Commercial Roofing PM Job Description
Commercial Roofing
The Commercial Roofing Project Manager owns assigned roofing jobs from award through warranty. The role drives submittals and manufacturer approvals, procures long-lead systems and custom metal, schedules crews and equipment across several roofs at once, prices change orders for the deck and substrate conditions found at tear-off, and assembles the closeout paperwork the warranty depends on. Margin, dry-in exposure and warranty issuance all sit with this seat.
What this seat pays
My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.
Pay, location and the date prepared are blank in the Word version on purpose. They depend on your market and your margins, and a template that guesses at them is worse than one that leaves them to you. The figure above is here so the guess is at least anchored.
The seat
| Reports to | Director of Operations |
| Direct reports | None direct (schedules and directs 2 to 6 field crews through their foremen) |
| FLSA status | Typically exempt — confirm with counsel |
| Trade | Commercial Roofing |
| Pay band | $85,000 to $135,000 — My Trade Talent band |
Where the role goes next. Roofing PMs move to senior PM or operations manager, and some move to the manufacturer side as technical representatives.
Essential duties (15)
- Review the awarded contract for scope, exclusions, allowances, retention, liquidated damages, bonding and insurance terms, and escalate any term outside company standards before signature.
- Prepare submittal packages including system approval letters, fire and wind uplift listings, insulation R value, fastener pullout test results and color samples.
- Secure the manufacturer notice of intent for the warranty and confirm the installing crew holds the required certification before mobilization.
- Order long-lead items including insulation, membrane, edge metal, coping, custom sheet metal, hatches and skylights against published lead times, and schedule crane or hoist service.
- Publish a weekly crew and equipment schedule across all assigned roofs, balancing manpower, certification, dry-in exposure and the weather forecast.
- Run the pre-construction deck survey with core cuts, moisture scans and fastener pullout testing, and distribute the findings to the design team and owner in writing.
- Price and submit change orders for deck replacement, saturated insulation, additional nailers and unforeseen substrate conditions, supported by dated photographs and agreed unit prices.
- Prepare the monthly pay application with stored materials, and track retention, lien waivers and vendor releases.
- Run a monthly job cost review comparing squares installed, labor hours spent, committed material cost and forecast cost to complete.
- Coordinate rooftop equipment, curbs, sleepers, solar attachments and other trades work with the general contractor overall schedule.
- Build a site-specific safety plan for each roof covering fall protection, roof access, hot work and crane picks, and support the foreman in executing it.
- Walk each roof on a regular cycle to verify the installation matches the approved assembly and that billed quantities match installed quantities.
- Complete closeout with as-builts, O and M documents, final manufacturer inspection sign-off, punch list completion, warranty registration and owner maintenance instructions.
- Respond to leak calls and warranty claims on recently completed roofs, dispatch service, and determine whether the cause is workmanship, material or owner damage.
- Approve field timesheets and vendor invoices weekly, code them to the job, and reconcile deliveries against purchase orders.
Qualifications
- Four years managing commercial roofing projects, or equivalent experience as a roofing superintendent or estimator moving into project management.
- Working knowledge of low-slope systems including TPO, PVC, EPDM, modified bitumen and built-up, and of manufacturer warranty requirements.
- Ability to read roof plans, details and specifications and to perform a roof takeoff.
- Demonstrated experience with submittals, change order pricing, pay applications and warranty closeout documentation.
- Ability to access roofs by extension ladder, fixed ladder and hatch and to walk roofs at height during inspections.
- Valid driver license and insurable record, with daily travel between roofs, the office and suppliers.
- OSHA 10 at minimum, with awareness-level fall protection training.
- Proficiency with scheduling and project management software and with spreadsheets for job cost.
- Manufacturer training on the systems the company installs and working relationships with local field representatives.
- IIBEC Registered Roof Observer or similar roof consulting credential.
- Architectural sheet metal background covering edge metal, coping and custom flashings.
- Experience with reroofing occupied buildings such as schools, hospitals and distribution centers.
- Experience with aerial measurement and takeoff software.
- OSHA 30 and fall protection competent person training.
- Bilingual English and Spanish.
The line between these two columns is the one that costs you candidates. Everything in the preferred column that gets written into a posting as a requirement removes people who could do the job, and in a trade with a shortage that is a self-inflicted wound.
Credentials, and who verifies them
| Credential | Status | Verify with |
|---|---|---|
| OSHA 30-Hour Construction | Preferred | Card copy plus OSHA Outreach trainer verification |
| Manufacturer Approved Applicator Credential for the systems sold | Required | Manufacturer contractor portal and field representative |
| Driver License and Motor Vehicle Record | Required | State motor vehicle record pulled through the company insurance carrier |
| IIBEC Registered Roof Observer | Preferred | IIBEC credential directory |
| Fall Protection Competent Person Training | Preferred | Training provider certificate on file with the safety manager |
Verify before an offer rather than after. A credential taken on trust at offer is the most expensive line on this page. We track commercial roofing licensing in 36 states; which of them applies depends on where the work is, not where the company is.
Physical demands
| Activity | Frequency |
|---|---|
| Sitting at a workstation working submittals, schedules, job cost and email | Frequent (1/3 to 2/3 of shift) |
| Driving between roofs, the office, suppliers and the manufacturer | Frequent (1/3 to 2/3 of shift) |
| Climbing extension ladders, fixed ladders and roof hatches to reach roof level | Occasional (under 1/3 of shift) |
| Walking and standing on low-slope roofs, including over gravel, ballast and loose insulation | Occasional (under 1/3 of shift) |
| Working at height near unprotected roof edges during inspection walks | Occasional (under 1/3 of shift) |
| Exposure to outdoor heat, cold, wind and glare during roof walks | Occasional (under 1/3 of shift) |
| Lifting and carrying drawings, samples and core cut or scan equipment up to 30 pounds | Occasional (under 1/3 of shift) |
| Stooping and kneeling to examine core cuts, drains, seams and flashing details | Occasional (under 1/3 of shift) |
| Near and far visual acuity to read drawings and judge installed work and color match | Constant (over 2/3 of shift) |
| Talking and hearing by phone and radio, in meetings and on a windy roof | Constant (over 2/3 of shift) |
| Wearing hard hat, safety glasses, high-visibility vest and work boots on site | Occasional (under 1/3 of shift) |
This is the section a reasonable accommodation decision actually turns on, which is why it is role specific rather than copied across a trade. An estimator sits and walks sites; a screed operator stands beside hot asphalt all day.
Work environment
Work splits between an office or jobsite trailer and active roofs. Roof visits mean exposure to heat, cold, wind, glare and the same edge, skylight and opening hazards the crews face, plus hot asphalt, torches, solvent fumes and live rooftop equipment. Occupied building work brings badging, noise and odor restrictions, and night or weekend shutdown windows. Several roofs are visited in a day and overnight travel is occasional.
Tools and equipment
The employer provides a laptop, phone or tablet with plan and project management software, a company vehicle or allowance, moisture meter, infrared camera, core cutter, pullout tester, hard hat, vest, glasses and harness when needed. The project manager is expected to own work boots, weather-appropriate clothing, a tape measure and a knife for core sampling and field verification.
How performance is measured
| Measure | What it captures |
|---|---|
| Job margin at closeout versus bid margin | Whether the roof finished at the margin the company sold |
| Warranty issued within 30 days of final manufacturer inspection | Whether closeout paperwork is complete enough for the owner to receive the warranty |
| Substrate change orders approved before the work is installed | Whether found deck conditions are documented and priced rather than absorbed |
| Crew days scheduled against crew days available | Utilization across the crews this seat schedules |
| Open roof area against the forecast window | Whether dry-in exposure is being planned rather than discovered |
| Leak callbacks on completed roofs in the first twelve months | Workmanship and detail quality seen after the crews leave |
| On-time billing and retention release | Whether cash is being collected on schedule |
These are the same measures the annual review for this role is built on, so the document you hire against and the document you rate against are measuring one thing.
Reading a resume for this seat
What separates a strong Commercial Roofing PM from a plausible one, on paper and in the first ten minutes of a call:
- Understands that the manufacturer warranty is a document trail, not a handshake
- Has scheduled around weather and material lead times as a normal constraint rather than an excuse
- Can describe pricing a deck-condition change order that was found after tear-off
Screen for it: 3 questions and what a strong answer contains
A job description tells you what you need. These tell you whether the person in front of you has it. Each one comes with what a strong answer contains, because an interviewer who does not know that is persuaded by fluency, which is exactly what the question was supposed to see past.
What does a manufacturer need from you before they will issue an NDL warranty?
What a strong answer containsKnows it starts before the job: an approved contractor status, an approved assembly and details submitted and accepted, and the specified components rather than substitutions bought on price. Then the field record - the inspection at the agreed stages, the tie-ins and details photographed, the fastener pull-test results, and the completed roof passing the manufacturer's final inspection with the punch items closed. Finally the paperwork and the fee. Says what has held a warranty up for them before.
Follow up with: What has a manufacturer refused to warrant on one of your jobs, and why?
Three roofs, two crews, and a week of rain. How do you re-sequence?
What a strong answer containsDecides on exposure rather than on convenience: which building is open, which has the most at risk underneath, which owner has the least tolerance, and which roof can be dried in and left safely. Moves crews to the work the weather allows - details, metal, interior protection, surveys - instead of standing them down. Rings all three customers before they ring in, with a revised date rather than an apology. Knows which of the three has a contractual date that actually matters.
Follow up with: Which of the three customers do you call first, and what do you tell them?
How do you price and document unforeseen deck replacement?
What a strong answer containsHas a unit rate for deck replacement in the contract from the start, so the conversation at the time is about quantity rather than price. Documents it as it is found: photographs with location and scale, quantities measured and signed in the field by the owner's representative or the general contractor that day, and notice given before the work is covered. Knows that deck found and replaced without same-day agreement is deck replaced for nothing.
Follow up with: Is there a deck unit rate in your current contracts, and who signs off the quantity?
The mistake this seat invites
Treating the role as general construction project management. Roofing is warranty-driven and weather-driven in ways other trades are not.
How long this takes to fill
My Trade Talent's median commercial roofing hire took 21 days across 12 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
Worth writing on the requisition before you post it. The cost of the vacancy runs from the day the seat empties, not from the day you start looking, and the calculator will put a number on it for your billing rate.
Questions employers ask about this role
What does a Commercial Roofing PM do?
The Commercial Roofing Project Manager owns assigned roofing jobs from award through warranty. The role drives submittals and manufacturer approvals, procures long-lead systems and custom metal, schedules crews and equipment across several roofs at once, prices change orders for the deck and substrate conditions found at tear-off, and assembles the closeout paperwork the warranty depends on. Margin, dry-in exposure and warranty issuance all sit with this seat. The full description below lists 15 essential duties in trade terms, with physical demands and frequencies.
What qualifications does a Commercial Roofing PM need?
8 requirements are written as non-negotiable for this seat. The first 3: Four years managing commercial roofing projects, or equivalent experience as a roofing superintendent or estimator moving into project management; Working knowledge of low-slope systems including TPO, PVC, EPDM, modified bitumen and built-up, and of manufacturer warranty requirements; Ability to read roof plans, details and specifications and to perform a roof takeoff. A further 7 qualifications are preferred rather than required, which is the distinction that decides whether a good candidate gets screened out by your own posting.
What credentials should I verify before making an offer to a Commercial Roofing PM?
2 credentials on this role are required outright: Manufacturer Approved Applicator Credential for the systems sold and Driver License and Motor Vehicle Record. Each one has a named place to verify it in the table below. Verify before the offer rather than after; a credential taken on trust at offer is the most expensive line in a job description.
Is a Commercial Roofing PM exempt or non-exempt?
Typically exempt — confirm with counsel. FLSA status turns on the duties actually performed rather than the job title, and the duties for this seat are listed below so a classification decision has something to rest on. We are not lawyers and the note here is a starting point for counsel, not a determination.
What should a Commercial Roofing PM be paid?
$85,000 to $135,000. My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.
How long does it take to hire a Commercial Roofing PM?
My Trade Talent's median commercial roofing hire took 21 days across 12 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
What is the most common hiring mistake in this seat?
Treating the role as general construction project management. Roofing is warranty-driven and weather-driven in ways other trades are not.
One time
Where should we send it?
Tell us who you are once and every document on this site downloads for you from then on, with no form in the way. We are a recruiting firm: someone may call about the roles you are hiring for.