Solar Photovoltaic Installer Performance Review Template
LED & Solar
5 weighted sections, 26 criteria, on a scale with written anchors. The criteria are things a manager can observe on a job rather than adjectives about a person, which is the difference between a review somebody can prepare for and one they can only receive.
The scale
| Rating | What it means |
|---|---|
| 1 | Does not meet. Specific, repeated and known to the person. |
| 2 | Below the seat. Needs supervision the role is not supposed to need. |
| 3 | Meets the seat. This is the standard, not the consolation. |
| 4 | Above the seat. Others are learning from how they do it. |
| 5 | Rare. Changes how the company does the work. |
A 3 is the standard the seat was hired against, not a disappointment. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing.
How the weighted score works
Each section rating is multiplied by that section's weight; the five results are added and divided by 100. Worked through with this role's own weightings, for an illustrative Solar Photovoltaic Installer who is strong on the trade itself, standard on output and safety, and below the seat on communication:
| Section | Weight | Example rating | Weighted |
|---|---|---|---|
| A. Technical skill and execution | 30% | 4 | 1.20 |
| B. Productivity and measured results | 20% | 3 | 0.60 |
| C. Safety and compliance | 20% | 3 | 0.60 |
| D. Communication and customer handling | 15% | 2 | 0.30 |
| E. Reliability, teamwork and development | 15% | 3 | 0.45 |
| Overall | 100% | 3.15 |
3.15 on a scale where 3.00 is the seat performed to standard. The total is the least interesting number in that table. A 2 in one section can sit inside a total that reads as unremarkable, which is exactly why the section scores go on the form and the conversation happens section by section rather than about an average. The ratings above are an illustration, not a finding about anyone.
A. Technical skill and execution 30%
| Criterion | What good looks like |
|---|---|
| Layout accuracy | Array lands within tolerance of the plan set on the first layout; no row relocated after modules are set. |
| Attachment and flashing quality | Every penetration flashed to the membrane detail; no leak or roofer rejection traced to this installer's attachments during the year. |
| Torque and mechanical discipline | Passes torque audits at the required sample rate with no retorque campaign caused by this installer's work. |
| DC wiring and terminations | Strings dressed and supported off the roof with matched connectors crimped using the right tool; no connector failure found at commissioning. |
| Equipment setting and labeling | Inverters, rapid shutdown devices and the full label package installed per manual before inspection, with no correction notice from the inspector. |
| Pre-energization testing | Records voltage, polarity, insulation resistance and bonding continuity for every string and raises discrepancies before energizing. |
B. Productivity and measured results 20%
| Criterion | What good looks like |
|---|---|
| Install rate | Meets or beats the planned module per day rate for the racking system in use, measured by project. |
| Punch list size | Sections turn over with a short punch list, closed before demobilization rather than on a return trip. |
| Schedule milestones | Hits mechanical completion and inspection ready dates on assigned sections without unplanned overtime. |
| Material use | Installs from the staged bill of material without shortages or reorders caused by miscounted layout. |
| Return trips | No second mobilization caused by work this installer completed incorrectly the first time. |
C. Safety and compliance 20%
| Criterion | What good looks like |
|---|---|
| Fall protection | Tied off or inside a compliant warning line whenever in the fall hazard zone; zero observed exceptions on site audits. |
| Skylight and opening protection | Covers or guards skylights and roof openings in the work area before work starts, verified at the morning walk. |
| Daily equipment inspection | Harnesses, lanyards, ladders and lifts inspected and logged daily, with damaged gear tagged out the same day. |
| Heat illness prevention | Takes and enforces water, rest and shade cycles; no heat related incident on the crew. |
| Housekeeping and dropped objects | Roof and ground clear at the end of each shift; no dropped object incident and no debris found in roof drains. |
D. Communication and customer handling 15%
| Criterion | What good looks like |
|---|---|
| Field condition reporting | Reports damaged deck, missing structure or differing conditions the same day with photographs, before the crew works around it. |
| Coordination with the roofer and general contractor | Confirms flashing details and roof access before penetrating; no dispute escalated to the owner. |
| Occupied building conduct | Keeps noise, access and parking inside the agreed hours and routes; no tenant complaint on file. |
| Crew briefings | Delivers or contributes to the morning task briefing so everyone on the roof knows the plan and the hazards. |
| Documentation | Daily log and photo record complete enough to answer a billing or warranty question six months later. |
E. Reliability, teamwork and development 15%
| Criterion | What good looks like |
|---|---|
| Attendance and start time | On the roof and working at start time; absences do not cost the crew a scheduled crane or lift day. |
| Tool and vehicle accountability | Company tools returned and inventoried; truck and trailer serviceable and loaded for the next day. |
| Training a helper | Can take an apprentice through attachment, racking and module setting and give an honest readiness assessment. |
| Skill growth | Adds a verifiable capability during the year such as lift certification, a new racking system or commissioning support. |
| Flexibility | Takes travel, shifted hours or another crew's section when the schedule requires it without the quality dropping. |
What this seat is measured on day to day
| Measure | What it captures |
|---|---|
| Modules or kilowatts set per crew day | Install rate against the estimate for the racking type and roof condition |
| Torque and attachment audit pass rate | Share of sampled fasteners and flashings that pass QA on the first check |
| Roof leak and penetration callbacks | Any leak traced to an attachment this installer made, which is the costliest failure on the job |
| Punch list and return trips | Items the crew has to come back for after the array is called complete |
| First energization results | Strings that come online at expected voltage and production without troubleshooting |
| Recordable incidents and near misses | Injuries, dropped objects and fall protection exceptions in this installer's work area |
The same measures the job description for this role is written against, so the document you hire against and the document you rate against are measuring one thing.
Where this person goes next
Installers move to lead and foreman, and the electrical side of the work opens licensure paths.
The review is the natural place for this conversation and the wrong place to have it for the first time. Someone hearing about the next seat in the same meeting as their rating hears it as consolation. Say it in advance, then use the review to say how far along they are.
The pay conversation
Federal figures: BLS Occupational Employment and Wage Statistics, May 2025, national, SOC 47-2231. The range is the 10th to 90th percentile and the median is $53,140. It is not adjusted for experience or region, and it is not a My Trade Talent band.
A review that produces a number and no pay decision is a review the employee will discount next year. One that produces a pay decision made in the same half hour is usually a decision made on the last thing discussed. Know where the person sits in the band before the meeting, and treat the rating as evidence for a decision you take afterwards.
Nothing here sets pay. What a rating is worth depends on your margins, your bands and your state, and those are yours.
What it costs if this one leaves
We publish no LED & solar median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 94 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
Worth knowing before the meeting rather than after it. The question a retention decision actually turns on is not whether a raise is deserved but what the seat costs empty for that long, and the calculator will put a figure on it for your billing rate.
Before you use it
Move the weightings to match how your business makes money, and move them before the review rather than after you have seen the scores. The split here is a starting point, not a judgement about your company.
Against every criterion, write the job, the date or the customer that evidences it. A criterion with nothing written beside it has not been met, however well the person is getting on, because you are about to make a decision and an impression is not evidence.
What follows from the result is yours. Pay, promotion and a development plan depend on your margins, your bands and your state, and nothing here sets them.
Questions employers ask about reviewing this role
How do you score an annual review for a Solar Photovoltaic Installer?
5 sections, weighted to 30%, 20%, 20%, 15%, 15% in that order, each rated 1 to 5 against written anchors. Multiply each section rating by its weight, add the five results and divide by 100; the worked example on this page does it in full. A 3.00 is the seat performed to the standard it was hired against.
What should a rating of 3 mean?
Meets the seat. It is the standard, not the consolation. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing and defends nothing if the decision is ever questioned.
How many criteria does this review cover?
26 across 5 sections, all of them things a manager can observe on a job rather than adjectives about a person. Each one has what good looks like written out beside it, which is the difference between a review somebody can prepare for and one they can only receive.
Should the review set pay?
Not by itself, and nothing here does. The instrument tells you how the work was performed against the seat. What follows - a raise, a promotion, a development plan or none of them - depends on your margins, your bands and your state. For reference, the band for this role is $41,600 to $79,970.
What do I do with a 2 in one section?
Name the job, the date or the customer that evidences it, say what meeting the seat would look like instead, and put a date on when you will look again. A 2 with no evidence beside it is an impression, and an impression is not something you can ask someone to improve. A 2 that sits inside an acceptable overall total is also the most common thing a single summary number hides, which is why the section scores go on the form.
Can I change the weightings?
Yes, and you should if they do not match how your business makes money. Change them before the review rather than after you have seen the scores, and change them for the seat rather than the person. The split here is a starting point.
What is the next step up from Solar Photovoltaic Installer?
Installers move to lead and foreman, and the electrical side of the work opens licensure paths.
What does it cost if a Solar Photovoltaic Installer leaves?
We publish no LED & solar median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 94 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. That is the refill clock; the cost of the vacancy runs alongside it from the day the seat empties.
One time
Where should we send it?
Tell us who you are once and every document on this site downloads for you from then on, with no form in the way. We are a recruiting firm: someone may call about the roles you are hiring for.