Low-Voltage Electrician (Security Specialty) Performance Review Template
Physical Security
5 weighted sections, 26 criteria, on a scale with written anchors. The criteria are things a manager can observe on a job rather than adjectives about a person, which is the difference between a review somebody can prepare for and one they can only receive.
The scale
| Rating | What it means |
|---|---|
| 1 | Does not meet. Specific, repeated and known to the person. |
| 2 | Below the seat. Needs supervision the role is not supposed to need. |
| 3 | Meets the seat. This is the standard, not the consolation. |
| 4 | Above the seat. Others are learning from how they do it. |
| 5 | Rare. Changes how the company does the work. |
A 3 is the standard the seat was hired against, not a disappointment. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing.
How the weighted score works
Each section rating is multiplied by that section's weight; the five results are added and divided by 100. Worked through with this role's own weightings, for an illustrative Low-Voltage Electrician (Security Specialty) who is strong on the trade itself, standard on output and safety, and below the seat on communication:
| Section | Weight | Example rating | Weighted |
|---|---|---|---|
| A. Technical skill and execution | 30% | 4 | 1.20 |
| B. Productivity and measured results | 20% | 3 | 0.60 |
| C. Safety and compliance | 20% | 3 | 0.60 |
| D. Communication and customer handling | 15% | 2 | 0.30 |
| E. Reliability, teamwork and development | 15% | 3 | 0.45 |
| Overall | 100% | 3.15 |
3.15 on a scale where 3.00 is the seat performed to standard. The total is the least interesting number in that table. A 2 in one section can sit inside a total that reads as unremarkable, which is exactly why the section scores go on the form and the conversation happens section by section rather than about an average. The ratings above are an illustration, not a finding about anyone.
A. Technical skill and execution 30%
| Criterion | What good looks like |
|---|---|
| Cabling and pathway workmanship | Cable is supported, dressed and bundled with bend radius and tension intact, and no link on the technician jobs has failed certification for an installation cause this year |
| Terminations and device rough-in | Reader, lock and camera terminations match the manufacturer wiring diagram and the integrator picked up the technician work without rewiring it |
| Code and listing compliance | Plenum rating, firestopping, support spacing and separation from line voltage were correct on every inspected job, with no correction notice for limited-energy work |
| Power and PoE work | Supplies are sized and labeled, batteries dated, voltage verified at the device before energizing, and no device has been damaged by a wiring or polarity error |
| Testing and labeling discipline | Test results, label schedules and redlines were turned in with the job file on every project closed this year |
| Conduit and pathway fabrication | Bends, supports and raceway runs are plumb, reamed and sized so the next trade can pull through them without rework |
B. Productivity and measured results 20%
| Criterion | What good looks like |
|---|---|
| Production against estimated hours | Completed assigned scope within the budgeted field hours on the jobs named in this review period |
| Schedule reliability | Rough-in and trim milestones hit on the dates the schedule showed, or an early flag given when they would not be |
| Rework hours | Hours charged to correcting the technician own installed work stayed at or below the crew average |
| Material efficiency | Cable footage and device material used tracked to the takeoff, with unused stock returned and recorded |
| Independent work | Routinely finished a floor or area without the supervisor having to return to answer layout questions |
C. Safety and compliance 20%
| Criterion | What good looks like |
|---|---|
| Fall protection and lift use | Used the right ladder or lift for the task, harnessed in boom lifts, with no safety observation this year citing improvised access |
| Energized work and lockout | De-energized and verified before working in shared enclosures, and had no contact incident or tripped circuit caused by the technician work |
| PPE and housekeeping | Eye, hand, head and respiratory protection worn as the task requires, and areas left clean and tripping hazards removed at the end of each day |
| Incident and near-miss reporting | Reported every injury, near miss and property damage the same day it happened |
| License and training currency | Licenses, lift cards and OSHA training are current with no lapse, and renewals were submitted before expiration |
D. Communication and customer handling 15%
| Criterion | What good looks like |
|---|---|
| Daily reporting | Field reports say what was completed, what is open and what the technician is waiting on, specifically enough that the PM can act on them |
| Coordination with other trades | Raised ceiling, door hardware and power conflicts with the general contractor before they became a schedule hit, with examples from this period |
| Conduct on occupied sites | No client complaint about noise, access, badging, escort rules or cleanliness on occupied accounts this year |
| Handoff to the integration team | Delivered labeled, tested and documented infrastructure that the integrator could configure without a return trip for cabling issues |
| Answering the customer at the device | Explained to a facility contact what is being installed and when their door or camera returns to service, without overpromising dates |
E. Reliability, teamwork and development 15%
| Criterion | What good looks like |
|---|---|
| Attendance and start time | On site, tooled and working at the scheduled start, with absences called in per policy |
| Vehicle, tool and stock care | Vehicle inspected and clean, truck stock replenished, company tools accounted for and nothing lost or damaged through neglect |
| Direction of helpers and apprentices | Gave an apprentice real work with clear instruction and checked it, and the apprentice can now be left on tasks they could not do last year |
| Skill growth | Added a verifiable skill this year — fiber termination, a lift card, a BICSI credential or a manufacturer course — and used it on a job |
| Willingness on off-hours work | Took assigned night, weekend and shutdown work without rescheduling the crew around it |
What this seat is measured on day to day
| Measure | What it captures |
|---|---|
| First-pass certification rate | Share of permanent links that pass certification testing without retermination |
| Rough-in ready for trim on schedule | Device locations roughed in, powered and ready for trim by the date on the schedule |
| Punch items returned by the integrator or inspector | Count of items sent back per job after the technician called an area complete |
| Labeling and as-built accuracy | Field labels and submitted redlines match what the record drawings and the integrator find |
| Material and reel accountability | Cable footage, device counts and returned stock reconciled against the estimate |
| Daily paperwork on time | Field reports and timesheets submitted by the cutoff every working day |
| Limited-energy inspection results | Rough-in and final inspections passed without correction notices |
The same measures the job description for this role is written against, so the document you hire against and the document you rate against are measuring one thing.
Where this person goes next
Low-voltage electricians move to lead, foreman, or across into systems technician and integration work.
The review is the natural place for this conversation and the wrong place to have it for the first time. Someone hearing about the next seat in the same meeting as their rating hears it as consolation. Say it in advance, then use the review to say how far along they are.
The pay conversation
Federal figures: BLS Occupational Employment and Wage Statistics, May 2025, national, SOC 47-2111. The range is the 10th to 90th percentile and the median is $63,190. It is not adjusted for experience or region, and it is not a My Trade Talent band.
A review that produces a number and no pay decision is a review the employee will discount next year. One that produces a pay decision made in the same half hour is usually a decision made on the last thing discussed. Know where the person sits in the band before the meeting, and treat the rating as evidence for a decision you take afterwards.
Nothing here sets pay. What a rating is worth depends on your margins, your bands and your state, and those are yours.
What it costs if this one leaves
We publish no physical security median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
Worth knowing before the meeting rather than after it. The question a retention decision actually turns on is not whether a raise is deserved but what the seat costs empty for that long, and the calculator will put a figure on it for your billing rate.
Before you use it
Move the weightings to match how your business makes money, and move them before the review rather than after you have seen the scores. The split here is a starting point, not a judgement about your company.
Against every criterion, write the job, the date or the customer that evidences it. A criterion with nothing written beside it has not been met, however well the person is getting on, because you are about to make a decision and an impression is not evidence.
What follows from the result is yours. Pay, promotion and a development plan depend on your margins, your bands and your state, and nothing here sets them.
Questions employers ask about reviewing this role
How do you score an annual review for a Low-Voltage Electrician (Security Specialty)?
5 sections, weighted to 30%, 20%, 20%, 15%, 15% in that order, each rated 1 to 5 against written anchors. Multiply each section rating by its weight, add the five results and divide by 100; the worked example on this page does it in full. A 3.00 is the seat performed to the standard it was hired against.
What should a rating of 3 mean?
Meets the seat. It is the standard, not the consolation. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing and defends nothing if the decision is ever questioned.
How many criteria does this review cover?
26 across 5 sections, all of them things a manager can observe on a job rather than adjectives about a person. Each one has what good looks like written out beside it, which is the difference between a review somebody can prepare for and one they can only receive.
Should the review set pay?
Not by itself, and nothing here does. The instrument tells you how the work was performed against the seat. What follows - a raise, a promotion, a development plan or none of them - depends on your margins, your bands and your state. For reference, the band for this role is $42,640 to $108,510.
What do I do with a 2 in one section?
Name the job, the date or the customer that evidences it, say what meeting the seat would look like instead, and put a date on when you will look again. A 2 with no evidence beside it is an impression, and an impression is not something you can ask someone to improve. A 2 that sits inside an acceptable overall total is also the most common thing a single summary number hides, which is why the section scores go on the form.
Can I change the weightings?
Yes, and you should if they do not match how your business makes money. Change them before the review rather than after you have seen the scores, and change them for the seat rather than the person. The split here is a starting point.
What is the next step up from Low-Voltage Electrician (Security Specialty)?
Low-voltage electricians move to lead, foreman, or across into systems technician and integration work.
What does it cost if a Low-Voltage Electrician (Security Specialty) leaves?
We publish no physical security median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. That is the refill clock; the cost of the vacancy runs alongside it from the day the seat empties.
One time
Where should we send it?
Tell us who you are once and every document on this site downloads for you from then on, with no form in the way. We are a recruiting firm: someone may call about the roles you are hiring for.