Commercial Roofing PM Performance Review Template
Commercial Roofing
5 weighted sections, 24 criteria, on a scale with written anchors. The criteria are things a manager can observe on a job rather than adjectives about a person, which is the difference between a review somebody can prepare for and one they can only receive.
The scale
| Rating | What it means |
|---|---|
| 1 | Does not meet. Specific, repeated and known to the person. |
| 2 | Below the seat. Needs supervision the role is not supposed to need. |
| 3 | Meets the seat. This is the standard, not the consolation. |
| 4 | Above the seat. Others are learning from how they do it. |
| 5 | Rare. Changes how the company does the work. |
A 3 is the standard the seat was hired against, not a disappointment. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing.
How the weighted score works
Each section rating is multiplied by that section's weight; the five results are added and divided by 100. Worked through with this role's own weightings, for an illustrative Commercial Roofing PM who is strong on the trade itself, standard on output and safety, and below the seat on communication:
| Section | Weight | Example rating | Weighted |
|---|---|---|---|
| A. Technical skill and execution | 25% | 4 | 1.00 |
| B. Productivity and measured results | 20% | 3 | 0.60 |
| C. Safety and compliance | 15% | 3 | 0.45 |
| D. Communication and customer handling | 25% | 2 | 0.50 |
| E. Reliability, teamwork and development | 15% | 3 | 0.45 |
| Overall | 100% | 3.00 |
3.00 on a scale where 3.00 is the seat performed to standard. The total is the least interesting number in that table. A 2 in one section can sit inside a total that reads as unremarkable, which is exactly why the section scores go on the form and the conversation happens section by section rather than about an average. The ratings above are an illustration, not a finding about anyone.
A. Technical skill and execution 25%
| Criterion | What good looks like |
|---|---|
| System and assembly knowledge | Submittals match the specified system and the approved assembly without correction by the manufacturer; cite a submittal approved on first review |
| Pre-construction investigation | Core cuts, moisture scans and pullout tests are completed and reported before tear-off on every reroof; name the jobs |
| Field verification of installed work | Documents roof walks with photographs and catches an assembly or detail deviation before it is covered |
| Warranty requirement control | Notice of intent, crew certification and inspection scheduling are in place before mobilization on every warranted roof |
| Problem resolution | Resolves a substrate, slope or detail conflict with the design team in writing rather than letting the field improvise; cite the job |
B. Productivity and measured results 20%
| Criterion | What good looks like |
|---|---|
| Margin performance | Assigned roofs close at or above bid margin, with variances explained in the monthly cost review |
| Crew scheduling utilization | Crews assigned to this seat work scheduled days with minimal weather or material idle time; evidenced by the weekly schedule and payroll |
| Procurement timing | Long-lead insulation, membrane and custom metal arrive before need date; no documented crew standby caused by a late order |
| Change order conversion | Found-condition work is priced and signed before installation in most cases, with open items reported by age |
| Billing and closeout timing | Pay applications submitted on time and closeout packages delivered within the agreed window after substantial completion |
C. Safety and compliance 15%
| Criterion | What good looks like |
|---|---|
| Site-specific plans issued | Every assigned roof has a written fall protection and access plan before the crew mobilizes |
| Audit findings closed | Safety observations from roof walks are documented and closed with the foreman within the week |
| Hot work and crane planning | Permits, fire watch, lift plans and exclusion zones are arranged before torch, kettle or crane operations |
| Incident participation | Contributes to investigation and written corrective action for any incident on an assigned roof |
D. Communication and customer handling 25%
| Criterion | What good looks like |
|---|---|
| Owner and general contractor confidence | The customer reports being told about deck conditions and schedule changes before they became problems; cite feedback or a repeat award |
| Documentation of found conditions | Deck and substrate findings are reported with dated photographs the same day they are exposed |
| Crew and foreman direction | Foremen receive scope, sequence, material status and dates before the week starts, confirmed in a standing meeting |
| Warranty and leak response | Leak calls on completed roofs get a dispatched response and a written cause determination within the committed time |
| Internal reporting | Shows up to operations review with current cost, schedule and procurement status for every assigned job |
E. Reliability, teamwork and development 15%
| Criterion | What good looks like |
|---|---|
| Commitment follow-through | Action items are closed by the date promised; carryover items are flagged rather than discovered |
| Administrative timeliness | Timesheet approvals, invoice coding and expense reports complete each weekly cycle |
| Support of estimating and service | Feeds production rates, vendor pricing and field conditions back into bids and service history; name a bid or claim supported |
| Foreman development | Coaches foremen on documentation, quantity reporting and manufacturer requirements, and names one developed during the year |
| Own development | Completes an agreed credential or manufacturer training during the review year |
What this seat is measured on day to day
| Measure | What it captures |
|---|---|
| Job margin at closeout versus bid margin | Whether the roof finished at the margin the company sold |
| Warranty issued within 30 days of final manufacturer inspection | Whether closeout paperwork is complete enough for the owner to receive the warranty |
| Substrate change orders approved before the work is installed | Whether found deck conditions are documented and priced rather than absorbed |
| Crew days scheduled against crew days available | Utilization across the crews this seat schedules |
| Open roof area against the forecast window | Whether dry-in exposure is being planned rather than discovered |
| Leak callbacks on completed roofs in the first twelve months | Workmanship and detail quality seen after the crews leave |
| On-time billing and retention release | Whether cash is being collected on schedule |
The same measures the job description for this role is written against, so the document you hire against and the document you rate against are measuring one thing.
Where this person goes next
Roofing PMs move to senior PM or operations manager, and some move to the manufacturer side as technical representatives.
The review is the natural place for this conversation and the wrong place to have it for the first time. Someone hearing about the next seat in the same meeting as their rating hears it as consolation. Say it in advance, then use the review to say how far along they are.
The pay conversation
My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.
A review that produces a number and no pay decision is a review the employee will discount next year. One that produces a pay decision made in the same half hour is usually a decision made on the last thing discussed. Know where the person sits in the band before the meeting, and treat the rating as evidence for a decision you take afterwards.
Nothing here sets pay. What a rating is worth depends on your margins, your bands and your state, and those are yours.
What it costs if this one leaves
My Trade Talent's median commercial roofing hire took 21 days across 9 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
Worth knowing before the meeting rather than after it. The question a retention decision actually turns on is not whether a raise is deserved but what the seat costs empty for that long, and the calculator will put a figure on it for your billing rate.
Before you use it
Move the weightings to match how your business makes money, and move them before the review rather than after you have seen the scores. The split here is a starting point, not a judgement about your company.
Against every criterion, write the job, the date or the customer that evidences it. A criterion with nothing written beside it has not been met, however well the person is getting on, because you are about to make a decision and an impression is not evidence.
What follows from the result is yours. Pay, promotion and a development plan depend on your margins, your bands and your state, and nothing here sets them.
Questions employers ask about reviewing this role
How do you score an annual review for a Commercial Roofing PM?
5 sections, weighted to 25%, 20%, 15%, 25%, 15% in that order, each rated 1 to 5 against written anchors. Multiply each section rating by its weight, add the five results and divide by 100; the worked example on this page does it in full. A 3.00 is the seat performed to the standard it was hired against.
What should a rating of 3 mean?
Meets the seat. It is the standard, not the consolation. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing and defends nothing if the decision is ever questioned.
How many criteria does this review cover?
24 across 5 sections, all of them things a manager can observe on a job rather than adjectives about a person. Each one has what good looks like written out beside it, which is the difference between a review somebody can prepare for and one they can only receive.
Should the review set pay?
Not by itself, and nothing here does. The instrument tells you how the work was performed against the seat. What follows - a raise, a promotion, a development plan or none of them - depends on your margins, your bands and your state. For reference, the band for this role is $85,000 to $135,000.
What do I do with a 2 in one section?
Name the job, the date or the customer that evidences it, say what meeting the seat would look like instead, and put a date on when you will look again. A 2 with no evidence beside it is an impression, and an impression is not something you can ask someone to improve. A 2 that sits inside an acceptable overall total is also the most common thing a single summary number hides, which is why the section scores go on the form.
Can I change the weightings?
Yes, and you should if they do not match how your business makes money. Change them before the review rather than after you have seen the scores, and change them for the seat rather than the person. The split here is a starting point.
What is the next step up from Commercial Roofing PM?
Roofing PMs move to senior PM or operations manager, and some move to the manufacturer side as technical representatives.
What does it cost if a Commercial Roofing PM leaves?
My Trade Talent's median commercial roofing hire took 21 days across 9 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. That is the refill clock; the cost of the vacancy runs alongside it from the day the seat empties.
One time
Where should we send it?
Tell us who you are once and every document on this site downloads for you from then on, with no form in the way. We are a recruiting firm: someone may call about the roles you are hiring for.