Skip to main content
Job description

Commercial Roofing Foreman Job Description

Commercial Roofing

The Commercial Roofing Foreman runs the crew on the roof. The foreman sequences tear-off so the building stays dry, inspects the deck as it is exposed, lays out insulation and cover board, directs membrane installation, and details flashings and terminations to the manufacturer approved assembly. The foreman makes the daily call on whether the weather lets the work go on. On a surface where the fall hazard is the work area itself, the foreman owns crew safety.

15essential duties
7 / 6required / preferred qualifications
6credentials, each with who verifies it
Take this away as a Word document The same description, formatted for a personnel file, with an acknowledgement signature block at the end. The first download asks for your name, company, work email and phone; after that every document here downloads without a form.
Download .docx

What this seat pays

$70,000 to $105,000 My Trade Talent band

My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.

Pay, location and the date prepared are blank in the Word version on purpose. They depend on your market and your margins, and a template that guesses at them is worse than one that leaves them to you. The figure above is here so the guess is at least anchored.

The seat

Reports toRoofing Superintendent
Direct reportsCrew of 4 to 12 roofers, apprentices and laborers
FLSA statusNon-exempt — confirm with counsel
TradeCommercial Roofing
Pay band$70,000 to $105,000 — My Trade Talent band

Where the role goes next. Roofing foremen move to superintendent or project manager, and manufacturer certifications travel with them.

Essential duties (15)

  • Hold and document a pre-task safety meeting on the roof each morning covering the fall protection plan, warning line and monitor positions, hot work, and the day weather window.
  • Set fall protection before any work starts, including perimeter warning lines, guardrail, monitor assignments, anchors and personal fall arrest where tie-off is required, and control roof access.
  • Sequence tear-off to the area the crew can dry in that day, allowing time to set temporary water cutoffs before shift end.
  • Inspect the deck as it is exposed for rusted or deflected steel, wet lightweight concrete, and rotted nailers, stop work in that area, photograph the condition and notify the project manager.
  • Lay out insulation and cover board to the specified thickness and board pattern, stagger joints, and hold the tapered and cricket layout so the roof drains.
  • Direct attachment to the approved assembly, including fastener pattern and density, plate placement, adhesive ribbon spacing and rate, and asphalt application temperature.
  • Direct and perform membrane installation, including hot-air welded TPO and PVC seams with daily test welds and probe checks, EPDM seam tape, and modified bitumen laps.
  • Detail flashings and terminations, including base flashings, curbs, pipe boots, drains, scuppers, expansion joints, termination bar and sealant.
  • Record installed quantities and crew hours daily, with squares installed, material consumed and photographs, and submit accurate timesheets by the payroll deadline.
  • Manage material on the roof by staging within deck load limits, keeping insulation dry and covered, and returning unused stock for credit.
  • Make the daily weather call, secure the roof and all open areas ahead of rain or wind, and verify water cutoffs before leaving the site.
  • Coordinate with the general contractor and building occupants on crane and hoist picks, hot work permits, roof access, odor and noise notice, and dumpster and parking placement.
  • Walk completed sections with the project manager and the manufacturer field representative and correct punch list items before demobilization.
  • Enforce housekeeping with daily debris pickup, magnet sweep of the grounds and parking, and protection of landscaping and occupied interior spaces.
  • Train and evaluate crew members by correcting welds and detail work in the moment, and report readiness for advancement to the superintendent.

Qualifications

Required
  • Five years commercial roofing experience with at least two years running a crew as a foreman or lead.
  • Hands-on competence in at least two of TPO, PVC, EPDM, modified bitumen or built-up roofing, including flashings and terminations.
  • Ability to read roof plans, details and the manufacturer specification for an approved assembly.
  • Current OSHA 10 and the ability to implement low-slope fall protection under 29 CFR 1926 Subpart M.
  • Ability to work on a roof surface for a full shift in summer heat and winter cold, lift 75 pounds, and climb ladders and hatches repeatedly.
  • Valid driver license and insurable record, including towing a trailer and transporting crew and material.
  • Ability to pass a drug screen and to be badged for school, hospital and secure sites.
Preferred
  • Current manufacturer installer certification with the systems the company sells, such as Carlisle, Elevate, GAF, Johns Manville or Sika Sarnafil.
  • OSHA 30 and fall protection competent person training.
  • Aerial lift and telehandler operator certification.
  • CERTA torch applicator certification for modified bitumen work.
  • Bilingual English and Spanish to run a mixed crew and deliver safety briefings in both languages.
  • Architectural sheet metal experience with edge metal, coping, gutters and custom flashings.

The line between these two columns is the one that costs you candidates. Everything in the preferred column that gets written into a posting as a requirement removes people who could do the job, and in a trade with a shortage that is a self-inflicted wound.

Credentials, and who verifies them

CredentialStatusVerify with
OSHA 10-Hour Construction, with OSHA 30 preferredRequiredCard copy plus OSHA Outreach trainer verification
Fall Protection Competent Person TrainingRequiredTraining provider certificate on file with the safety manager
Manufacturer Installer Certification for the systems installedPreferredManufacturer contractor portal or field representative confirmation
Aerial Lift and Telehandler Operator CertificationPreferredTraining provider card plus the employer hands-on evaluation record
CERTA Torch Applicator CertificationWhere the state requires itTraining provider card; also required by many property insurers for torch work
Driver License and Motor Vehicle RecordRequiredState motor vehicle record pulled through the company insurance carrier

Verify before an offer rather than after. A credential taken on trust at offer is the most expensive line on this page. We track commercial roofing licensing in 36 states; which of them applies depends on where the work is, not where the company is.

Physical demands

ActivityFrequency
Standing and walking on low-slope roofs, including over loose insulation, ballast and unadhered membraneConstant (over 2/3 of shift)
Working at height where the roof edge is the work area and the primary fall hazardConstant (over 2/3 of shift)
Climbing extension ladders, fixed ladders and roof hatches to reach and leave the work areaFrequent (1/3 to 2/3 of shift)
Lifting and carrying up to 75 pounds, including insulation board, membrane rolls and fastener bucketsFrequent (1/3 to 2/3 of shift)
Bending, kneeling and squatting to weld seams, set flashings and detail drainsFrequent (1/3 to 2/3 of shift)
Exposure to direct sun, heat radiating off the membrane, cold and windConstant (over 2/3 of shift)
Pushing and pulling rolls, carts, power brooms and tear-off equipment across the deckFrequent (1/3 to 2/3 of shift)
Reaching overhead to set counterflashing, coping and equipment supportsOccasional (under 1/3 of shift)
Gripping and operating hand tools, hot-air welders, screw guns and hook knivesConstant (over 2/3 of shift)
Exposure to hot asphalt, adhesives, open torch flame and solvent fumesOccasional (under 1/3 of shift)
Wearing a full body harness and connecting to an anchor or lifelineOccasional (under 1/3 of shift)
Writing and using a phone or tablet for daily reports, photographs and timesheetsOccasional (under 1/3 of shift)

This is the section a reasonable accommodation decision actually turns on, which is why it is role specific rather than copied across a trade. An estimator sits and walks sites; a screed operator stands beside hot asphalt all day.

Work environment

Nearly all work happens outdoors on commercial roofs of occupied and unoccupied buildings, year round. Conditions include heat reflected off the membrane, cold, wind, glare and sudden weather changes. Hazards include unprotected edges, skylights and roof openings, hot asphalt and torches, adhesive and solvent fumes, tear-off dust, overhead crane picks, and live rooftop equipment. Early starts, weekend work and shutdown windows on occupied buildings are routine.

Tools and equipment

The employer provides hot-air welders, screw guns and fastening systems, tear-off equipment, kettles and pumps, lifts and hoists, harnesses, lanyards, warning line and guardrail systems, hard hats, vests, gloves and eye protection. The foreman is expected to own work boots, a tool belt, hook knife, tape measure, pliers, hammer and common hand tools, and weather-appropriate clothing including sun protection.

How performance is measured

MeasureWhat it captures
Squares installed per crew labor hour against the estimateField production measured against the hours the job was sold with
Water intrusion events on open roofsWhether tear-off is being sized to the dry-in capacity and weather window
Weld and seam test resultsDocumented daily test welds and probe checks, and seam findings at manufacturer inspection
Punch list items per job at the manufacturer or owner walkQuality of detail work measured by what the field representative writes up
Recordable incidents, near misses and fall protection audit findingsWhether crew exposure is controlled on a surface where the hazard is the work area
Material waste and returned creditOverordering, weather-damaged stock and unused material recovered
Daily report and timesheet completenessWhether quantities and hours arrive accurate and on time for billing and job cost

These are the same measures the annual review for this role is built on, so the document you hire against and the document you rate against are measuring one thing.

Reading a resume for this seat

What separates a strong Commercial Roofing Foreman from a plausible one, on paper and in the first ten minutes of a call:

  • Names the systems worked rather than saying "commercial roofing" - TPO, EPDM, modified bitumen, built-up, standing seam
  • Treats detail work - curbs, penetrations, parapets, drains - as the part that decides whether the roof leaks
  • Can describe a dry-in plan for a partial tear-off with rain forecast

Screen for it: 3 questions and what a strong answer contains

A job description tells you what you need. These tell you whether the person in front of you has it. Each one comes with what a strong answer contains, because an interviewer who does not know that is persuaded by fluency, which is exactly what the question was supposed to see past.

Tear-off is open and a storm is two hours out. What is your sequence?

What a strong answer contains

Stops opening new area the moment the forecast turns and works out how much can be made watertight in the time available, then dries in from the low point and the drains outward. Has the tie-in material and the temporary water cut-offs on the roof already rather than sending someone for them. Pulls the crew off tear-off and onto dry-in, protects the interior underneath, and tells the building contact before the water arrives rather than after. Walks it afterwards in the rain to find what leaked.

Follow up with: How much open area can your crew dry in within two hours, and how do you know?

Walk me through flashing a curb-mounted unit on a TPO roof.

What a strong answer contains

Describes the sequence rather than naming products: substrate prepared and dry, insulation and cover board cut tight to the curb, the base secured, then the flashing run up the curb to the required height in one piece where possible, with corners detailed as a formed or prefabricated piece rather than a patchwork. Terminates mechanically with a bar and sealant under the counter-flashing, not relying on sealant alone. Probes every seam when it has cooled and says what height the flashing needs to reach.

Follow up with: How do you handle the corners, and how do you check the welds when you are done?

The deck under the old system is worse than the bid assumed. Who do you call and in what order?

What a strong answer contains

Stops, photographs it with something in frame for scale and location, and does not keep tearing off to see how far it goes beyond what they can dry in. Calls their project manager first so the change is priced and authorised, and expects the owner or general contractor to be told the same day. Knows deteriorated deck is a safety issue before it is a cost issue and marks it off. Has a view on whether it is a repair or a structural question that needs an engineer.

Follow up with: How do you decide whether that deck is your call or an engineer's?

The mistake this seat invites

Hiring on square footage installed rather than on detail work and dry-in judgement. Roofs fail at penetrations and terminations, not in the field of the membrane.

How long this takes to fill

My Trade Talent's median commercial roofing hire took 21 days across 12 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.

Worth writing on the requisition before you post it. The cost of the vacancy runs from the day the seat empties, not from the day you start looking, and the calculator will put a number on it for your billing rate.

Questions employers ask about this role

What does a Commercial Roofing Foreman do?

The Commercial Roofing Foreman runs the crew on the roof. The foreman sequences tear-off so the building stays dry, inspects the deck as it is exposed, lays out insulation and cover board, directs membrane installation, and details flashings and terminations to the manufacturer approved assembly. The foreman makes the daily call on whether the weather lets the work go on. On a surface where the fall hazard is the work area itself, the foreman owns crew safety. The full description below lists 15 essential duties in trade terms, with physical demands and frequencies.

What qualifications does a Commercial Roofing Foreman need?

7 requirements are written as non-negotiable for this seat. The first 3: Five years commercial roofing experience with at least two years running a crew as a foreman or lead; Hands-on competence in at least two of TPO, PVC, EPDM, modified bitumen or built-up roofing, including flashings and terminations; Ability to read roof plans, details and the manufacturer specification for an approved assembly. A further 6 qualifications are preferred rather than required, which is the distinction that decides whether a good candidate gets screened out by your own posting.

What credentials should I verify before making an offer to a Commercial Roofing Foreman?

4 credentials on this role are either required outright or required where the state requires it: OSHA 10-Hour Construction, Fall Protection Competent Person Training, CERTA Torch Applicator Certification and Driver License and Motor Vehicle Record. Each one has a named place to verify it in the table below. Verify before the offer rather than after; a credential taken on trust at offer is the most expensive line in a job description.

Is a Commercial Roofing Foreman exempt or non-exempt?

Non-exempt — confirm with counsel. FLSA status turns on the duties actually performed rather than the job title, and the duties for this seat are listed below so a classification decision has something to rest on. We are not lawyers and the note here is a starting point for counsel, not a determination.

What should a Commercial Roofing Foreman be paid?

$70,000 to $105,000. My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.

How long does it take to hire a Commercial Roofing Foreman?

My Trade Talent's median commercial roofing hire took 21 days across 12 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.

What is the most common hiring mistake in this seat?

Hiring on square footage installed rather than on detail work and dry-in judgement. Roofs fail at penetrations and terminations, not in the field of the membrane.

Trade Talk A monthly hiring brief for commercial trades employers

What changed in your trade this month, and what to do about it.

One email a month, and only one. We write a separate issue for every trade we recruit in, so you get yours - not a round-up with your trade buried in paragraph nine. Every issue is written for the person actually doing the hiring.

  • Where wages moved in your trade, by market, and what that does to your next offer
  • How long roles like yours are taking to fill, and where it is getting worse
  • Interview and screening tactics that are landing candidates this month
  • What contractors competing for the same people are doing differently

Built on federal wage data, our own closed searches, and what we hear on the desk every week. Written for employers, not candidates. No pitch, no filler, one click to leave.

Pick your trade. That is the one issue you get, once a month.

One email a month. Your trade and your address, nothing else - we do not sell either, and you can unsubscribe from the bottom of any issue. Read this month's issue for your trade first →