Commercial Flooring PM Performance Review Template
Commercial Flooring
5 weighted sections, 27 criteria, on a scale with written anchors. The criteria are things a manager can observe on a job rather than adjectives about a person, which is the difference between a review somebody can prepare for and one they can only receive.
The scale
| Rating | What it means |
|---|---|
| 1 | Does not meet. Specific, repeated and known to the person. |
| 2 | Below the seat. Needs supervision the role is not supposed to need. |
| 3 | Meets the seat. This is the standard, not the consolation. |
| 4 | Above the seat. Others are learning from how they do it. |
| 5 | Rare. Changes how the company does the work. |
A 3 is the standard the seat was hired against, not a disappointment. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing.
How the weighted score works
Each section rating is multiplied by that section's weight; the five results are added and divided by 100. Worked through with this role's own weightings, for an illustrative Commercial Flooring PM who is strong on the trade itself, standard on output and safety, and below the seat on communication:
| Section | Weight | Example rating | Weighted |
|---|---|---|---|
| A. Technical skill and execution | 25% | 4 | 1.00 |
| B. Productivity and measured results | 20% | 3 | 0.60 |
| C. Safety and compliance | 15% | 3 | 0.45 |
| D. Communication and customer handling | 25% | 2 | 0.50 |
| E. Reliability, teamwork and development | 15% | 3 | 0.45 |
| Overall | 100% | 3.00 |
3.00 on a scale where 3.00 is the seat performed to standard. The total is the least interesting number in that table. A 2 in one section can sit inside a total that reads as unremarkable, which is exactly why the section scores go on the form and the conversation happens section by section rather than about an average. The ratings above are an illustration, not a finding about anyone.
A. Technical skill and execution 25%
| Criterion | What good looks like |
|---|---|
| Takeoff and buyout accuracy | Ordered quantities land within the job's waste allowance and no phase stopped for a material shortage traced to the takeoff |
| Moisture and substrate decisions | Relative humidity and pH testing is run and documented before every installation and mitigation calls match adhesive and manufacturer limits |
| Submittals and specification compliance | Submittals go out inside the contract window and are approved without rejection for missing or non-conforming product data |
| Phasing plans in occupied buildings | Each phase plan names dates, areas, access, protection and furniture handling, and was executed without an occupant disruption complaint |
| Installer scheduling | The weekly look-ahead is published on time, crews arrive to a ready substrate, and any downtime is logged with a cause |
| Documentation at the job | Pre-installation meeting notes, substrate photos, delivery tickets and daily reports are in the job file and dated |
B. Productivity and measured results 20%
| Criterion | What good looks like |
|---|---|
| Margin held | Jobs closed at or above sold margin, and any erosion is explained in the monthly WIP with the event that caused it |
| Job cost reporting discipline | Costs are coded and reviewed weekly and WIP is accurate within the company's variance tolerance at every month end |
| Change orders | Additional work is priced and approved in writing before it proceeds and no unbilled extras surface at closeout |
| On-time turnover | Committed phase and substantial completion dates are met, or a recovery plan is issued before the date slips |
| Closeout and attic stock | Warranties, maintenance data, as-built finish locations and attic stock are delivered inside the contract period |
C. Safety and compliance 15%
| Criterion | What good looks like |
|---|---|
| Site safety on flooring scopes | Crews work with required PPE, cut protection, ventilation and housekeeping, and no OSHA-recordable injury occurred on managed jobs |
| Adhesive, sealer and grinding controls | Ventilation, respirators and dust collection are named in the plan and in place before the work starts |
| Subcontractor compliance | Insurance certificates, certifications and prevailing wage documents are current before any crew mobilizes |
| Hazard discovery handling | Suspected asbestos-containing flooring or other unexpected conditions stop work and are reported in writing the same day |
| Toolbox talks and documentation | Pre-task plans and weekly safety talks are held and signed on every active job |
D. Communication and customer handling 25%
| Criterion | What good looks like |
|---|---|
| General contractor and owner communication | Written updates go out on the agreed cadence and questions are answered within one business day |
| Written notice discipline | Substrate conditions, delays and scope changes are documented in writing when discovered, not reconstructed later |
| Installer direction | Crews receive scope, layout, seam direction and protection expectations in writing before mobilizing and confirm they understand them |
| Problem delivery | A dye lot miss, failed moisture test or late mill ship reaches the customer with options the same day it is known |
| Punch and close | Punch walks are scheduled proactively and items are closed with the customer signing acceptance |
| Vendor and mill relationships | Expedites, claims and replacements are resolved with the supplier without the customer having to chase them |
E. Reliability, teamwork and development 15%
| Criterion | What good looks like |
|---|---|
| Follow-through on commitments | Dates and deliverables promised in meetings happen, or a change is communicated before the due date |
| Approvals and paperwork | Timesheets, invoice approvals and purchase orders are processed inside the accounting calendar every cycle |
| Support to the team | Covers estimating, other managers' jobs and installer issues when asked, without an operations escalation |
| Professional development | Completed at least one manufacturer, moisture testing or project management training during the period |
| Response to feedback | Corrections raised in job reviews show up in the next job's plan and documents |
What this seat is measured on day to day
| Measure | What it captures |
|---|---|
| Gross margin at job close versus sold margin | Whether the job finished at or above the margin it was bought at, and what moved it |
| Material waste and overage | Square footage ordered against square footage installed, including waste factor, returns and unused attic stock |
| Schedule performance | Phases turned over on the dates committed in the look-ahead, and days of installer downtime caused by the project manager |
| Dye lot and material defect incidents | Jobs with mismatched lots, late deliveries or wrong product traced back to the buyout |
| Change order capture | Extra work priced, approved in writing and billed before it was performed |
| Punch and warranty callbacks | Punch items per 10,000 square feet and warranty calls in the first year after closeout |
| Closeout timeliness | Days from substantial completion to a complete closeout package and delivered attic stock |
The same measures the job description for this role is written against, so the document you hire against and the document you rate against are measuring one thing.
Where this person goes next
Flooring PMs move to senior PM or operations manager.
The review is the natural place for this conversation and the wrong place to have it for the first time. Someone hearing about the next seat in the same meeting as their rating hears it as consolation. Say it in advance, then use the review to say how far along they are.
The pay conversation
My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.
A review that produces a number and no pay decision is a review the employee will discount next year. One that produces a pay decision made in the same half hour is usually a decision made on the last thing discussed. Know where the person sits in the band before the meeting, and treat the rating as evidence for a decision you take afterwards.
Nothing here sets pay. What a rating is worth depends on your margins, your bands and your state, and those are yours.
What it costs if this one leaves
We publish no commercial flooring median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 94 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
Worth knowing before the meeting rather than after it. The question a retention decision actually turns on is not whether a raise is deserved but what the seat costs empty for that long, and the calculator will put a figure on it for your billing rate.
Before you use it
Move the weightings to match how your business makes money, and move them before the review rather than after you have seen the scores. The split here is a starting point, not a judgement about your company.
Against every criterion, write the job, the date or the customer that evidences it. A criterion with nothing written beside it has not been met, however well the person is getting on, because you are about to make a decision and an impression is not evidence.
What follows from the result is yours. Pay, promotion and a development plan depend on your margins, your bands and your state, and nothing here sets them.
Questions employers ask about reviewing this role
How do you score an annual review for a Commercial Flooring PM?
5 sections, weighted to 25%, 20%, 15%, 25%, 15% in that order, each rated 1 to 5 against written anchors. Multiply each section rating by its weight, add the five results and divide by 100; the worked example on this page does it in full. A 3.00 is the seat performed to the standard it was hired against.
What should a rating of 3 mean?
Meets the seat. It is the standard, not the consolation. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing and defends nothing if the decision is ever questioned.
How many criteria does this review cover?
27 across 5 sections, all of them things a manager can observe on a job rather than adjectives about a person. Each one has what good looks like written out beside it, which is the difference between a review somebody can prepare for and one they can only receive.
Should the review set pay?
Not by itself, and nothing here does. The instrument tells you how the work was performed against the seat. What follows - a raise, a promotion, a development plan or none of them - depends on your margins, your bands and your state. For reference, the band for this role is $78,000 to $115,000.
What do I do with a 2 in one section?
Name the job, the date or the customer that evidences it, say what meeting the seat would look like instead, and put a date on when you will look again. A 2 with no evidence beside it is an impression, and an impression is not something you can ask someone to improve. A 2 that sits inside an acceptable overall total is also the most common thing a single summary number hides, which is why the section scores go on the form.
Can I change the weightings?
Yes, and you should if they do not match how your business makes money. Change them before the review rather than after you have seen the scores, and change them for the seat rather than the person. The split here is a starting point.
What is the next step up from Commercial Flooring PM?
Flooring PMs move to senior PM or operations manager.
What does it cost if a Commercial Flooring PM leaves?
We publish no commercial flooring median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 94 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. That is the refill clock; the cost of the vacancy runs alongside it from the day the seat empties.
One time
Where should we send it?
Tell us who you are once and every document on this site downloads for you from then on, with no form in the way. We are a recruiting firm: someone may call about the roles you are hiring for.