Skip to main content
Job description

Construction Project Manager Job Description

Commercial Construction

Owns a commercial construction project commercially: buyout, subcontracts, submittals, budget, change orders, billing and the owner and architect relationships. The project manager converts the estimate into bought work, protects the margin through the build, keeps the money moving and keeps the owner informed. The job is shared with the superintendent, who owns the field — the project manager owns the contract, the cost and the paper that proves both.

15essential duties
8 / 7required / preferred qualifications
5credentials, each with who verifies it
Take this away as a Word document The same description, formatted for a personnel file, with an acknowledgement signature block at the end. The first download asks for your name, company, work email and phone; after that every document here downloads without a form.
Download .docx

What this seat pays

$95,000 to $160,000 My Trade Talent band

My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.

Pay, location and the date prepared are blank in the Word version on purpose. They depend on your market and your margins, and a template that guesses at them is worse than one that leaves them to you. The figure above is here so the guess is at least anchored.

The seat

Reports toProject Executive
Direct reportsProject engineer and assistant project manager; manages subcontractors and vendors
FLSA statusTypically exempt — confirm with counsel
TradeCommercial Construction
Pay band$95,000 to $160,000 — My Trade Talent band

Where the role goes next. Project managers move to senior PM, project executive, or into preconstruction.

Essential duties (15)

  • Run buyout: convert the estimate into a buy log by trade, solicit and level subcontractor and vendor proposals, and award scopes against the budget.
  • Write subcontracts and purchase orders with scope, schedule, insurance and safety requirements attached, and no gap between one trade's scope and the next.
  • Set up and maintain the project budget by cost code in the accounting system, and reconcile commitments, cost to date and cost to complete every month.
  • Produce the monthly projection and margin report with a written explanation of every variance, and raise erosion in the month it appears.
  • Manage the submittal and shop drawing log, push the architect for turnaround, and release long-lead items — switchgear, elevators, curtain wall, mechanical equipment — against the schedule.
  • Write and track RFIs, tie the answers to the dates the field needs them, and escalate when an answer is late enough to affect the schedule.
  • Price, submit and negotiate owner change orders, and issue the matching subcontract change orders so the field is not performing unbought work.
  • Prepare monthly pay applications, schedules of values, lien waivers, certified payroll and the supporting documentation, and manage the project's receivables.
  • Review and approve subcontractor pay applications against work actually in place as verified by the superintendent.
  • Run or attend the owner-architect-contractor meeting, publish the minutes, and drive the open items list to closure.
  • Maintain the project schedule with the superintendent, update it monthly for the owner, and document delays, impacts and time extension requests as they occur.
  • Manage project insurance, bonds, permits, allowances, owner-furnished items and contract notice requirements, including the deadlines a notice provision carries.
  • Manage closeout: as-builts, operation and maintenance manuals, warranties, attic stock, owner training, the certificate of occupancy and final lien releases, and collect retention.
  • Keep the project record current in the project management system — correspondence, minutes, logs, daily reports and photographs — so the file would survive a claim or an audit.
  • Manage warranty obligations in the first year, coordinate the responsible subcontractors, and decide what the company absorbs versus pursues.

Qualifications

Required
  • Five or more years managing commercial construction projects, or project engineering experience plus time running smaller projects.
  • Able to read a full construction document set and a specification and administer a contract from it, including the notice and claim provisions.
  • Able to build and defend a project budget by cost code and produce a monthly projection that ties to accounting.
  • Experience with construction project management and accounting software such as Procore, Autodesk Build, Viewpoint, Sage or CMiC.
  • Experience writing and negotiating subcontracts and owner change orders.
  • Able to run an owner and architect meeting and leave with a written record of decisions.
  • Valid driver's license and the ability to walk active construction sites in full PPE.
  • OSHA 10 at hire, with OSHA 30 obtained in the first year.
Preferred
  • Bachelor's degree in construction management, civil engineering or architecture, or equivalent field experience.
  • Experience on the company's project type — healthcare, higher education, K-12, industrial, multifamily or tenant improvement.
  • Experience with public work: bid documents, prevailing wage, certified payroll and agency closeout.
  • Experience administering a guaranteed maximum price or cost-plus contract with open books and an owner audit.
  • OSHA 30 construction already held at hire.
  • LEED AP, DBIA or CCM credential.
  • Scheduling depth in Primavera P6 or Microsoft Project sufficient to review a subcontractor's claimed delay.

The line between these two columns is the one that costs you candidates. Everything in the preferred column that gets written into a posting as a requirement removes people who could do the job, and in a trade with a shortage that is a self-inflicted wound.

Credentials, and who verifies them

CredentialStatusVerify with
OSHA 30 constructionPreferredTraining provider card and DOL card number
State contractor license or qualifying individual statusWhere the state requires itState licensing board lookup
Credential such as LEED AP, DBIA or CCMPreferredIssuing body certification registry
First Aid and CPRPreferredTraining provider card, refreshed every two years
Valid driver's licenseRequiredMotor vehicle record run through the company insurer

Verify before an offer rather than after. A credential taken on trust at offer is the most expensive line on this page. We track commercial construction licensing in 38 states; which of them applies depends on where the work is, not where the company is.

Physical demands

ActivityFrequency
Sitting at a desk or in a job trailer working contracts, budgets and emailConstant (over 2/3 of shift)
Reading drawings, specifications and contracts on screen and in printConstant (over 2/3 of shift)
Speaking by phone and in meetings with owners, architects and subcontractorsFrequent (1/3 to 2/3 of shift)
Walking the jobsite, including stairs and unfinished floorsOccasional (under 1/3 of shift)
Standing in owner, preconstruction and punch walk meetingsOccasional (under 1/3 of shift)
Driving between the office, the jobsite, the owner and the architectOccasional (under 1/3 of shift)
Climbing ladders and stairs to inspect work with the superintendentOccasional (under 1/3 of shift)
Exposure to outdoor weather, dust and construction noise during site walksOccasional (under 1/3 of shift)
Lifting and carrying up to 25 pounds of drawings, samples and filesOccasional (under 1/3 of shift)
Extended hours during bid, buyout, the billing cycle and closeoutOccasional (under 1/3 of shift)
Working at heights, on roofs or from liftsRarely
Hands-on tool work or material handlingRarely

This is the section a reasonable accommodation decision actually turns on, which is why it is role specific rather than copied across a trade. An estimator sits and walks sites; a screed operator stands beside hot asphalt all day.

Work environment

Mostly an office or job trailer: two monitors, a plan table, a phone and a billing deadline. Site walks put the project manager in an active building with dust, noise, weather, open penetrations and overhead work, where full PPE is required. Owner and architect meetings happen off site. Hours stretch around buyout, the monthly billing cycle and closeout, and public work adds agency meetings and documentation deadlines.

Tools and equipment

The company provides a laptop, dual monitors, phone, vehicle or allowance, plan printing and plotting, project management, scheduling and accounting software licenses, and site PPE including hard hat, glasses, vest and gloves. The project manager is expected to own steel toe boots and clothing suitable for both an owner meeting and a jobsite walk.

How performance is measured

MeasureWhat it captures
Project gross margin at completion against margin at buyoutWhether the job finished where it was bought, and where it moved
Buyout savings or overrun against the estimateWhat was captured or given up when the scopes were awarded
Change order cycle time and approval rateHow much directed work gets performed before it is priced and signed
Billing timeliness and project days sales outstandingPay applications submitted on the owner's cutoff and paid without dispute
Submittal and RFI turnaround and agingWhether the paperwork is ahead of the field or behind it
Closeout completion and retention release timingHow long after substantial completion the file and the money actually close
Owner and architect feedback and repeat workWhether this owner would hire the company again and said so

These are the same measures the annual review for this role is built on, so the document you hire against and the document you rate against are measuring one thing.

Reading a resume for this seat

What separates a strong Construction Project Manager from a plausible one, on paper and in the first ten minutes of a call:

  • Describes the PM-superintendent split clearly, and respects it
  • Change-order and documentation discipline described without prompting
  • Can state budget performance and what moved it

Screen for it: 3 questions and what a strong answer contains

A job description tells you what you need. These tell you whether the person in front of you has it. Each one comes with what a strong answer contains, because an interviewer who does not know that is persuaded by fluency, which is exactly what the question was supposed to see past.

How do you and your superintendent divide the job?

What a strong answer contains

Draws a clear line and then says where it blurs. The superintendent owns the field: sequence, manpower, safety, quality, what happens today. The project manager owns the contract, the money, the subs' agreements, submittals, changes and the owner relationship. Both own the schedule, and they agree how it gets updated and by whom. Says they talk daily and never contradict each other in front of a sub. The answer to listen for is who wins a disagreement and how.

Follow up with: Tell me about a disagreement with a superintendent. How did it get settled?

The architect is slow on RFIs and the schedule is suffering. What do you do?

What a strong answer contains

Shows the record rather than complaining: an RFI log with dates asked, dates needed and dates answered, and what each open item is holding. Writes the RFI with a proposed solution so the answer can be a yes rather than a design exercise. Escalates in a scheduled way - a log in the owner meeting, then a letter citing the contractual response period - and prices the impact as it accrues rather than presenting a surprise at the end. Resequences in the meantime.

Follow up with: What does your contract say about response time, and have you ever invoked it?

Walk me through how you build and defend a change order.

What a strong answer contains

Starts from the contract documents and shows what was and was not included, rather than arguing fairness. Prices labour, material, equipment, subcontract and time separately, with the schedule impact stated even when it is zero, and backs it with the field record: daily reports, photographs, the RFI or directive that caused it. Gives notice within the contractual window, which is where most entitlement is lost. Expects to negotiate and knows which lines they will hold.

Follow up with: Which line in a change order do you always get pushed on, and how do you hold it?

The mistake this seat invites

Hiring on project value rather than number of cycles. Buyouts and closeouts are where the skill lives, and they are counted per job.

How long this takes to fill

My Trade Talent's median commercial construction hire took 14 days across 13 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.

Worth writing on the requisition before you post it. The cost of the vacancy runs from the day the seat empties, not from the day you start looking, and the calculator will put a number on it for your billing rate.

Questions employers ask about this role

What does a Construction Project Manager do?

Owns a commercial construction project commercially: buyout, subcontracts, submittals, budget, change orders, billing and the owner and architect relationships. The project manager converts the estimate into bought work, protects the margin through the build, keeps the money moving and keeps the owner informed. The job is shared with the superintendent, who owns the field — the project manager owns the contract, the cost and the paper that proves both. The full description below lists 15 essential duties in trade terms, with physical demands and frequencies.

What qualifications does a Construction Project Manager need?

8 requirements are written as non-negotiable for this seat. The first 3: Five or more years managing commercial construction projects, or project engineering experience plus time running smaller projects; Able to read a full construction document set and a specification and administer a contract from it, including the notice and claim provisions; Able to build and defend a project budget by cost code and produce a monthly projection that ties to accounting. A further 7 qualifications are preferred rather than required, which is the distinction that decides whether a good candidate gets screened out by your own posting.

What credentials should I verify before making an offer to a Construction Project Manager?

2 credentials on this role are either required outright or required where the state requires it: State contractor license or qualifying individual status and Valid driver's license. Each one has a named place to verify it in the table below. Verify before the offer rather than after; a credential taken on trust at offer is the most expensive line in a job description.

Is a Construction Project Manager exempt or non-exempt?

Typically exempt — confirm with counsel. FLSA status turns on the duties actually performed rather than the job title, and the duties for this seat are listed below so a classification decision has something to rest on. We are not lawyers and the note here is a starting point for counsel, not a determination.

What should a Construction Project Manager be paid?

$95,000 to $160,000. My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.

How long does it take to hire a Construction Project Manager?

My Trade Talent's median commercial construction hire took 14 days across 13 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.

What is the most common hiring mistake in this seat?

Hiring on project value rather than number of cycles. Buyouts and closeouts are where the skill lives, and they are counted per job.

Trade Talk A monthly hiring brief for commercial trades employers

What changed in your trade this month, and what to do about it.

One email a month, and only one. We write a separate issue for every trade we recruit in, so you get yours - not a round-up with your trade buried in paragraph nine. Every issue is written for the person actually doing the hiring.

  • Where wages moved in your trade, by market, and what that does to your next offer
  • How long roles like yours are taking to fill, and where it is getting worse
  • Interview and screening tactics that are landing candidates this month
  • What contractors competing for the same people are doing differently

Built on federal wage data, our own closed searches, and what we hear on the desk every week. Written for employers, not candidates. No pitch, no filler, one click to leave.

Pick your trade. That is the one issue you get, once a month.

One email a month. Your trade and your address, nothing else - we do not sell either, and you can unsubscribe from the bottom of any issue. Read this month's issue for your trade first →