Skip to main content
Annual review

Commercial Roofing Foreman Performance Review Template

Commercial Roofing

5 weighted sections, 24 criteria, on a scale with written anchors. The criteria are things a manager can observe on a job rather than adjectives about a person, which is the difference between a review somebody can prepare for and one they can only receive.

5weighted sections
24observable criteria
1 to 5anchored scale, every point written out
Take this away as a Word document The same instrument with the scoring columns, a computed overall score with bands, development goals and a sign-off block. The first download asks for your name, company, work email and phone; after that every document here downloads without a form.
Download .docx

The scale

RatingWhat it means
1Does not meet. Specific, repeated and known to the person.
2Below the seat. Needs supervision the role is not supposed to need.
3Meets the seat. This is the standard, not the consolation.
4Above the seat. Others are learning from how they do it.
5Rare. Changes how the company does the work.

A 3 is the standard the seat was hired against, not a disappointment. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing.

How the weighted score works

Each section rating is multiplied by that section's weight; the five results are added and divided by 100. Worked through with this role's own weightings, for an illustrative Commercial Roofing Foreman who is strong on the trade itself, standard on output and safety, and below the seat on communication:

SectionWeightExample ratingWeighted
A. Technical skill and execution30%41.20
B. Productivity and measured results20%30.60
C. Safety and compliance20%30.60
D. Communication and customer handling15%20.30
E. Reliability, teamwork and development15%30.45
Overall100% 3.15

3.15 on a scale where 3.00 is the seat performed to standard. The total is the least interesting number in that table. A 2 in one section can sit inside a total that reads as unremarkable, which is exactly why the section scores go on the form and the conversation happens section by section rather than about an average. The ratings above are an illustration, not a finding about anyone.

A. Technical skill and execution 30%

CriterionWhat good looks like
Membrane installation qualityWelds pass probe testing, daily test welds are documented, and no seam failures are found at the manufacturer inspection; cite the roof and the report
Flashing and termination detailingCurbs, drains, penetrations and terminations match the manufacturer detail; name a job that closed with no detail items on the punch list
Layout and substrate workInsulation, cover board and tapered layout match the plan and hold slope to drain, with deck conditions photographed before cover
System knowledgeWorks correctly from the approved assembly on at least two systems without being told the fastener pattern or adhesive rate
Field problem identificationCatches a deck, slope or detail condition the drawings missed and gets it to the project manager before it is covered

B. Productivity and measured results 20%

CriterionWhat good looks like
Crew production rateSquares per labor hour meets or beats the estimated rate on most jobs, with variances explained by documented conditions
Dry-in and reworkNo water intrusion from an open roof and no section torn out and reinstalled during the review period
Material controlWaste stays within allowance, unused material is returned for credit, and nothing is lost to weather on the ground or the deck
Schedule adherenceRoof sections are complete by the dates committed to the general contractor; name the jobs and the dates
Crew start and utilizationCrew is loaded, staged and producing within the first half hour of shift start, with no idle day caused by material the foreman could have called for

C. Safety and compliance 20%

CriterionWhat good looks like
Fall protection in placeWarning lines, guardrail, monitors or tie-off are set before work begins every day on every roof, confirmed by unannounced site audit
Documented pre-task meetingA signed daily huddle record exists for each workday naming that day hazards and controls
Hot work controlPermit pulled, fire watch posted and extinguisher staged for every torch, kettle and welding operation
Incident and near miss recordNo recordable injury traceable to an uncorrected condition, and near misses reported the same day
Equipment and PPE inspectionHarnesses, lanyards, ladders and lifts inspected on the documented schedule and damaged equipment pulled from service

D. Communication and customer handling 15%

CriterionWhat good looks like
Daily reportingA daily report with quantities, crew, weather and photographs is submitted every workday
General contractor and occupant coordinationRoof access, crane picks, hot work and occupant notices are arranged in advance, with no complaint about surprise noise, odor or blocked access
Crew directionAny crew member asked at random can state the day scope, sequence and hazards
Weather callsGo and no-go decisions reach the project manager and general contractor early enough to redeploy the crew

E. Reliability, teamwork and development 15%

CriterionWhat good looks like
Attendance and start timeOn site ahead of the crew and ready to work at shift start, with unplanned absences within policy
Paperwork disciplineTimesheets, quantities and receipts submitted accurately by the payroll deadline without reminders
Crew developmentTrains apprentices on welding and detailing and names at least one crew member who advanced during the year
Working across crewsShares manpower, equipment and material with other crews to protect company dates without being told to
Own developmentCompletes an agreed certification during the review year, such as manufacturer certification, OSHA 30, competent person or lift operator

What this seat is measured on day to day

MeasureWhat it captures
Squares installed per crew labor hour against the estimateField production measured against the hours the job was sold with
Water intrusion events on open roofsWhether tear-off is being sized to the dry-in capacity and weather window
Weld and seam test resultsDocumented daily test welds and probe checks, and seam findings at manufacturer inspection
Punch list items per job at the manufacturer or owner walkQuality of detail work measured by what the field representative writes up
Recordable incidents, near misses and fall protection audit findingsWhether crew exposure is controlled on a surface where the hazard is the work area
Material waste and returned creditOverordering, weather-damaged stock and unused material recovered
Daily report and timesheet completenessWhether quantities and hours arrive accurate and on time for billing and job cost

The same measures the job description for this role is written against, so the document you hire against and the document you rate against are measuring one thing.

Where this person goes next

Roofing foremen move to superintendent or project manager, and manufacturer certifications travel with them.

The review is the natural place for this conversation and the wrong place to have it for the first time. Someone hearing about the next seat in the same meeting as their rating hears it as consolation. Say it in advance, then use the review to say how far along they are.

The pay conversation

$70,000 to $105,000 My Trade Talent band

My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.

A review that produces a number and no pay decision is a review the employee will discount next year. One that produces a pay decision made in the same half hour is usually a decision made on the last thing discussed. Know where the person sits in the band before the meeting, and treat the rating as evidence for a decision you take afterwards.

Nothing here sets pay. What a rating is worth depends on your margins, your bands and your state, and those are yours.

What it costs if this one leaves

My Trade Talent's median commercial roofing hire took 21 days across 12 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.

Worth knowing before the meeting rather than after it. The question a retention decision actually turns on is not whether a raise is deserved but what the seat costs empty for that long, and the calculator will put a figure on it for your billing rate.

Before you use it

Move the weightings to match how your business makes money, and move them before the review rather than after you have seen the scores. The split here is a starting point, not a judgement about your company.

Against every criterion, write the job, the date or the customer that evidences it. A criterion with nothing written beside it has not been met, however well the person is getting on, because you are about to make a decision and an impression is not evidence.

What follows from the result is yours. Pay, promotion and a development plan depend on your margins, your bands and your state, and nothing here sets them.

Questions employers ask about reviewing this role

How do you score an annual review for a Commercial Roofing Foreman?

5 sections, weighted to 30%, 20%, 20%, 15%, 15% in that order, each rated 1 to 5 against written anchors. Multiply each section rating by its weight, add the five results and divide by 100; the worked example on this page does it in full. A 3.00 is the seat performed to the standard it was hired against.

What should a rating of 3 mean?

Meets the seat. It is the standard, not the consolation. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing and defends nothing if the decision is ever questioned.

How many criteria does this review cover?

24 across 5 sections, all of them things a manager can observe on a job rather than adjectives about a person. Each one has what good looks like written out beside it, which is the difference between a review somebody can prepare for and one they can only receive.

Should the review set pay?

Not by itself, and nothing here does. The instrument tells you how the work was performed against the seat. What follows - a raise, a promotion, a development plan or none of them - depends on your margins, your bands and your state. For reference, the band for this role is $70,000 to $105,000.

What do I do with a 2 in one section?

Name the job, the date or the customer that evidences it, say what meeting the seat would look like instead, and put a date on when you will look again. A 2 with no evidence beside it is an impression, and an impression is not something you can ask someone to improve. A 2 that sits inside an acceptable overall total is also the most common thing a single summary number hides, which is why the section scores go on the form.

Can I change the weightings?

Yes, and you should if they do not match how your business makes money. Change them before the review rather than after you have seen the scores, and change them for the seat rather than the person. The split here is a starting point.

What is the next step up from Commercial Roofing Foreman?

Roofing foremen move to superintendent or project manager, and manufacturer certifications travel with them.

What does it cost if a Commercial Roofing Foreman leaves?

My Trade Talent's median commercial roofing hire took 21 days across 12 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. That is the refill clock; the cost of the vacancy runs alongside it from the day the seat empties.

Trade Talk A monthly hiring brief for commercial trades employers

What changed in your trade this month, and what to do about it.

One email a month, and only one. We write a separate issue for every trade we recruit in, so you get yours - not a round-up with your trade buried in paragraph nine. Every issue is written for the person actually doing the hiring.

  • Where wages moved in your trade, by market, and what that does to your next offer
  • How long roles like yours are taking to fill, and where it is getting worse
  • Interview and screening tactics that are landing candidates this month
  • What contractors competing for the same people are doing differently

Built on federal wage data, our own closed searches, and what we hear on the desk every week. Written for employers, not candidates. No pitch, no filler, one click to leave.

Pick your trade. That is the one issue you get, once a month.

One email a month. Your trade and your address, nothing else - we do not sell either, and you can unsubscribe from the bottom of any issue. Read this month's issue for your trade first →