Master Plumber Performance Review Template
Commercial Plumbing
5 weighted sections, 25 criteria, on a scale with written anchors. The criteria are things a manager can observe on a job rather than adjectives about a person, which is the difference between a review somebody can prepare for and one they can only receive.
The scale
| Rating | What it means |
|---|---|
| 1 | Does not meet. Specific, repeated and known to the person. |
| 2 | Below the seat. Needs supervision the role is not supposed to need. |
| 3 | Meets the seat. This is the standard, not the consolation. |
| 4 | Above the seat. Others are learning from how they do it. |
| 5 | Rare. Changes how the company does the work. |
A 3 is the standard the seat was hired against, not a disappointment. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing.
How the weighted score works
Each section rating is multiplied by that section's weight; the five results are added and divided by 100. Worked through with this role's own weightings, for an illustrative Master Plumber who is strong on the trade itself, standard on output and safety, and below the seat on communication:
| Section | Weight | Example rating | Weighted |
|---|---|---|---|
| A. Technical skill and execution | 30% | 4 | 1.20 |
| B. Productivity and measured results | 20% | 3 | 0.60 |
| C. Safety and compliance | 20% | 3 | 0.60 |
| D. Communication and customer handling | 15% | 2 | 0.30 |
| E. Reliability, teamwork and development | 15% | 3 | 0.45 |
| Overall | 100% | 3.15 |
3.15 on a scale where 3.00 is the seat performed to standard. The total is the least interesting number in that table. A 2 in one section can sit inside a total that reads as unremarkable, which is exactly why the section scores go on the form and the conversation happens section by section rather than about an average. The ratings above are an illustration, not a finding about anyone.
A. Technical skill and execution 30%
| Criterion | What good looks like |
|---|---|
| Code authority | Interpretations issued this period held up with the authority having jurisdiction, with each written decision traceable to a cited code section. |
| Sizing accuracy | Water service, drainage, vent, storm and gas sizing decisions reviewed by the engineer of record or an inspector required no material correction. |
| Plan and submittal review | Review comments were issued before buyout on each project and caught the sizing and routing problems that would otherwise have surfaced in the field. |
| Material and method standards | Published and maintained approved material and joining standards by jurisdiction, and field installations follow them. |
| Correction of noncompliance | Every noncompliant or failed installation found this period was documented, corrected by a named date, and followed by a change in training or standard. |
B. Productivity and measured results 20%
| Criterion | What good looks like |
|---|---|
| Inspection pass rate | Company-wide first-time inspection pass rate met or exceeded the target for the period. |
| Permit turnaround | Permits were filed within the committed days of drawing release, and no job start was delayed by a permit the master plumber controlled. |
| Test failure reduction | Failed pressure, gas and medical gas verification tests declined against the prior period, measured per system tested. |
| Review throughput | Completed plan, submittal and substitution reviews within the turnaround times project schedules required. |
| Estimating and technical support | Delivered the estimates and technical reviews assigned during the period on the dates committed. |
C. Safety and compliance 20%
| Criterion | What good looks like |
|---|---|
| License standing | Company license and all required jurisdictional registrations stayed active with no lapse, and continuing education was completed before deadline. |
| Cross-connection and medical gas compliance | Backflow device test records and medical gas installer and verification records were complete and current on every applicable project. |
| Supervision ratios | Apprentice-to-journeyman ratios and license verification met jurisdictional requirements on every active job, documented by records review. |
| Trench, confined space and hot work programs | Audits of excavation, confined space entry and hot work practice found procedures in use, with corrective action documented where they were not. |
| Training delivery | Delivered scheduled code, testing and joining-method training with documented attendance and a competency check. |
D. Communication and customer handling 15%
| Criterion | What good looks like |
|---|---|
| Inspector and jurisdiction relationships | Inspectors and health department staff engage directly and constructively; no inspection was lost or delayed over an avoidable dispute. |
| Written technical communication | Code decisions, review comments and correction directions were issued in writing with specific sections, locations and dates. |
| Engineer and owner interaction | Design conflicts were raised with the engineer of record in a documented request for information and resolved without stalling the field. |
| Internal clarity | Foremen and project managers can state the company standard on recurring issues without calling the master plumber each time. |
| Field coaching tone | Corrections in the field were delivered so the crew changed the practice, evidenced by the issue not recurring on later jobs. |
E. Reliability, teamwork and development 15%
| Criterion | What good looks like |
|---|---|
| Availability | Responded to inspection, test and failure escalations within the response time the company commits to, including off hours. |
| Workforce development | Journeymen and apprentices advanced measurably, with named individuals who passed exams or earned medical gas or backflow certification this period. |
| Cross-role support | Backed up estimating or project management when the shop needed it without letting code and permit duties slip. |
| Record keeping | Permit, inspection, test, license and training records are complete and retrievable at audit without reconstruction. |
| Own development | Completed training on the new code cycle or a new system type during the year and brought it back into company standards. |
What this seat is measured on day to day
| Measure | What it captures |
|---|---|
| First-time inspection pass rate | Percentage of underground, rough and final plumbing and gas inspections company-wide that pass without correction notices |
| Open correction notices | Number and age of unresolved inspector corrections across active permits |
| Permit cycle time | Days from drawing release to issued permit on projects the master plumber files |
| Test and leak failure rate | Failed pressure, air, gas and medical gas verification tests, and leak callbacks company-wide |
| Plan review findings closed before buyout | Code and sizing issues identified and resolved in preconstruction rather than during installation |
| Code-related rework cost | Labor and material cost of installations rebuilt because they did not comply with code or the approved submittal |
| License and certification compliance | Percentage of field personnel with current licenses, medical gas and backflow certifications, and zero lapses in the company license |
The same measures the job description for this role is written against, so the document you hire against and the document you rate against are measuring one thing.
Where this person goes next
Masters move into operations, estimating or ownership; the licence is what makes the last of those possible.
The review is the natural place for this conversation and the wrong place to have it for the first time. Someone hearing about the next seat in the same meeting as their rating hears it as consolation. Say it in advance, then use the review to say how far along they are.
The pay conversation
My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.
A review that produces a number and no pay decision is a review the employee will discount next year. One that produces a pay decision made in the same half hour is usually a decision made on the last thing discussed. Know where the person sits in the band before the meeting, and treat the rating as evidence for a decision you take afterwards.
Nothing here sets pay. What a rating is worth depends on your margins, your bands and your state, and those are yours.
What it costs if this one leaves
We have closed 4 commercial plumbing searches in 2026 year to date, too few to publish a median for the trade, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
Worth knowing before the meeting rather than after it. The question a retention decision actually turns on is not whether a raise is deserved but what the seat costs empty for that long, and the calculator will put a figure on it for your billing rate.
Before you use it
Move the weightings to match how your business makes money, and move them before the review rather than after you have seen the scores. The split here is a starting point, not a judgement about your company.
Against every criterion, write the job, the date or the customer that evidences it. A criterion with nothing written beside it has not been met, however well the person is getting on, because you are about to make a decision and an impression is not evidence.
What follows from the result is yours. Pay, promotion and a development plan depend on your margins, your bands and your state, and nothing here sets them.
Questions employers ask about reviewing this role
How do you score an annual review for a Master Plumber?
5 sections, weighted to 30%, 20%, 20%, 15%, 15% in that order, each rated 1 to 5 against written anchors. Multiply each section rating by its weight, add the five results and divide by 100; the worked example on this page does it in full. A 3.00 is the seat performed to the standard it was hired against.
What should a rating of 3 mean?
Meets the seat. It is the standard, not the consolation. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing and defends nothing if the decision is ever questioned.
How many criteria does this review cover?
25 across 5 sections, all of them things a manager can observe on a job rather than adjectives about a person. Each one has what good looks like written out beside it, which is the difference between a review somebody can prepare for and one they can only receive.
Should the review set pay?
Not by itself, and nothing here does. The instrument tells you how the work was performed against the seat. What follows - a raise, a promotion, a development plan or none of them - depends on your margins, your bands and your state. For reference, the band for this role is $75,000 to $115,000.
What do I do with a 2 in one section?
Name the job, the date or the customer that evidences it, say what meeting the seat would look like instead, and put a date on when you will look again. A 2 with no evidence beside it is an impression, and an impression is not something you can ask someone to improve. A 2 that sits inside an acceptable overall total is also the most common thing a single summary number hides, which is why the section scores go on the form.
Can I change the weightings?
Yes, and you should if they do not match how your business makes money. Change them before the review rather than after you have seen the scores, and change them for the seat rather than the person. The split here is a starting point.
What is the next step up from Master Plumber?
Masters move into operations, estimating or ownership; the licence is what makes the last of those possible.
What does it cost if a Master Plumber leaves?
We have closed 4 commercial plumbing searches in 2026 year to date, too few to publish a median for the trade, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. That is the refill clock; the cost of the vacancy runs alongside it from the day the seat empties.
One time
Where should we send it?
Tell us who you are once and every document on this site downloads for you from then on, with no form in the way. We are a recruiting firm: someone may call about the roles you are hiring for.