Construction Superintendent Performance Review Template
Commercial Construction
5 weighted sections, 26 criteria, on a scale with written anchors. The criteria are things a manager can observe on a job rather than adjectives about a person, which is the difference between a review somebody can prepare for and one they can only receive.
The scale
| Rating | What it means |
|---|---|
| 1 | Does not meet. Specific, repeated and known to the person. |
| 2 | Below the seat. Needs supervision the role is not supposed to need. |
| 3 | Meets the seat. This is the standard, not the consolation. |
| 4 | Above the seat. Others are learning from how they do it. |
| 5 | Rare. Changes how the company does the work. |
A 3 is the standard the seat was hired against, not a disappointment. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing.
How the weighted score works
Each section rating is multiplied by that section's weight; the five results are added and divided by 100. Worked through with this role's own weightings, for an illustrative Construction Superintendent who is strong on the trade itself, standard on output and safety, and below the seat on communication:
| Section | Weight | Example rating | Weighted |
|---|---|---|---|
| A. Technical skill and execution | 25% | 4 | 1.00 |
| B. Productivity and measured results | 20% | 3 | 0.60 |
| C. Safety and compliance | 20% | 3 | 0.60 |
| D. Communication and customer handling | 20% | 2 | 0.40 |
| E. Reliability, teamwork and development | 15% | 3 | 0.45 |
| Overall | 100% | 3.05 |
3.05 on a scale where 3.00 is the seat performed to standard. The total is the least interesting number in that table. A 2 in one section can sit inside a total that reads as unremarkable, which is exactly why the section scores go on the form and the conversation happens section by section rather than about an average. The ratings above are an illustration, not a finding about anyone.
A. Technical skill and execution 25%
| Criterion | What good looks like |
|---|---|
| Schedule management | Produced a three-week look-ahead every week that matched what was actually built, and can show where the critical path was protected. |
| Trade sequencing | Areas were released to the next trade complete; no significant phase this year required a trade to return because it was sequenced into unfinished work. |
| Quality control before cover-up | Walked and documented concealed work before close-in in every area, with photographs or a checklist on file. |
| Document and conflict command | Found drawing conflicts between disciplines in the field before they were built and converted them into RFIs with the date the answer was needed. |
| Logistics management | Crane time, deliveries, laydown, temporary power and traffic control were planned ahead, and no trade lost a day to a logistics failure this year. |
B. Productivity and measured results 20%
| Criterion | What good looks like |
|---|---|
| Milestone delivery | Hit the contract milestones and the substantial completion date, or the slip was documented and attributed when it occurred. |
| Inspection results | Inspections passed on the first attempt on the large majority of this year's inspections, with each failure corrected inside the week. |
| Punch performance | Pre-punched each trade before the architect's walk, and the architect's punch list closed inside the contract window. |
| Rework and backcharges | Rework on the job stayed under the agreed threshold, and documented subcontractor failures were recovered rather than absorbed. |
| Manpower accountability | Subcontractor manpower matched committed counts most weeks, with shortfalls documented in writing the week they happened. |
C. Safety and compliance 20%
| Criterion | What good looks like |
|---|---|
| Site safety program execution | The site-specific safety plan was in place and enforced across all trades, and the weekly all-trades meeting was held and documented every week. |
| Incident and near miss handling | Every incident and near miss was reported inside the required window, investigated, and closed with a recorded corrective action. |
| Audit and inspection outcomes | Internal and insurer safety audits met the company's score target, and no citation or stop-work order was issued on this site. |
| Stopping unsafe work | Stopped unsafe work regardless of which subcontractor's crew it was and recorded it; repeat offenders were escalated in writing. |
| Hazard-specific compliance | Excavation, scaffold, fall protection, confined space, silica and hot work requirements were met with competent person sign-offs on file. |
D. Communication and customer handling 20%
| Criterion | What good looks like |
|---|---|
| Coordination meetings | Ran the weekly subcontractor meeting with an agenda and published minutes within a day; attendance and commitments are on record. |
| Daily reporting | The daily report and progress photographs were filed for every working day, detailed enough to support a delay claim. |
| Owner and architect interaction | Walked the owner's representative and the architect through progress and problems on a set cadence, and neither was surprised at a meeting. |
| Working with the project manager | Field and office gave the owner and the trades one consistent answer, and disputes were settled internally first. |
| Documenting subcontractor performance | Failures to perform were put in writing to the subcontractor at the time, not reconstructed months later. |
| Inspector and authority relationships | Inspections were scheduled and prepared for, and correction notices were resolved without escalation at the building department. |
E. Reliability, teamwork and development 15%
| Criterion | What good looks like |
|---|---|
| Presence on site | On site before the trades start every working day; absences were planned and covered by an assistant or the project manager. |
| Administrative deadlines | Daily reports, time approvals, look-aheads and safety documentation were submitted on their cycle without being chased. |
| Developing field staff | Developed a foreman or assistant superintendent with specific delegated responsibility, and that person ran a scope they could not have run a year ago. |
| Mobilization and demobilization | The site was mobilized and demobilized on plan, with temporary facilities, final cleaning and turnover complete on the agreed date. |
| Own development | Completed a safety, scheduling or project-type training this year and applied it on this job. |
What this seat is measured on day to day
| Measure | What it captures |
|---|---|
| Schedule performance against the baseline and the look-ahead | Milestones hit, and whether the three-week look-ahead actually predicted what happened |
| Inspection pass rate on the first attempt | Work walked and corrected before the inspector arrived |
| Recordable incident rate and safety audit scores on the site | Whether the site is actually run safely across all trades |
| Rework and backcharge dollars on the job | Work rebuilt, and subcontractor failures documented and recovered |
| Punch list volume at substantial completion and days to closure | Whether quality was managed through the build or deferred to the end |
| Subcontractor manpower against committed manpower | Whether coordination meetings produce real commitments |
| Daily reports and photographs complete for every working day | The field record the company needs for delay and change claims |
The same measures the job description for this role is written against, so the document you hire against and the document you rate against are measuring one thing.
Where this person goes next
Superintendents progress to general superintendent or project executive, and some move into operations.
The review is the natural place for this conversation and the wrong place to have it for the first time. Someone hearing about the next seat in the same meeting as their rating hears it as consolation. Say it in advance, then use the review to say how far along they are.
The pay conversation
My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.
A review that produces a number and no pay decision is a review the employee will discount next year. One that produces a pay decision made in the same half hour is usually a decision made on the last thing discussed. Know where the person sits in the band before the meeting, and treat the rating as evidence for a decision you take afterwards.
Nothing here sets pay. What a rating is worth depends on your margins, your bands and your state, and those are yours.
What it costs if this one leaves
My Trade Talent's median commercial construction hire took 14 days across 13 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
Worth knowing before the meeting rather than after it. The question a retention decision actually turns on is not whether a raise is deserved but what the seat costs empty for that long, and the calculator will put a figure on it for your billing rate.
Before you use it
Move the weightings to match how your business makes money, and move them before the review rather than after you have seen the scores. The split here is a starting point, not a judgement about your company.
Against every criterion, write the job, the date or the customer that evidences it. A criterion with nothing written beside it has not been met, however well the person is getting on, because you are about to make a decision and an impression is not evidence.
What follows from the result is yours. Pay, promotion and a development plan depend on your margins, your bands and your state, and nothing here sets them.
Questions employers ask about reviewing this role
How do you score an annual review for a Construction Superintendent?
5 sections, weighted to 25%, 20%, 20%, 20%, 15% in that order, each rated 1 to 5 against written anchors. Multiply each section rating by its weight, add the five results and divide by 100; the worked example on this page does it in full. A 3.00 is the seat performed to the standard it was hired against.
What should a rating of 3 mean?
Meets the seat. It is the standard, not the consolation. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing and defends nothing if the decision is ever questioned.
How many criteria does this review cover?
26 across 5 sections, all of them things a manager can observe on a job rather than adjectives about a person. Each one has what good looks like written out beside it, which is the difference between a review somebody can prepare for and one they can only receive.
Should the review set pay?
Not by itself, and nothing here does. The instrument tells you how the work was performed against the seat. What follows - a raise, a promotion, a development plan or none of them - depends on your margins, your bands and your state. For reference, the band for this role is $85,000 to $145,000.
What do I do with a 2 in one section?
Name the job, the date or the customer that evidences it, say what meeting the seat would look like instead, and put a date on when you will look again. A 2 with no evidence beside it is an impression, and an impression is not something you can ask someone to improve. A 2 that sits inside an acceptable overall total is also the most common thing a single summary number hides, which is why the section scores go on the form.
Can I change the weightings?
Yes, and you should if they do not match how your business makes money. Change them before the review rather than after you have seen the scores, and change them for the seat rather than the person. The split here is a starting point.
What is the next step up from Construction Superintendent?
Superintendents progress to general superintendent or project executive, and some move into operations.
What does it cost if a Construction Superintendent leaves?
My Trade Talent's median commercial construction hire took 14 days across 13 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. That is the refill clock; the cost of the vacancy runs alongside it from the day the seat empties.
One time
Where should we send it?
Tell us who you are once and every document on this site downloads for you from then on, with no form in the way. We are a recruiting firm: someone may call about the roles you are hiring for.