it for the first time. Someone hearing about the next seat in the same meeting as their rating hears it as consolation. Say it in advance, then use the review to say how far along they are.

What it costs if this one leaves

We publish no elevator maintenance median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.

Worth knowing before the meeting rather than after it. The question a retention decision actually turns on is not whether a raise is deserved but what the seat costs empty for that long, and the calculator will put a figure on it for your billing rate.

Before you use it

Move the weightings to match how your business makes money, and move them before the review rather than after you have seen the scores. The split here is a starting point, not a judgement about your company.

Against every criterion, write the job, the date or the customer that evidences it. A criterion with nothing written beside it has not been met, however well the person is getting on, because you are about to make a decision and an impression is not evidence.

What follows from the result is yours. Pay, promotion and a development plan depend on your margins, your bands and your state, and nothing here sets them.

Questions employers ask about reviewing this role

How do you score an annual review for an Elevator Project Manager?

5 sections, weighted to 25%, 20%, 15%, 25%, 15% in that order, each rated 1 to 5 against written anchors. Multiply each section rating by its weight, add the five results and divide by 100; the worked example on this page does it in full. A 3.00 is the seat performed to the standard it was hired against.

What should a rating of 3 mean?

Meets the seat. It is the standard, not the consolation. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing and defends nothing if the decision is ever questioned.

How many criteria does this review cover?

26 across 5 sections, all of them things a manager can observe on a job rather than adjectives about a person. Each one has what good looks like written out beside it, which is the difference between a review somebody can prepare for and one they can only receive.

Should the review set pay?

Not by itself, and nothing here does. The instrument tells you how the work was performed against the seat. What follows - a raise, a promotion, a development plan or none of them - depends on your margins, your bands and your state.

What do I do with a 2 in one section?

Name the job, the date or the customer that evidences it, say what meeting the seat would look like instead, and put a date on when you will look again. A 2 with no evidence beside it is an impression, and an impression is not something you can ask someone to improve. A 2 that sits inside an acceptable overall total is also the most common thing a single summary number hides, which is why the section scores go on the form.

Can I change the weightings?

Yes, and you should if they do not match how your business makes money. Change them before the review rather than after you have seen the scores, and change them for the seat rather than the person. The split here is a starting point.

What is the next step up from Elevator Project Manager?

Elevator PMs move to senior PM, operations manager, or branch management.

What does it cost if an Elevator Project Manager leaves?

We publish no elevator maintenance median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. That is the refill clock; the cost of the vacancy runs alongside it from the day the seat empties.

Trade Talk A monthly hiring brief for commercial trades employers

What changed in your trade this month, and what to do about it.

One email a month, and only one. We write a separate issue for every trade we recruit in, so you get yours - not a round-up with your trade buried in paragraph nine. Every issue is written for the person actually doing the hiring.

  • Where wages moved in your trade, by market, and what that does to your next offer
  • How long roles like yours are taking to fill, and where it is getting worse
  • Interview and screening tactics that are landing candidates this month
  • What contractors competing for the same people are doing differently

Built on federal wage data, our own closed searches, and what we hear on the desk every week. Written for employers, not candidates. No pitch, no filler, one click to leave.

Pick your trade. That is the one issue you get, once a month.

One email a month. Your trade and your address, nothing else - we do not sell either, and you can unsubscribe from the bottom of any issue. Read this month's issue for your trade first →