Skip to main content
Job description

Bricklayer / Mason Job Description

Masonry & Concrete

Lays brick, block and stone to line, level and plumb. Sets out layout and coursing from a story pole, selects and mixes mortar to the specified type, installs reinforcement, ties and anchors, builds flashing, weeps and drainage into cavity walls, and tools joints to a finish that will be looked at for the life of the building. Most of the work happens off scaffold, outdoors, in whatever weather the season brings.

15essential duties
8 / 7required / preferred qualifications
6credentials, each with who verifies it
Take this away as a Word document The same description, formatted for a personnel file, with an acknowledgement signature block at the end. The first download asks for your name, company, work email and phone; after that every document here downloads without a form.
Download .docx

What this seat pays

$44,820 to $100,010 BLS 10th to 90th percentile

Federal figures: BLS Occupational Employment and Wage Statistics, May 2025, national, SOC 47-2021. The range is the 10th to 90th percentile and the median is $62,120. It is not adjusted for experience or region, and it is not a My Trade Talent band.

Pay, location and the date prepared are blank in the Word version on purpose. They depend on your market and your margins, and a template that guesses at them is worse than one that leaves them to you. The figure above is here so the guess is at least anchored.

The seat

Reports toMasonry Foreman
Direct reportsNone; directs one or two mason tenders on the scaffold
FLSA statusNon-exempt — confirm with counsel
TradeMasonry & Concrete
Pay band$44,820 to $100,010 — BLS 10th to 90th percentile

Where the role goes next. Masons move to lead, foreman and superintendent; restoration and stone work pay above production block.

Essential duties (15)

  • Read drawings and elevations, set out the work from control lines and benchmarks, and establish coursing from a story pole.
  • Build leads at corners and openings, run line and level, and lay the wall plumb, level and in bond within trade tolerance.
  • Select and mix mortar to the specified type — M, S, N or O — at the correct cement, lime, sand and water proportions, and retemper only inside allowable board life.
  • Lay brick, CMU, architectural block, stone and cast stone, buttering and striking joints to the specified width and profile.
  • Install horizontal joint reinforcement, veneer anchors, ties, dowels and vertical rebar at the spacing the drawings require, and grout cells and bond beams.
  • Build cavity wall drainage correctly: through-wall and base flashing, end dams, weeps, drainage mat, mortar net and air barrier tie-ins.
  • Set lintels, bond beams, bearing plates and anchor bolts to elevation, and build in control and expansion joints where detailed.
  • Tool joints at the right point in the set so color and profile stay uniform across the whole elevation.
  • Cut brick, block and stone with wet saw, splitter, grinder or hammer and chisel to fit openings, corners and returns.
  • Erect, inspect and move tubular and mast climbing scaffold with the crew, keeping planking, guardrails, ties and access compliant.
  • Protect the work: cover walls at the end of each shift, apply cold or hot weather protection the specification calls for, and keep mortar droppings off the finished face.
  • Clean completed masonry with the approved method and dilution after a test panel, and point up voids, holes and tie penetrations.
  • Build to the approved mock-up or sample panel as the standard for color, bond, joint profile and cleaning.
  • Keep the work area, scaffold deck and mud boards clean and stocked, and coordinate with the tender on mortar, brick and block supply.
  • Record daily production and quantities installed, note weather delays, and submit timesheets with the correct cost codes.

Qualifications

Required
  • Three or more years laying brick, block and stone on commercial projects, or completion of a masonry apprenticeship.
  • Ability to read drawings and elevations, build from a story pole, and hold plumb, level and bond without being reset by the foreman.
  • Working knowledge of mortar types, mixing and board life, and of cavity wall flashing, weeps and reinforcement details.
  • Ability to work off tubular and mast climbing scaffold at height, using fall protection where required.
  • Ability to lift and place units weighing up to 80 pounds repeatedly and to work outdoors in heat, cold and wind.
  • OSHA 10 and scaffold user training, with OSHA 30 for crew leads.
  • Own trowels, levels, jointers and basic masonry hand tools.
  • Reliable transportation and a valid driver's license to reach job sites and report at shift start.
Preferred
  • Experience with architectural masonry: ground face and glazed block, thin brick, natural and cast stone, and restoration pointing.
  • Union or NCCER masonry credential, or a completed apprenticeship card.
  • Mast climbing scaffold erection and operation experience.
  • Reinforced masonry and grouting experience, including high-lift grouting and cleanouts.
  • Historic repointing experience with mortar color and profile matching.
  • Cutting and welding familiarity for lintel, angle and shelf angle work.
  • Ability to lead a small crew and run line for other masons.

The line between these two columns is the one that costs you candidates. Everything in the preferred column that gets written into a posting as a requirement removes people who could do the job, and in a trade with a shortage that is a self-inflicted wound.

Credentials, and who verifies them

CredentialStatusVerify with
OSHA 10-Hour Construction, or OSHA 30 for crew leadsRequiredCard number verified with the authorized outreach trainer
Scaffold user and mast climber trainingRequiredThe trainer or equipment supplier that delivered it, with the record in the employee file
Silica awareness training and respirator fit testRequiredOccupational health provider for the fit test and the safety manager for the training record
NCCER Masonry credential or completed apprenticeship certificatePreferredNCCER registry or the joint apprenticeship committee that issued the card
Journeyman or state trade registrationWhere the state requires itThe state or municipal licensing board for the jurisdiction
Valid driver's license and insurable recordPreferredState motor vehicle record, where a company truck is driven

Verify before an offer rather than after. A credential taken on trust at offer is the most expensive line on this page. We track masonry & concrete licensing in 39 states; which of them applies depends on where the work is, not where the company is.

Physical demands

ActivityFrequency
Standing and walking on scaffold plank and uneven groundConstant (over 2/3 of shift)
Repetitive bending and reaching from the mud board to the wall, hundreds of cycles per hourConstant (over 2/3 of shift)
Lifting and placing units up to 80 pounds, with constant repetitive lifting of brick and blockConstant (over 2/3 of shift)
Working at height on scaffold or a mast climber, with fall protection where requiredConstant (over 2/3 of shift)
Sustained gripping and wrist motion with trowel, jointer and brick hammerConstant (over 2/3 of shift)
Exposure to outdoor heat, cold, wind, sun and rain for the full shiftConstant (over 2/3 of shift)
Working with arms extended and overhead when laying above shoulder heightFrequent (1/3 to 2/3 of shift)
Climbing scaffold ladders and access towers several times a shiftFrequent (1/3 to 2/3 of shift)
Kneeling and squatting to lay first courses, set flashing and point low workFrequent (1/3 to 2/3 of shift)
Handling wet mortar, lime and masonry cleaning acids with gloves and eye protectionFrequent (1/3 to 2/3 of shift)
Wearing a respirator while cutting, grinding or mixing where silica controls require itOccasional (under 1/3 of shift)
Working in trenches, crawl spaces or elevator pits on foundation and shaft workRarely

This is the section a reasonable accommodation decision actually turns on, which is why it is role specific rather than copied across a trade. An estimator sits and walks sites; a screed operator stands beside hot asphalt all day.

Work environment

Outdoors on commercial construction sites for nearly all of the work, year round, on scaffold or a mast climber at heights from a few feet to several stories. Conditions include wet mortar, lime, respirable silica from cutting and mixing, saw noise, hoist and forklift traffic, open leading edges, and heat, cold, wind and rain that move the schedule. Interior work includes block walls, shafts and elevator pits.

Tools and equipment

The employer provides scaffold, mixers, mortar and units, wet saws, grinders, hoists, silica dust controls, hard hat, glasses and fall protection. The mason is expected to own trowels, levels, line blocks and pins, jointers, brick hammer, chisels, tape, square, tool bag, gloves and steel-toe boots.

How performance is measured

MeasureWhat it captures
Units laid per dayBrick, block or stone installed per shift against the job's production target for that wall type
Rework and tear-outCourses or sections torn out and relaid for plumb, bond, coursing or joint finish problems
Punch list items by elevationMasonry punch items per elevation at substantial completion, including joint finish and cleaning
Mortar and material wasteMortar mixed and discarded past board life, plus broken or unusable units charged to the crew
Special inspection resultsFindings on reinforcement, grout, flashing and anchor spacing in the mason's work
Scaffold and safety observationsScaffold findings, fall protection use and silica control observations in the mason's work area
Schedule performance by liftScaffold lifts and elevations completed on the dates in the foreman's look-ahead

These are the same measures the annual review for this role is built on, so the document you hire against and the document you rate against are measuring one thing.

Reading a resume for this seat

What separates a strong Bricklayer / Mason from a plausible one, on paper and in the first ten minutes of a call:

  • Coursing and layout described as the part that cannot be fixed later
  • Knows mortar types and where each is required rather than using one everywhere
  • Understands flashing, weeps and air gaps as the wall's drainage system

Screen for it: 3 questions and what a strong answer contains

A job description tells you what you need. These tell you whether the person in front of you has it. Each one comes with what a strong answer contains, because an interviewer who does not know that is persuaded by fluency, which is exactly what the question was supposed to see past.

How do you set out a wall so the coursing lands correctly at the openings?

What a strong answer contains

Sets out dry before laying anything: rod or story pole made from the actual units and the specified joint, checked against the opening heads and sills, the floor levels and anything the wall has to meet. Adjusts the bed joint within tolerance across several courses rather than making one fat joint at the top. Checks the openings are where the drawings say before building to them, because they often are not.

Follow up with: What do you do when the opening heights will not course?

Which mortar type for a structural CMU wall, and why not the one you use on veneer?

What a strong answer contains

Knows mortar is chosen for strength, bond and flexibility together, and that the strongest mortar is not the best choice everywhere: a structural wall carrying load needs the compressive strength the engineer specified, while a veneer benefits from a softer mortar with better workability and bond that will not crack the units. Says the specification decides, and that using a high-strength mortar on soft brick causes the brick to fail rather than the joint.

Follow up with: Why is a harder mortar sometimes worse than a softer one?

Walk me through flashing and weeps at the base of a cavity wall.

What a strong answer contains

Describes the system as a drainage path, not a layer: flashing turned up the backup and sealed or terminated properly, lapped and sealed at the joints, with end dams at the ends and at every interruption, a drainage material or clear cavity above it, and weeps at the specified spacing sitting on top of the flashing with nothing blocking them. Says the end dam and the mortar droppings are what most wet walls come down to.

Follow up with: What is an end dam for, and what happens without one?

The mistake this seat invites

Hiring on units laid per day. Layout and water management decide whether the wall is right; speed only matters after that.

How long this takes to fill

We have closed 1 masonry & concrete search in 2026 year to date, too few to publish a median for the trade, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.

Worth writing on the requisition before you post it. The cost of the vacancy runs from the day the seat empties, not from the day you start looking, and the calculator will put a number on it for your billing rate.

Questions employers ask about this role

What does a Bricklayer / Mason do?

Lays brick, block and stone to line, level and plumb. Sets out layout and coursing from a story pole, selects and mixes mortar to the specified type, installs reinforcement, ties and anchors, builds flashing, weeps and drainage into cavity walls, and tools joints to a finish that will be looked at for the life of the building. Most of the work happens off scaffold, outdoors, in whatever weather the season brings. The full description below lists 15 essential duties in trade terms, with physical demands and frequencies.

What qualifications does a Bricklayer / Mason need?

8 requirements are written as non-negotiable for this seat. The first 3: Three or more years laying brick, block and stone on commercial projects, or completion of a masonry apprenticeship; Ability to read drawings and elevations, build from a story pole, and hold plumb, level and bond without being reset by the foreman; Working knowledge of mortar types, mixing and board life, and of cavity wall flashing, weeps and reinforcement details. A further 7 qualifications are preferred rather than required, which is the distinction that decides whether a good candidate gets screened out by your own posting.

What credentials should I verify before making an offer to a Bricklayer / Mason?

4 credentials on this role are either required outright or required where the state requires it: OSHA 10-Hour Construction, Scaffold user and mast climber training, Silica awareness training and respirator fit test and Journeyman or state trade registration. Each one has a named place to verify it in the table below. Verify before the offer rather than after; a credential taken on trust at offer is the most expensive line in a job description.

Is a Bricklayer / Mason exempt or non-exempt?

Non-exempt — confirm with counsel. FLSA status turns on the duties actually performed rather than the job title, and the duties for this seat are listed below so a classification decision has something to rest on. We are not lawyers and the note here is a starting point for counsel, not a determination.

What should a Bricklayer / Mason be paid?

$44,820 to $100,010. Federal figures: BLS Occupational Employment and Wage Statistics, May 2025, national, SOC 47-2021. The range is the 10th to 90th percentile and the median is $62,120. It is not adjusted for experience or region, and it is not a My Trade Talent band.

How long does it take to hire a Bricklayer / Mason?

We have closed 1 masonry & concrete search in 2026 year to date, too few to publish a median for the trade, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.

What is the most common hiring mistake in this seat?

Hiring on units laid per day. Layout and water management decide whether the wall is right; speed only matters after that.

Trade Talk A monthly hiring brief for commercial trades employers

What changed in your trade this month, and what to do about it.

One email a month, and only one. We write a separate issue for every trade we recruit in, so you get yours - not a round-up with your trade buried in paragraph nine. Every issue is written for the person actually doing the hiring.

  • Where wages moved in your trade, by market, and what that does to your next offer
  • How long roles like yours are taking to fill, and where it is getting worse
  • Interview and screening tactics that are landing candidates this month
  • What contractors competing for the same people are doing differently

Built on federal wage data, our own closed searches, and what we hear on the desk every week. Written for employers, not candidates. No pitch, no filler, one click to leave.

Pick your trade. That is the one issue you get, once a month.

One email a month. Your trade and your address, nothing else - we do not sell either, and you can unsubscribe from the bottom of any issue. Read this month's issue for your trade first →