Elevator Project Manager Performance Review Template
Elevator Maintenance
5 weighted sections, 26 criteria, on a scale with written anchors. The criteria are things a manager can observe on a job rather than adjectives about a person, which is the difference between a review somebody can prepare for and one they can only receive.
The scale
| Rating | What it means |
|---|---|
| 1 | Does not meet. Specific, repeated and known to the person. |
| 2 | Below the seat. Needs supervision the role is not supposed to need. |
| 3 | Meets the seat. This is the standard, not the consolation. |
| 4 | Above the seat. Others are learning from how they do it. |
| 5 | Rare. Changes how the company does the work. |
A 3 is the standard the seat was hired against, not a disappointment. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing.
How the weighted score works
Each section rating is multiplied by that section's weight; the five results are added and divided by 100. Worked through with this role's own weightings, for an illustrative Elevator Project Manager who is strong on the trade itself, standard on output and safety, and below the seat on communication:
| Section | Weight | Example rating | Weighted |
|---|---|---|---|
| A. Technical skill and execution | 25% | 4 | 1.00 |
| B. Productivity and measured results | 20% | 3 | 0.60 |
| C. Safety and compliance | 15% | 3 | 0.45 |
| D. Communication and customer handling | 25% | 2 | 0.50 |
| E. Reliability, teamwork and development | 15% | 3 | 0.45 |
| Overall | 100% | 3.00 |
3.00 on a scale where 3.00 is the seat performed to standard. The total is the least interesting number in that table. A 2 in one section can sit inside a total that reads as unremarkable, which is exactly why the section scores go on the form and the conversation happens section by section rather than about an average. The ratings above are an illustration, not a finding about anyone.
A. Technical skill and execution 25%
| Criterion | What good looks like |
|---|---|
| Scope and document command | Identified scope gaps and specification conflicts at buyout on the projects reviewed, documented them, and none surfaced later as an unrecovered cost |
| Submittal and permit work | Submittals and permit applications were complete on first issue and approved without a rejection for missing information this year |
| Hoistway and machine room coordination | Verified shaft tolerances, pit, overhead and power conditions before equipment arrived, with no crew standby caused by a site condition the PM should have caught |
| Procurement and lead-time management | Equipment was released early enough to meet the schedule, with no project delayed by a release the PM controlled |
| Code and inspection knowledge | Anticipated the code and AHJ requirements for each project, including variances, with no late-stage redesign or re-inspection caused by a missed requirement |
B. Productivity and measured results 20%
| Criterion | What good looks like |
|---|---|
| Projects delivered on schedule | Assigned projects reached substantial completion within the approved schedule, with delays documented and attributable |
| Cost performance | Final job cost met or beat the sold margin on the projects closed this period |
| Change order discipline | Added scope was priced and approved in writing before the work, and change orders were billed in the month they were approved |
| Labor forecast accuracy | Crew forecasts matched actual manning closely enough that the superintendent could plan, with no repeated last-minute crew demands |
| Billing and closeout cycle | Pay applications were submitted on time and final billing and retainage release were completed within the contract terms |
C. Safety and compliance 15%
| Criterion | What good looks like |
|---|---|
| Safety planning for the project | Issued a site-specific safety plan and reviewed the rigging and hoistway access plans with the crew before mobilization on every project |
| Site conduct and PPE | Wore required PPE and followed site rules on every visit, with no general contractor safety observation naming the PM |
| Shutdown and public protection planning | Planned occupied-building shutdowns with barricades, signage and building notification, with no passenger or public incident on an assigned project |
| Regulatory documentation | Permits, certified payroll, inspection filings and test records were complete and filed within the required deadlines on assigned projects |
| Incident and claim handling | Reported and documented any site incident, damage or claim the same day and followed through on the corrective action |
D. Communication and customer handling 25%
| Criterion | What good looks like |
|---|---|
| General contractor relationship | Held readiness and schedule commitments with the general contractor in writing, and the GC project manager would request this PM again |
| Owner and consultant communication | Gave owners and consultants accurate status, including bad news early, and no project this year surprised a client with a date or a cost |
| Meeting and record discipline | Attended required OAC meetings and issued written records of decisions, RFIs and commitments that the team relied on |
| Internal communication with the field | Gave the superintendent and crews the drawings, approvals, parts and schedule they needed before they mobilized, with examples from this period |
| Inspector and AHJ handling | Scheduled inspections with realistic readiness and represented the company professionally, with no inspection aborted for an unready unit |
| Punch list and turnover handling | Closed punch items with documented resolution and turned the project over without a trailing list the service branch inherited |
E. Reliability, teamwork and development 15%
| Criterion | What good looks like |
|---|---|
| Follow-through on commitments | Did what was promised by the date promised, or renegotiated the date in advance, with no commitment dropped silently this year |
| Project records and system hygiene | Project files, schedules, submittal logs and cost data were current in the company system so anyone could pick up the job |
| Support of the service branch | Handed over units with a warranty start date, route assignment, documentation and a walkthrough the service team accepted |
| Teamwork with estimating and the superintendent | Fed field lessons and cost history back into estimating and planned manning jointly with the superintendent rather than around him |
| Professional development | Completed training or earned a credential this year in code, scheduling or contract management and applied it on a project |
What this seat is measured on day to day
| Measure | What it captures |
|---|---|
| Schedule performance against approved milestones | Equipment release, site readiness, startup, inspection and turnover dates hit against the baseline schedule |
| Submittal and approval turnaround | Days from award to submittal issue and from issue to state or AHJ approval on each project |
| Job cost against sold value | Final labor, material and freight cost compared to the sold estimate, including change order recovery |
| Inspection and witness test pass rate | Share of state and third-party inspections and witness tests passed on the first scheduled attempt |
| Turnover package completeness at substantial completion | Wiring diagrams, test records, maintenance control program, manuals and certificate documentation complete before final billing |
| Change order capture and approval | Added scope identified, priced and approved in writing before the work was performed, and billed |
| Warranty callbacks in the first ninety days | Callbacks on turned-over units in the warranty window traced to installation or coordination rather than equipment defect |
The same measures the job description for this role is written against, so the document you hire against and the document you rate against are measuring one thing.
Where this person goes next
Elevator PMs move to senior PM, operations manager, or branch management.
The review is the natural place for this conversation and the wrong place to have it for the first time. Someone hearing about the next seat in the same meeting as their rating hears it as consolation. Say it in advance, then use the review to say how far along they are.
What it costs if this one leaves
We publish no elevator maintenance median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
Worth knowing before the meeting rather than after it. The question a retention decision actually turns on is not whether a raise is deserved but what the seat costs empty for that long, and the calculator will put a figure on it for your billing rate.
Before you use it
Move the weightings to match how your business makes money, and move them before the review rather than after you have seen the scores. The split here is a starting point, not a judgement about your company.
Against every criterion, write the job, the date or the customer that evidences it. A criterion with nothing written beside it has not been met, however well the person is getting on, because you are about to make a decision and an impression is not evidence.
What follows from the result is yours. Pay, promotion and a development plan depend on your margins, your bands and your state, and nothing here sets them.
Questions employers ask about reviewing this role
How do you score an annual review for an Elevator Project Manager?
5 sections, weighted to 25%, 20%, 15%, 25%, 15% in that order, each rated 1 to 5 against written anchors. Multiply each section rating by its weight, add the five results and divide by 100; the worked example on this page does it in full. A 3.00 is the seat performed to the standard it was hired against.
What should a rating of 3 mean?
Meets the seat. It is the standard, not the consolation. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing and defends nothing if the decision is ever questioned.
How many criteria does this review cover?
26 across 5 sections, all of them things a manager can observe on a job rather than adjectives about a person. Each one has what good looks like written out beside it, which is the difference between a review somebody can prepare for and one they can only receive.
Should the review set pay?
Not by itself, and nothing here does. The instrument tells you how the work was performed against the seat. What follows - a raise, a promotion, a development plan or none of them - depends on your margins, your bands and your state.
What do I do with a 2 in one section?
Name the job, the date or the customer that evidences it, say what meeting the seat would look like instead, and put a date on when you will look again. A 2 with no evidence beside it is an impression, and an impression is not something you can ask someone to improve. A 2 that sits inside an acceptable overall total is also the most common thing a single summary number hides, which is why the section scores go on the form.
Can I change the weightings?
Yes, and you should if they do not match how your business makes money. Change them before the review rather than after you have seen the scores, and change them for the seat rather than the person. The split here is a starting point.
What is the next step up from Elevator Project Manager?
Elevator PMs move to senior PM, operations manager, or branch management.
What does it cost if an Elevator Project Manager leaves?
We publish no elevator maintenance median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. That is the refill clock; the cost of the vacancy runs alongside it from the day the seat empties.
One time
Where should we send it?
Tell us who you are once and every document on this site downloads for you from then on, with no form in the way. We are a recruiting firm: someone may call about the roles you are hiring for.