Construction Superintendent Job Description

Commercial Construction

Owns the commercial jobsite: the schedule, subcontractor sequencing, inspections, safety, site logistics and the coordination between trades. The superintendent runs the job rather than a crew — deciding who works where and in what order, holding subcontractors to their manpower commitments, and walking the work before the inspector does. The schedule is the deliverable, and the superintendent is the person the general contractor's schedule lives or dies with.

15essential duties
8 / 7required / preferred qualifications
6credentials, each with who verifies it
Take this away as a Word document The same description, formatted for a personnel file, with an acknowledgement signature block at the end. The first download asks for your name, company, work email and phone; after that every document here downloads without a form.
Download .docx

What this seat pays

$85,000 to $145,000 My Trade Talent band

My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.

Pay, location and the date prepared are blank in the Word version on purpose. They depend on your market and your margins, and a template that guesses at them is worse than one that leaves them to you. The figure above is here so the guess is at least anchored.

The seat

Reports toProject Executive
Direct reportsAssistant superintendent, foremen and site laborers; directs all subcontractor crews on site
FLSA statusTypically exempt — confirm with counsel
TradeCommercial Construction
Pay band$85,000 to $145,000 — My Trade Talent band

Where the role goes next. Superintendents progress to general superintendent or project executive, and some move into operations.

Essential duties (15)

  • Build and maintain the three-week look-ahead from the master schedule and update it every week with the subcontractors in the room.
  • Run the weekly subcontractor coordination meeting, take manpower commitments for the coming weeks, and record who committed to what.
  • Sequence the trades floor by floor and area by area so work is not stacked on itself and the critical path is protected.
  • Walk the work daily against the drawings and specifications and reject work that will not pass inspection before the next trade covers it.
  • Schedule and attend municipal, special and owner inspections, prepare the area beforehand, and resolve correction notices the same week.
  • Own site safety: enforce the site-specific safety plan, run the weekly all-trades safety meeting, audit subcontractor pre-task plans, and stop unsafe work regardless of whose crew it is.
  • Manage site logistics — crane and hoist time, laydown areas, deliveries, parking, temporary power and water, fencing, dust and noise controls and traffic control.
  • Write the daily report with manpower by trade, work in place, weather, deliveries, inspections, visitors and delays, and photograph progress and conditions.
  • Hold subcontractors to contract scope in the field, document failures to perform in writing when they happen, and escalate to the project manager before a backcharge is needed.
  • Manage the punch list process: pre-punch with each trade, drive the architect's punch to closure, and verify items rather than taking a trade's word for them.
  • Run building layout and control, verify benchmarks and control lines, and reconcile field conditions against the drawings.
  • Identify field conditions, interferences and design gaps, write the RFI or give the project manager what is needed to write it, and track the answer against the date it is needed.
  • Coordinate commissioning, start-up and owner training with the mechanical, electrical and controls contractors, and make the building available in the condition the test scripts require.
  • Manage mobilization and demobilization, temporary facilities, final cleaning and turnover of the building to the owner.
  • Approve subcontractor manpower counts and extra work tickets, and keep a field record that will support or defeat a later change claim.

Qualifications

Required
  • Seven or more years on commercial construction, including three or more running a job as superintendent or assistant superintendent.
  • Able to build and update a three-week look-ahead and read a CPM schedule, including float and the critical path.
  • Able to read full construction document sets — architectural, structural, mechanical, electrical and civil — and find the conflicts between them.
  • OSHA 30 construction.
  • Current First Aid and CPR certification.
  • Valid driver's license and an insurable driving record.
  • Able to walk a multi-story building under construction all day, climb ladders and stairs, and work outdoors in all weather.
  • Able to run a coordination meeting with subcontractor foremen and leave with commitments on record.
Preferred
  • Experience as a trade foreman before moving into superintendence.
  • Experience on the project type the company builds — healthcare, education, industrial, multifamily or tenant improvement.
  • Competent person training for excavation, scaffold, fall protection and confined space.
  • Scheduling experience in Primavera P6 or Microsoft Project, and field software such as Procore or Autodesk Build.
  • Experience taking a project through third party commissioning and a formal turnover process.
  • STSC, CHST or an equivalent construction safety credential.
  • Bilingual English and Spanish well enough to give safety direction and task instruction.

The line between these two columns is the one that costs you candidates. Everything in the preferred column that gets written into a posting as a requirement removes people who could do the job, and in a trade with a shortage that is a self-inflicted wound.

Credentials, and who verifies them

CredentialStatusVerify with
OSHA 30 constructionRequiredTraining provider card and DOL card number
First Aid and CPRRequiredTraining provider card, refreshed every two years
Competent person training for excavation, scaffold, fall protection and confined spaceRequiredTraining provider records matched to the project's hazards
Construction safety credential such as STSC or CHSTPreferredIssuing body certification registry
State trade or contractor licenseWhere the state requires itState licensing board lookup
Valid driver's licenseRequiredMotor vehicle record run through the company insurer

Verify before an offer rather than after. A credential taken on trust at offer is the most expensive line on this page. We track commercial construction licensing in 38 states; which of them applies depends on where the work is, not where the company is.

Physical demands

ActivityFrequency
Walking the site, including multiple floors, stairs and unfinished areasConstant (over 2/3 of shift)
Standing in coordination meetings, inspections and punch walksFrequent (1/3 to 2/3 of shift)
Climbing ladders, stairs and scaffold to inspect workFrequent (1/3 to 2/3 of shift)
Exposure to outdoor heat, cold, rain, mud and windFrequent (1/3 to 2/3 of shift)
Sitting in the job trailer working the schedule, daily report and emailFrequent (1/3 to 2/3 of shift)
Exposure to construction noise above 85 decibels, dust and silicaFrequent (1/3 to 2/3 of shift)
Bending, kneeling and crouching to inspect installed workOccasional (under 1/3 of shift)
Working at heights, on roofs, from lifts and near leading edges in fall protectionOccasional (under 1/3 of shift)
Lifting and carrying up to 25 pounds of drawings, samples and equipmentOccasional (under 1/3 of shift)
Driving between the site, the office and municipal or owner officesOccasional (under 1/3 of shift)
Entering confined spaces, excavations and crawl spaces to verify workOccasional (under 1/3 of shift)
Performing hands-on installation work with toolsRarely

This is the section a reasonable accommodation decision actually turns on, which is why it is role specific rather than copied across a trade. An estimator sits and walks sites; a screed operator stands beside hot asphalt all day.

Work environment

An active commercial jobsite and the trailer beside it, from sitework through turnover. Conditions include heat, cold, rain, mud, dust, silica and noise, with work proceeding around cranes, excavators, lifts, trucks and every trade on site at once. Hazards include falls, excavations, overhead loads, temporary power, struck-by exposure and incomplete guarding. Early starts are standard, and pours, shutdowns, inspections and turnover bring night and weekend work.

Tools and equipment

The company provides the trailer, laptop, phone, tablet, vehicle or allowance, plan printing, layout instruments, scheduling and field software licenses, radios and all PPE other than boots. The superintendent is expected to own steel toe boots, a tape and basic hand tools, and to keep the issued tablet and radios in service.

How performance is measured

MeasureWhat it captures
Schedule performance against the baseline and the look-aheadMilestones hit, and whether the three-week look-ahead actually predicted what happened
Inspection pass rate on the first attemptWork walked and corrected before the inspector arrived
Recordable incident rate and safety audit scores on the siteWhether the site is actually run safely across all trades
Rework and backcharge dollars on the jobWork rebuilt, and subcontractor failures documented and recovered
Punch list volume at substantial completion and days to closureWhether quality was managed through the build or deferred to the end
Subcontractor manpower against committed manpowerWhether coordination meetings produce real commitments
Daily reports and photographs complete for every working dayThe field record the company needs for delay and change claims

These are the same measures the annual review for this role is built on, so the document you hire against and the document you rate against are measuring one thing.

Reading a resume for this seat

What separates a strong Construction Superintendent from a plausible one, on paper and in the first ten minutes of a call:

  • Talks in sequence and constraint rather than trades and tasks
  • Has run inspections and closeout, not just the productive middle of a job
  • Can describe recovering a slipped schedule with specifics

Screen for it: 3 questions and what a strong answer contains

A job description tells you what you need. These tell you whether the person in front of you has it. Each one comes with what a strong answer contains, because an interviewer who does not know that is persuaded by fluency, which is exactly what the question was supposed to see past.

You are three weeks behind at the halfway point. Walk me through the recovery plan.

What a strong answer contains

Finds the critical path before adding bodies, because overtime on non-critical work buys nothing. Separates what was lost to their own production from what was lost to design, weather or owner decisions, since the second kind is a time extension conversation and the first is theirs to fix. Puts up a plan with named activities, resequencing, added crews or shifts, and a cost against each, then tells the project manager and the owner what recovery costs rather than quietly absorbing it.

Follow up with: On the last job you recovered, who paid for the acceleration?

How do you run a subcontractor who is under-manning your job for a better one elsewhere?

What a strong answer contains

Establishes the fact first, in writing, by tracking manpower against what they committed to, day by day, so the conversation is about a record rather than an impression. Goes to the sub's management rather than arguing with their foreman, who cannot fix it. Knows what the subcontract allows - notice, supplementing the crew, backcharging - and uses the sequence rather than jumping to the end. Keeps the relationship intact if they can, because the replacement is usually slower and dearer.

Follow up with: Walk me through the last time you put a sub on notice. What happened next?

What does your closeout process look like, and when does it start?

What a strong answer contains

Starts it at buyout, not at substantial completion: the closeout requirements go into each subcontract and the submittal log at the beginning, so warranties, as-builts, O and M manuals, attic stock and training are collected as the work finishes rather than chased from subs who have left. Tracks it as a log with names and dates. Says what they hold retention against, and why final payment sliding is almost always a document problem rather than a work problem.

Follow up with: What is the one closeout document that is always late, and how do you get it early?

The mistake this seat invites

Hiring a strong foreman into the seat and finding they still run a crew rather than a job. It is the single most common failure in this role.

How long this takes to fill

My Trade Talent's median commercial construction hire took 14 days across 13 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.

Worth writing on the requisition before you post it. The cost of the vacancy runs from the day the seat empties, not from the day you start looking, and the calculator will put a number on it for your billing rate.

Questions employers ask about this role

What does a Construction Superintendent do?

Owns the commercial jobsite: the schedule, subcontractor sequencing, inspections, safety, site logistics and the coordination between trades. The superintendent runs the job rather than a crew — deciding who works where and in what order, holding subcontractors to their manpower commitments, and walking the work before the inspector does. The schedule is the deliverable, and the superintendent is the person the general contractor's schedule lives or dies with. The full description below lists 15 essential duties in trade terms, with physical demands and frequencies.

What qualifications does a Construction Superintendent need?

8 requirements are written as non-negotiable for this seat. The first 3: Seven or more years on commercial construction, including three or more running a job as superintendent or assistant superintendent; Able to build and update a three-week look-ahead and read a CPM schedule, including float and the critical path; Able to read full construction document sets — architectural, structural, mechanical, electrical and civil — and find the conflicts between them. A further 7 qualifications are preferred rather than required, which is the distinction that decides whether a good candidate gets screened out by your own posting.

What credentials should I verify before making an offer to a Construction Superintendent?

5 credentials on this role are either required outright or required where the state requires it: OSHA 30 construction, First Aid and CPR, Competent person training for excavation, State trade or contractor license and Valid driver's license. Each one has a named place to verify it in the table below. Verify before the offer rather than after; a credential taken on trust at offer is the most expensive line in a job description.

Is a Construction Superintendent exempt or non-exempt?

Typically exempt — confirm with counsel. FLSA status turns on the duties actually performed rather than the job title, and the duties for this seat are listed below so a classification decision has something to rest on. We are not lawyers and the note here is a starting point for counsel, not a determination.

What should a Construction Superintendent be paid?

$85,000 to $145,000. My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.

How long does it take to hire a Construction Superintendent?

My Trade Talent's median commercial construction hire took 14 days across 13 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.

What is the most common hiring mistake in this seat?

Hiring a strong foreman into the seat and finding they still run a crew rather than a job. It is the single most common failure in this role.

Trade Talk A monthly hiring brief for commercial trades employers

What changed in your trade this month, and what to do about it.

One email a month, and only one. We write a separate issue for every trade we recruit in, so you get yours - not a round-up with your trade buried in paragraph nine. Every issue is written for the person actually doing the hiring.

  • Where wages moved in your trade, by market, and what that does to your next offer
  • How long roles like yours are taking to fill, and where it is getting worse
  • Interview and screening tactics that are landing candidates this month
  • What contractors competing for the same people are doing differently

Built on federal wage data, our own closed searches, and what we hear on the desk every week. Written for employers, not candidates. No pitch, no filler, one click to leave.

Pick your trade. That is the one issue you get, once a month.

One email a month. Your trade and your address, nothing else - we do not sell either, and you can unsubscribe from the bottom of any issue. Read this month's issue for your trade first →