5 weighted sections, 24 criteria, on a scale with written anchors. The criteria are things a manager can observe on a job rather than adjectives about a person, which is the difference between a review somebody can prepare for and one they can only receive.
The scale
| Rating | What it means |
|---|---|
| 1 | Does not meet. Specific, repeated and known to the person. |
| 2 | Below the seat. Needs supervision the role is not supposed to need. |
| 3 | Meets the seat. This is the standard, not the consolation. |
| 4 | Above the seat. Others are learning from how they do it. |
| 5 | Rare. Changes how the company does the work. |
A 3 is the standard the seat was hired against, not a disappointment. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing.
How the weighted score works
Each section rating is multiplied by that section's weight; the five results are added and divided by 100. Worked through with this role's own weightings, for an illustrative Fire Alarm / Sprinkler Designer who is strong on the trade itself, standard on output and safety, and below the seat on communication:
| Section | Weight | Example rating | Weighted |
|---|---|---|---|
| A. Technical skill and execution | 25% | 4 | 1.00 |
| B. Productivity and measured results | 20% | 3 | 0.60 |
| C. Safety and compliance | 15% | 3 | 0.45 |
| D. Communication and customer handling | 25% | 2 | 0.50 |
| E. Reliability, teamwork and development | 15% | 3 | 0.45 |
| Overall | 100% | 3.00 |
3.00 on a scale where 3.00 is the seat performed to standard. The total is the least interesting number in that table. A 2 in one section can sit inside a total that reads as unremarkable, which is exactly why the section scores go on the form and the conversation happens section by section rather than about an average. The ratings above are an illustration, not a finding about anyone.
A. Technical skill and execution 25%
| Criterion | What good looks like |
|---|---|
| Code application | Cites the NFPA 13 or NFPA 72 section behind layout, spacing and detection decisions, and the design basis is recorded on the drawings |
| Hydraulic calculations | Remote-area calculations are correct and demonstrate adequate margin against current flow test data; cite a project and the calculation summary |
| Layout and obstruction handling | Head and device layout holds spacing and obstruction rules against the reflected ceiling plan without field relocation |
| Buildability | Pipe routing, hanger and bracing details and tie-in points work in the real building; evidenced by low RFI counts on completed projects |
| Fabrication output | Stock lists and spool dimensions match what the shop and field actually need, with shortages and reorders rare |
B. Productivity and measured results 20%
| Criterion | What good looks like |
|---|---|
| Submittal turnaround | Permit packages leave the office by the committed date on nearly all assigned projects; cite the design schedule log |
| Design hours against budget | Completes layout and calculations within the hours estimating carried, with overruns explained by documented scope change |
| First-submission approval rate | Permits approved without resubmission on the majority of projects |
| Revision discipline | Revisions are issued clouded and numbered with the stock list updated, so the field and shop never build from a stale set |
| Design-caused rework | Change orders and field relocations traceable to the design stay below the agreed threshold |
C. Safety and compliance 15%
| Criterion | What good looks like |
|---|---|
| Code edition currency | Designs to the adopted edition and local amendments for each jurisdiction, verified on each submittal cover sheet |
| Listing compliance | Heads, devices, hangers and fittings specified are listed for the application and the installation conditions |
| Credential currency | NICET certification and any state registration remain current throughout the review year |
| Jobsite conduct on verification visits | Follows site safety and badging requirements, wears required protection, and reports hazards observed |
D. Communication and customer handling 25%
| Criterion | What good looks like |
|---|---|
| Plan reviewer handling | Responds to review comments in writing with the code basis and resubmits within the committed time; cite a jurisdiction and the resolution |
| Coordination with the field | Walks the drawings with the foreman or technician before fabrication release on complex areas; name a project and the issue caught |
| Engineer and general contractor communication | Raises specification conflicts and water supply deficiencies in writing early rather than designing around them silently |
| Support to project management and estimating | Delivers takeoffs, head counts and preliminary layouts on time for bids, with design risk flagged in writing |
| Documentation of decisions | Design assumptions, approvals and deviations are recorded in the job file so another designer can pick up the project |
E. Reliability, teamwork and development 15%
| Criterion | What good looks like |
|---|---|
| Commitment follow-through | Submittal and revision dates promised in the design meeting are met; slips are flagged in advance |
| Administrative timeliness | Time against project codes, submittal logs and permit tracking kept current each week |
| Checking and mentoring | Checks a junior designer work or trains on templates and calculation setup, with documented review comments |
| Standards upkeep | Contributes updates to detail libraries, blocks and templates as codes and listings change |
| Own development | Advances a credential or completes training during the review year, such as the next NICET level, CFPS or a software or storage design course |
What this seat is measured on day to day
| Measure | What it captures |
|---|---|
| Plan review comments per submittal | Design quality measured by what the authority having jurisdiction writes back |
| Permits approved on first submission | Whether packages are complete and compliant when they leave the office |
| Hydraulic safety margin against the water supply curve | Whether the design is demonstrably adequate without being wastefully oversized |
| Field RFIs and design-caused change orders per project | Buildability of the drawings once the fitters are in the air |
| Fabrication accuracy | Shop reorders, field shortages and leftover spools traceable to the stock list |
| Design hours per project against budget | Productivity against the hours estimating carried for design |
| Submittals delivered by the committed date | Whether the permit path stays off the critical path |
The same measures the job description for this role is written against, so the document you hire against and the document you rate against are measuring one thing.
Where this person goes next
Designers move to senior designer or design manager, and some move into engineering or plan review.
The review is the natural place for this conversation and the wrong place to have it for the first time. Someone hearing about the next seat in the same meeting as their rating hears it as consolation. Say it in advance, then use the review to say how far along they are.
The pay conversation
My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.
A review that produces a number and no pay decision is a review the employee will discount next year. One that produces a pay decision made in the same half hour is usually a decision made on the last thing discussed. Know where the person sits in the band before the meeting, and treat the rating as evidence for a decision you take afterwards.
Nothing here sets pay. What a rating is worth depends on your margins, your bands and your state, and those are yours.
What it costs if this one leaves
We have closed 3 fire protection searches in 2026 year to date, too few to publish a median for the trade, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 94 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
Worth knowing before the meeting rather than after it. The question a retention decision actually turns on is not whether a raise is deserved but what the seat costs empty for that long, and the calculator will put a figure on it for your billing rate.
Before you use it
Move the weightings to match how your business makes money, and move them before the review rather than after you have seen the scores. The split here is a starting point, not a judgement about your company.
Against every criterion, write the job, the date or the customer that evidences it. A criterion with nothing written beside it has not been met, however well the person is getting on, because you are about to make a decision and an impression is not evidence.
What follows from the result is yours. Pay, promotion and a development plan depend on your margins, your bands and your state, and nothing here sets them.
Questions employers ask about reviewing this role
How do you score an annual review for a Fire Alarm / Sprinkler Designer?
5 sections, weighted to 25%, 20%, 15%, 25%, 15% in that order, each rated 1 to 5 against written anchors. Multiply each section rating by its weight, add the five results and divide by 100; the worked example on this page does it in full. A 3.00 is the seat performed to the standard it was hired against.
What should a rating of 3 mean?
Meets the seat. It is the standard, not the consolation. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing and defends nothing if the decision is ever questioned.
How many criteria does this review cover?
24 across 5 sections, all of them things a manager can observe on a job rather than adjectives about a person. Each one has what good looks like written out beside it, which is the difference between a review somebody can prepare for and one they can only receive.
Should the review set pay?
Not by itself, and nothing here does. The instrument tells you how the work was performed against the seat. What follows - a raise, a promotion, a development plan or none of them - depends on your margins, your bands and your state. For reference, the band for this role is $75,000 to $120,000.
What do I do with a 2 in one section?
Name the job, the date or the customer that evidences it, say what meeting the seat would look like instead, and put a date on when you will look again. A 2 with no evidence beside it is an impression, and an impression is not something you can ask someone to improve. A 2 that sits inside an acceptable overall total is also the most common thing a single summary number hides, which is why the section scores go on the form.
Can I change the weightings?
Yes, and you should if they do not match how your business makes money. Change them before the review rather than after you have seen the scores, and change them for the seat rather than the person. The split here is a starting point.
What is the next step up from Fire Alarm / Sprinkler Designer?
Designers move to senior designer or design manager, and some move into engineering or plan review.
What does it cost if a Fire Alarm / Sprinkler Designer leaves?
We have closed 3 fire protection searches in 2026 year to date, too few to publish a median for the trade, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 94 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. That is the refill clock; the cost of the vacancy runs alongside it from the day the seat empties.
One time
Where should we send it?
Tell us who you are once and every document on this site downloads for you from then on, with no form in the way. We are a recruiting firm: someone may call about the roles you are hiring for.