Skip to main content
HVAC & Mechanical →

What Happens When a Commercial Trades Position Stays Open for 90 Days?

A 90-day vacancy isn't three months of saved payroll. The cost moves into overtime, subcontracting, missed service calls, slower estimates, delayed projects, manager workload and customer risk.

Short answer: A 90-day vacancy is not just three months of saved payroll. In the commercial trades, the open seat can move cost into overtime, subcontracting, missed service calls, slower estimates, delayed projects, manager workload, customer risk and lost revenue. The right cost-of-vacancy calculation is role-specific: ask what work cannot happen, who absorbs it and what that constraint is worth each week.

Key takeaways

  • Unpaid salary isn't savings. The work the seat was supposed to do still has a cost, whether it gets done late, at overtime rates or not at all.
  • Start with lost output. Billable service hours, estimates, projects supervised, crews led, accounts or inspections: whatever that person would have owned.
  • Count who absorbs the work. Overtime, premium subcontract labor, callbacks and your best people covering two jobs.
  • Count the management time. Owners, GMs, operations and HR all lose hours to an open seat.
  • Then compare. Once the weekly cost is visible, weigh it against recruiting help, a pay adjustment or a faster interview process.

How to read this report

There's no federal statistic for what an open trades seat costs, and we don't use a universal multiplier. This report is recruiting analysis: five places a 90-day vacancy shows up in a commercial trades business, meant to be filled in with your own production, payroll and customer numbers. My Trade Talent's published track record only comes in where it's named.

1. Lost productive capacity

Start with the output the missing person would have owned: billable service hours, estimates, projects supervised, crews led, accounts managed or inspections completed. Avoid a fake universal multiplier; use your own production economics.

That output looks different by seat. For a commercial HVAC service tech, it's calls that don't get run. For a commercial roofing estimator, it's bids that don't go out. For a commercial construction superintendent, it's a job running without its field leader. Ninety days is about 13 weeks, so whatever that weekly number is, it repeats about 13 times.

2. Overtime and overload

If the work still has to happen, somebody else absorbs it. Measure it directly:

  • Overtime: Hours your existing crew is logging to cover the gap.
  • Premium subcontract labor: Work you'd normally self-perform, bought at a markup.
  • Travel and callbacks: Extra trips and return visits when coverage is thin.
  • Lost productivity: What your best people stop doing when they cover two jobs.

The last one is the easiest to miss. The people covering an open seat for a full quarter are the ones doing the most extra work, and the overload doesn't stay on the payroll report.

3. Management drag

Open seats consume owner, GM, operations and HR time. Track the hours spent screening, rescheduling, covering customer escalations and reworking the hiring process. Over 90 days, that's a quarter of leadership attention going to a problem instead of the business. If the process itself keeps restarting, it's worth a look at how to optimize your recruitment process.

4. Customer and schedule risk

Some vacancy costs are probabilistic but real:

  • Slower response on service calls
  • Missed deadlines and project stacking
  • Fewer bids submitted
  • Delayed closeout
  • A customer who stops trusting the team

None of these show up as a line item in the first month. By month three, they're the ones most likely to follow you into next year's work.

5. The recruiting decision

Once the weekly vacancy cost is visible, you can compare it with the cost of recruiting help, a compensation adjustment or a faster interview process. That's a better decision than treating recruiting spend as an isolated expense.

It also changes which seat you fill first. Some roles are simply slower to fill; our list of the hardest commercial trades positions to fill in 2026 is a useful companion when deciding where to start. And the cost of a rushed fill is real too, as the real cost of a bad hire in the trades lays out. The goal is a faster right hire, not any hire. If you're weighing recruiting models, see flat-rate vs. contingency recruiting.

Why we see this search differently

My Trade Talent recruits direct-hire across 20 commercial trades, with 597+ completed placements since 2022 across 240 distinct position titles. Across that many titles, the cost of a 90-day gap isn't one number: an open estimator seat and an open service tech seat hurt different parts of the business. We work on a flat monthly model, not a percentage-of-salary fee, which makes the comparison in section 5 simple: a known monthly cost against the weekly cost of the empty seat.

Bottom line

Use My Trade Talent's Cost of Vacancy calculator with your own numbers, then prioritize searches by economic impact. The most expensive vacancy is not always the oldest vacancy; it is the seat constraining the most valuable work. If a seat has been open long enough that you're doing this math, schedule a discovery call.

About the author

Michael Carter is President of My Trade Talent. He has been building outbound hiring programs since 2014, and commercial-trades talent pipelines since 2021. His work focuses on helping commercial-trades employers build repeatable direct-hire pipelines for hard-to-reach talent.

Frequently asked questions

How do I calculate what a vacant position is costing my trades business?

List the output the role would have produced each week, then add the overtime, subcontract labor and management hours spent covering it. Add the customer and schedule risk you can reasonably see. Multiply the weekly figure by how long the seat has been open, or use the Cost of Vacancy calculator with your own inputs.

Doesn't an open position save money because I'm not paying the salary?

Only on paper. The work still has to happen, so the cost moves into overtime, premium subcontract labor, callbacks and slower delivery. Some of it shows up as work you never get: fewer bids, delayed closeout or a customer who goes elsewhere.

Which open role should I fill first if several seats are empty?

The one constraining the most valuable work, not necessarily the one open the longest. Rank open seats by weekly economic impact and put your recruiting effort there first.

Is paying for recruiting help worth it after a role has been open 90 days?

Compare the weekly cost of the vacancy with the cost of recruiting help, a pay adjustment or a faster process. When the seat is constraining billable work, that comparison usually makes the decision for you. When it isn't, one of the cheaper fixes may be enough.

About the author

Michael Carter

President of My Trade Talent

Michael has spent more than a decade building outbound talent pipelines for commercial trades contractors. He leads recruiting for My Trade Talent, with a focus on hiring strategies that scale beyond the next vacancy.

More from Michael →

Keep going.

Tools, guides, and side-by-side comparisons that pair with this article.

Want a pipeline for HVAC & Mechanical?

Tell us what you're hiring for and we'll lay out exactly how we'd run it.

Trade Talk A monthly hiring brief for commercial trades employers

What changed in your trade this month, and what to do about it.

One email a month, and only one. We write a separate issue for every trade we recruit in, so you get yours - not a round-up with your trade buried in paragraph nine. Every issue is written for the person actually doing the hiring.

  • Where wages moved in your trade, by market, and what that does to your next offer
  • How long roles like yours are taking to fill, and where it is getting worse
  • Interview and screening tactics that are landing candidates this month
  • What contractors competing for the same people are doing differently

Built on federal wage data, our own closed searches, and what we hear on the desk every week. Written for employers, not candidates. No pitch, no filler, one click to leave.

Pick your trade. That is the one issue you get, once a month.

One email a month. Your trade and your address, nothing else - we do not sell either, and you can unsubscribe from the bottom of any issue. Read this month's issue for your trade first →

Call 314.886.7975 Schedule