Commercial Roofing Foreman Performance Review Template
Commercial Roofing
5 weighted sections, 24 criteria, on a scale with written anchors. The criteria are things a manager can observe on a job rather than adjectives about a person, which is the difference between a review somebody can prepare for and one they can only receive.
The scale
| Rating | What it means |
|---|---|
| 1 | Does not meet. Specific, repeated and known to the person. |
| 2 | Below the seat. Needs supervision the role is not supposed to need. |
| 3 | Meets the seat. This is the standard, not the consolation. |
| 4 | Above the seat. Others are learning from how they do it. |
| 5 | Rare. Changes how the company does the work. |
A 3 is the standard the seat was hired against, not a disappointment. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing.
How the weighted score works
Each section rating is multiplied by that section's weight; the five results are added and divided by 100. Worked through with this role's own weightings, for an illustrative Commercial Roofing Foreman who is strong on the trade itself, standard on output and safety, and below the seat on communication:
| Section | Weight | Example rating | Weighted |
|---|---|---|---|
| A. Technical skill and execution | 30% | 4 | 1.20 |
| B. Productivity and measured results | 20% | 3 | 0.60 |
| C. Safety and compliance | 20% | 3 | 0.60 |
| D. Communication and customer handling | 15% | 2 | 0.30 |
| E. Reliability, teamwork and development | 15% | 3 | 0.45 |
| Overall | 100% | 3.15 |
3.15 on a scale where 3.00 is the seat performed to standard. The total is the least interesting number in that table. A 2 in one section can sit inside a total that reads as unremarkable, which is exactly why the section scores go on the form and the conversation happens section by section rather than about an average. The ratings above are an illustration, not a finding about anyone.
A. Technical skill and execution 30%
| Criterion | What good looks like |
|---|---|
| Membrane installation quality | Welds pass probe testing, daily test welds are documented, and no seam failures are found at the manufacturer inspection; cite the roof and the report |
| Flashing and termination detailing | Curbs, drains, penetrations and terminations match the manufacturer detail; name a job that closed with no detail items on the punch list |
| Layout and substrate work | Insulation, cover board and tapered layout match the plan and hold slope to drain, with deck conditions photographed before cover |
| System knowledge | Works correctly from the approved assembly on at least two systems without being told the fastener pattern or adhesive rate |
| Field problem identification | Catches a deck, slope or detail condition the drawings missed and gets it to the project manager before it is covered |
B. Productivity and measured results 20%
| Criterion | What good looks like |
|---|---|
| Crew production rate | Squares per labor hour meets or beats the estimated rate on most jobs, with variances explained by documented conditions |
| Dry-in and rework | No water intrusion from an open roof and no section torn out and reinstalled during the review period |
| Material control | Waste stays within allowance, unused material is returned for credit, and nothing is lost to weather on the ground or the deck |
| Schedule adherence | Roof sections are complete by the dates committed to the general contractor; name the jobs and the dates |
| Crew start and utilization | Crew is loaded, staged and producing within the first half hour of shift start, with no idle day caused by material the foreman could have called for |
C. Safety and compliance 20%
| Criterion | What good looks like |
|---|---|
| Fall protection in place | Warning lines, guardrail, monitors or tie-off are set before work begins every day on every roof, confirmed by unannounced site audit |
| Documented pre-task meeting | A signed daily huddle record exists for each workday naming that day hazards and controls |
| Hot work control | Permit pulled, fire watch posted and extinguisher staged for every torch, kettle and welding operation |
| Incident and near miss record | No recordable injury traceable to an uncorrected condition, and near misses reported the same day |
| Equipment and PPE inspection | Harnesses, lanyards, ladders and lifts inspected on the documented schedule and damaged equipment pulled from service |
D. Communication and customer handling 15%
| Criterion | What good looks like |
|---|---|
| Daily reporting | A daily report with quantities, crew, weather and photographs is submitted every workday |
| General contractor and occupant coordination | Roof access, crane picks, hot work and occupant notices are arranged in advance, with no complaint about surprise noise, odor or blocked access |
| Crew direction | Any crew member asked at random can state the day scope, sequence and hazards |
| Weather calls | Go and no-go decisions reach the project manager and general contractor early enough to redeploy the crew |
E. Reliability, teamwork and development 15%
| Criterion | What good looks like |
|---|---|
| Attendance and start time | On site ahead of the crew and ready to work at shift start, with unplanned absences within policy |
| Paperwork discipline | Timesheets, quantities and receipts submitted accurately by the payroll deadline without reminders |
| Crew development | Trains apprentices on welding and detailing and names at least one crew member who advanced during the year |
| Working across crews | Shares manpower, equipment and material with other crews to protect company dates without being told to |
| Own development | Completes an agreed certification during the review year, such as manufacturer certification, OSHA 30, competent person or lift operator |
What this seat is measured on day to day
| Measure | What it captures |
|---|---|
| Squares installed per crew labor hour against the estimate | Field production measured against the hours the job was sold with |
| Water intrusion events on open roofs | Whether tear-off is being sized to the dry-in capacity and weather window |
| Weld and seam test results | Documented daily test welds and probe checks, and seam findings at manufacturer inspection |
| Punch list items per job at the manufacturer or owner walk | Quality of detail work measured by what the field representative writes up |
| Recordable incidents, near misses and fall protection audit findings | Whether crew exposure is controlled on a surface where the hazard is the work area |
| Material waste and returned credit | Overordering, weather-damaged stock and unused material recovered |
| Daily report and timesheet completeness | Whether quantities and hours arrive accurate and on time for billing and job cost |
The same measures the job description for this role is written against, so the document you hire against and the document you rate against are measuring one thing.
Where this person goes next
Roofing foremen move to superintendent or project manager, and manufacturer certifications travel with them.
The review is the natural place for this conversation and the wrong place to have it for the first time. Someone hearing about the next seat in the same meeting as their rating hears it as consolation. Say it in advance, then use the review to say how far along they are.
The pay conversation
My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.
A review that produces a number and no pay decision is a review the employee will discount next year. One that produces a pay decision made in the same half hour is usually a decision made on the last thing discussed. Know where the person sits in the band before the meeting, and treat the rating as evidence for a decision you take afterwards.
Nothing here sets pay. What a rating is worth depends on your margins, your bands and your state, and those are yours.
What it costs if this one leaves
My Trade Talent's median commercial roofing hire took 21 days across 9 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
Worth knowing before the meeting rather than after it. The question a retention decision actually turns on is not whether a raise is deserved but what the seat costs empty for that long, and the calculator will put a figure on it for your billing rate.
Before you use it
Move the weightings to match how your business makes money, and move them before the review rather than after you have seen the scores. The split here is a starting point, not a judgement about your company.
Against every criterion, write the job, the date or the customer that evidences it. A criterion with nothing written beside it has not been met, however well the person is getting on, because you are about to make a decision and an impression is not evidence.
What follows from the result is yours. Pay, promotion and a development plan depend on your margins, your bands and your state, and nothing here sets them.
Questions employers ask about reviewing this role
How do you score an annual review for a Commercial Roofing Foreman?
5 sections, weighted to 30%, 20%, 20%, 15%, 15% in that order, each rated 1 to 5 against written anchors. Multiply each section rating by its weight, add the five results and divide by 100; the worked example on this page does it in full. A 3.00 is the seat performed to the standard it was hired against.
What should a rating of 3 mean?
Meets the seat. It is the standard, not the consolation. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing and defends nothing if the decision is ever questioned.
How many criteria does this review cover?
24 across 5 sections, all of them things a manager can observe on a job rather than adjectives about a person. Each one has what good looks like written out beside it, which is the difference between a review somebody can prepare for and one they can only receive.
Should the review set pay?
Not by itself, and nothing here does. The instrument tells you how the work was performed against the seat. What follows - a raise, a promotion, a development plan or none of them - depends on your margins, your bands and your state. For reference, the band for this role is $70,000 to $105,000.
What do I do with a 2 in one section?
Name the job, the date or the customer that evidences it, say what meeting the seat would look like instead, and put a date on when you will look again. A 2 with no evidence beside it is an impression, and an impression is not something you can ask someone to improve. A 2 that sits inside an acceptable overall total is also the most common thing a single summary number hides, which is why the section scores go on the form.
Can I change the weightings?
Yes, and you should if they do not match how your business makes money. Change them before the review rather than after you have seen the scores, and change them for the seat rather than the person. The split here is a starting point.
What is the next step up from Commercial Roofing Foreman?
Roofing foremen move to superintendent or project manager, and manufacturer certifications travel with them.
What does it cost if a Commercial Roofing Foreman leaves?
My Trade Talent's median commercial roofing hire took 21 days across 9 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. That is the refill clock; the cost of the vacancy runs alongside it from the day the seat empties.
One time
Where should we send it?
Tell us who you are once and every document on this site downloads for you from then on, with no form in the way. We are a recruiting firm: someone may call about the roles you are hiring for.