Bricklayer / Mason Performance Review Template
Masonry & Concrete
5 weighted sections, 27 criteria, on a scale with written anchors. The criteria are things a manager can observe on a job rather than adjectives about a person, which is the difference between a review somebody can prepare for and one they can only receive.
The scale
| Rating | What it means |
|---|---|
| 1 | Does not meet. Specific, repeated and known to the person. |
| 2 | Below the seat. Needs supervision the role is not supposed to need. |
| 3 | Meets the seat. This is the standard, not the consolation. |
| 4 | Above the seat. Others are learning from how they do it. |
| 5 | Rare. Changes how the company does the work. |
A 3 is the standard the seat was hired against, not a disappointment. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing.
How the weighted score works
Each section rating is multiplied by that section's weight; the five results are added and divided by 100. Worked through with this role's own weightings, for an illustrative Bricklayer / Mason who is strong on the trade itself, standard on output and safety, and below the seat on communication:
| Section | Weight | Example rating | Weighted |
|---|---|---|---|
| A. Technical skill and execution | 30% | 4 | 1.20 |
| B. Productivity and measured results | 20% | 3 | 0.60 |
| C. Safety and compliance | 20% | 3 | 0.60 |
| D. Communication and customer handling | 15% | 2 | 0.30 |
| E. Reliability, teamwork and development | 15% | 3 | 0.45 |
| Overall | 100% | 3.15 |
3.15 on a scale where 3.00 is the seat performed to standard. The total is the least interesting number in that table. A 2 in one section can sit inside a total that reads as unremarkable, which is exactly why the section scores go on the form and the conversation happens section by section rather than about an average. The ratings above are an illustration, not a finding about anyone.
A. Technical skill and execution 30%
| Criterion | What good looks like |
|---|---|
| Line, level and plumb | Walls laid during the period hold plumb, level and coursing within trade tolerance, with no tear-out ordered by the foreman or inspector |
| Joint finish and uniformity | Joint width, profile and color stay consistent across the elevation and match the approved mock-up |
| Mortar practice | Mortar is mixed to the specified type and proportion, used inside board life, and retempered only as allowed |
| Reinforcement, ties and anchors | Joint reinforcement, veneer anchors, rebar and grout pass special inspection at the required spacing and coverage |
| Flashing, weeps and drainage | Through-wall flashing, end dams, weeps and drainage components are installed and verified by the foreman before the wall closes |
| Layout and coursing | Sets out from control lines and a story pole so openings, bond and elevations land where the drawing puts them |
B. Productivity and measured results 20%
| Criterion | What good looks like |
|---|---|
| Daily production | Units laid per shift meets the target for the wall type and height without a drop in quality |
| Tear-out and rework hours | Hours spent relaying or repointing this mason's own work stay near zero |
| Material waste | Broken units and discarded mortar stay within the job's allowance |
| Tender coordination | Keeps the tender ahead on mud, units and scaffold so the wall never waits on stock |
| Lift and elevation completion | Scaffold lifts and elevations finish on the look-ahead dates, including protection and cleaning |
C. Safety and compliance 20%
| Criterion | What good looks like |
|---|---|
| Scaffold use and inspection | Works only on tagged, inspected scaffold with planking, guardrails and access intact, and reports defects before climbing |
| Fall protection | Uses the required system at leading edges, on mast climbers and during erection, with no observed unprotected exposure |
| Silica controls | Wet cutting, dust collection and respirator use are in place for every saw, grinder and mixing task |
| Material handling and rigging | Loads are landed and stacked within scaffold capacity and hoisting is done with a signal person and a clear drop zone |
| Housekeeping and weather protection | The deck stays clear of units, tools and debris, and walls are covered before rain or freezing per the protection plan |
| Incident and hazard reporting | Near misses, damaged scaffold and injuries are reported to the foreman the same day |
D. Communication and customer handling 15%
| Criterion | What good looks like |
|---|---|
| Taking and confirming direction | Repeats back layout, coursing and detail direction from the foreman and builds to it without a second correction |
| Raising detail conflicts | Flags details that will not build — a flashing conflict, a dimension that will not course out — before building past them |
| Coordination with other trades | Works with steel, framing and glazing on embeds, openings and tolerances so no one has to come back |
| Conduct on site | Follows the general contractor's site rules, parking, badging and work hours, with no complaint from the GC or owner in the period |
| Directing tenders | Gives the tender specific instruction on stock, mud and scaffold so the wall stays supplied |
E. Reliability, teamwork and development 15%
| Criterion | What good looks like |
|---|---|
| Attendance and start time | On site, geared up and on the wall at shift start, including early starts on hot weather schedules |
| Timesheets and cost coding | Hours, quantities installed and weather notes are recorded daily and need no corrections |
| Flexibility across the job | Takes block, veneer, stone, pointing or cleanup work as the schedule requires without a drop in quality |
| Developing others | Taught at least one apprentice or tender a specific skill — leads, flashing, tooling — during the period |
| Response to coaching | Quality or production corrections from the foreman show up in the next lift and do not recur |
What this seat is measured on day to day
| Measure | What it captures |
|---|---|
| Units laid per day | Brick, block or stone installed per shift against the job's production target for that wall type |
| Rework and tear-out | Courses or sections torn out and relaid for plumb, bond, coursing or joint finish problems |
| Punch list items by elevation | Masonry punch items per elevation at substantial completion, including joint finish and cleaning |
| Mortar and material waste | Mortar mixed and discarded past board life, plus broken or unusable units charged to the crew |
| Special inspection results | Findings on reinforcement, grout, flashing and anchor spacing in the mason's work |
| Scaffold and safety observations | Scaffold findings, fall protection use and silica control observations in the mason's work area |
| Schedule performance by lift | Scaffold lifts and elevations completed on the dates in the foreman's look-ahead |
The same measures the job description for this role is written against, so the document you hire against and the document you rate against are measuring one thing.
Where this person goes next
Masons move to lead, foreman and superintendent; restoration and stone work pay above production block.
The review is the natural place for this conversation and the wrong place to have it for the first time. Someone hearing about the next seat in the same meeting as their rating hears it as consolation. Say it in advance, then use the review to say how far along they are.
The pay conversation
Federal figures: BLS Occupational Employment and Wage Statistics, May 2025, national, SOC 47-2021. The range is the 10th to 90th percentile and the median is $62,120. It is not adjusted for experience or region, and it is not a My Trade Talent band.
A review that produces a number and no pay decision is a review the employee will discount next year. One that produces a pay decision made in the same half hour is usually a decision made on the last thing discussed. Know where the person sits in the band before the meeting, and treat the rating as evidence for a decision you take afterwards.
Nothing here sets pay. What a rating is worth depends on your margins, your bands and your state, and those are yours.
What it costs if this one leaves
We have closed 1 masonry & concrete search in 2026 year to date, too few to publish a median for the trade, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 94 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
Worth knowing before the meeting rather than after it. The question a retention decision actually turns on is not whether a raise is deserved but what the seat costs empty for that long, and the calculator will put a figure on it for your billing rate.
Before you use it
Move the weightings to match how your business makes money, and move them before the review rather than after you have seen the scores. The split here is a starting point, not a judgement about your company.
Against every criterion, write the job, the date or the customer that evidences it. A criterion with nothing written beside it has not been met, however well the person is getting on, because you are about to make a decision and an impression is not evidence.
What follows from the result is yours. Pay, promotion and a development plan depend on your margins, your bands and your state, and nothing here sets them.
Questions employers ask about reviewing this role
How do you score an annual review for a Bricklayer / Mason?
5 sections, weighted to 30%, 20%, 20%, 15%, 15% in that order, each rated 1 to 5 against written anchors. Multiply each section rating by its weight, add the five results and divide by 100; the worked example on this page does it in full. A 3.00 is the seat performed to the standard it was hired against.
What should a rating of 3 mean?
Meets the seat. It is the standard, not the consolation. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing and defends nothing if the decision is ever questioned.
How many criteria does this review cover?
27 across 5 sections, all of them things a manager can observe on a job rather than adjectives about a person. Each one has what good looks like written out beside it, which is the difference between a review somebody can prepare for and one they can only receive.
Should the review set pay?
Not by itself, and nothing here does. The instrument tells you how the work was performed against the seat. What follows - a raise, a promotion, a development plan or none of them - depends on your margins, your bands and your state. For reference, the band for this role is $44,820 to $100,010.
What do I do with a 2 in one section?
Name the job, the date or the customer that evidences it, say what meeting the seat would look like instead, and put a date on when you will look again. A 2 with no evidence beside it is an impression, and an impression is not something you can ask someone to improve. A 2 that sits inside an acceptable overall total is also the most common thing a single summary number hides, which is why the section scores go on the form.
Can I change the weightings?
Yes, and you should if they do not match how your business makes money. Change them before the review rather than after you have seen the scores, and change them for the seat rather than the person. The split here is a starting point.
What is the next step up from Bricklayer / Mason?
Masons move to lead, foreman and superintendent; restoration and stone work pay above production block.
What does it cost if a Bricklayer / Mason leaves?
We have closed 1 masonry & concrete search in 2026 year to date, too few to publish a median for the trade, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 94 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. That is the refill clock; the cost of the vacancy runs alongside it from the day the seat empties.
One time
Where should we send it?
Tell us who you are once and every document on this site downloads for you from then on, with no form in the way. We are a recruiting firm: someone may call about the roles you are hiring for.