Skip to main content
Masonry & Concrete hiring kit

How to hire masons and concrete finishers.

To hire for masonry & concrete well, My Trade Talent's Masonry & Concrete hiring kit takes all 2 roles we recruit in order: what each seat is and what it pays, the technical questions that test it, the 4 credentials to verify, and what can kill the offer between acceptance and the first day.

2 roles: Bricklayer / Mason, Concrete Finisher. Free, with nothing to fill in. If you would rather a recruiter ran the search, that is the Masonry & Concrete recruiting page.

Step 1 · Plan

What each masonry & concrete seat is, and what it pays.

Each band is labelled with where it comes from. A My Trade Talent band is mid-experience, built from our own engagement history, and moves with experience and region. A BLS band is the federal 10th to 90th percentile, national and unadjusted, used where we have not closed enough searches in the trade to publish our own.

Masonry & Concrete roles, pay bands and credentials

BLS 10th to 90th percentileEvery bar is drawn on one scale, $35,000 to $110,000.

  • Bricklayer / Mason

    BLS 10th to 90th percentile

    Lays brick, block and stone to line and level: layout and coursing, mortar selection and mixing, reinforcement and ties, flashing and weeps in a cavity wall, and the joint finish that will be looked at for the building's life.

    Pay band $44,820 to $100,010 Federal figures: BLS Occupational Employment and Wage Statistics, May 2025, national, SOC 47-2021. The range is the 10th to 90th percentile and the median is $62,120. It is not adjusted for experience or region, and it is not a My Trade Talent band.
    Credentials that move an offer None that reliably moves an offer
  • Concrete Finisher

    BLS 10th to 90th percentile

    Places, screeds, floats and finishes concrete flatwork: judging the set, bull floating, edging and jointing, power trowelling to the specified finish, and curing.

    Pay band $39,190 to $85,480 Federal figures: BLS Occupational Employment and Wage Statistics, May 2025, national, SOC 47-2051. The range is the 10th to 90th percentile and the median is $57,020. It is not adjusted for experience or region, and it is not a My Trade Talent band.
    Credentials that move an offer None that reliably moves an offer

We have closed 1 masonry & concrete search in 2026 year to date, too few to publish a median for the trade, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. The full distribution is in the Hiring Index.

Price the seat by experience and region in the salary calculator, and work out what leaving it open costs in the cost of vacancy calculator.

Step 3 · Interview

How to interview for each masonry & concrete role.

Everyone who applies will claim the experience. These are the questions that test it, the signals that separate a strong candidate from a plausible one, and the mistake each seat invites.

Bricklayer / Mason

BLS 10th to 90th percentile

Lays brick, block and stone to line and level: layout and coursing, mortar selection and mixing, reinforcement and ties, flashing and weeps in a cavity wall, and the joint finish that will be looked at for the building's life. Works off scaffold for most of it.

Questions that find out

  1. How do you set out a wall so the coursing lands correctly at the openings?

    A strong answer Sets out dry before laying anything: rod or story pole made from the actual units and the specified joint, checked against the opening heads and sills, the floor levels and anything the wall has to meet. Adjusts the bed joint within tolerance across several courses rather than making one fat joint at the top. Checks the openings are where the drawings say before building to them, because they often are not.

    Follow up with What do you do when the opening heights will not course?

  2. Which mortar type for a structural CMU wall, and why not the one you use on veneer?

    A strong answer Knows mortar is chosen for strength, bond and flexibility together, and that the strongest mortar is not the best choice everywhere: a structural wall carrying load needs the compressive strength the engineer specified, while a veneer benefits from a softer mortar with better workability and bond that will not crack the units. Says the specification decides, and that using a high-strength mortar on soft brick causes the brick to fail rather than the joint.

    Follow up with Why is a harder mortar sometimes worse than a softer one?

  3. Walk me through flashing and weeps at the base of a cavity wall.

    A strong answer Describes the system as a drainage path, not a layer: flashing turned up the backup and sealed or terminated properly, lapped and sealed at the joints, with end dams at the ends and at every interruption, a drainage material or clear cavity above it, and weeps at the specified spacing sitting on top of the flashing with nothing blocking them. Says the end dam and the mortar droppings are what most wet walls come down to.

    Follow up with What is an end dam for, and what happens without one?

  4. How do you set up leads and keep a long wall true?

    A strong answer Builds the leads first, plumb and level and to the rod, then runs the line between them and keeps every course to the line rather than to the course below. Checks the leads with a level and from the end for a wind. Re-checks plumb as the lead rises and does not build more than a few courses without checking. Says a wall is only as true as its leads and that chasing it out of the middle never works.

    Follow up with How often do you check a lead as it rises?

  5. What is your approach to mixing and matching mortar on a repair?

    A strong answer Matches the existing rather than using what is on the truck: looks at colour, texture, aggregate and, on an older building, the strength, because a hard modern mortar in a soft old wall destroys the brick. Analyses or at least takes a sample of the existing mortar and tries samples on an inconspicuous area, letting them cure before judging the colour. Tools the joint to match the original profile, which matters as much as the colour.

    Follow up with Why can a strong mortar damage an old brick wall?

  6. How do you keep a cavity clean of mortar droppings as you build?

    A strong answer Treats it as a daily discipline rather than a clean-out at the end: bevelling the bed joint away from the cavity, using a cavity board or batten lifted as the wall rises, and clearing the base before closing it up. Knows that droppings sitting on the flashing bridge the cavity and block the weeps, and that this is the single most common cause of a wet wall that nobody can find a leak in.

    Follow up with What does a blocked cavity look like from the inside of the building?

  7. What changes in your process in cold or hot weather?

    A strong answer Cold: materials and mixing water kept above the minimum, no frozen units or sand, protection and heat after laying for the period required, and knowing that mortar that freezes before it sets has no strength even if it looks fine. Hot: units wetted where appropriate, smaller batches, shaded materials, and protection from drying too fast which gives a weak bond and shrinkage cracks. Knows the temperature limits rather than judging by feel.

    Follow up with What does frozen mortar look like after it thaws?

  8. How do you deal with a brick delivery that does not match the existing blend?

    A strong answer Stops before laying. Compares against the approved sample and the existing wall in daylight rather than under site lighting, checks whether it is a different run, and lays out a dry panel to see how it reads at a distance. Raises it with the supplier and the project manager the same day. Says that blending from multiple pallets is normal and necessary, and that a genuine mismatch is a rejection rather than something to spread out.

    Follow up with How do you tell normal blend variation from a wrong delivery?

  9. What is your approach to reinforcing and grouting a CMU wall?

    A strong answer Places the bar where the drawing says with the specified cover and lap, holds it in position with positioners rather than hoping, and keeps the cells clean with cleanouts where the lift height requires them. Grouts in lifts the specification allows and consolidates properly, knowing unconsolidated grout leaves voids around the steel. Checks nothing has moved before grouting, because after the pour nobody can see it.

    Follow up with How do you know the grout filled the cell?

  10. What is your approach to a lintel or opening detail?

    A strong answer Checks the lintel is the specified size and material with the bearing the drawing requires at each end, set level and on a solid bearing, with the flashing and end dams carried over it and weeps above. Knows a steel lintel needs the right coating or protection and clearance for movement. Says the opening head is where water gets in and where cracking starts, and that the detail is worth getting right even when nobody will see it.

    Follow up with How much bearing does a lintel need at each end, and who tells you?

  11. How do you handle efflorescence a customer is complaining about?

    A strong answer Explains what it is - salts carried out by water moving through the wall - and that the real question is where the water is coming from, not how to scrub it off. Checks the obvious sources: blocked weeps, a bridged cavity, failed flashing, saturated ground, a leaking parapet or coping. Cleans it properly with the mildest effective method after fixing the source. Says cleaning without fixing the water means it comes back.

    Follow up with What does recurring efflorescence in one spot tell you?

  12. What is your process for tuckpointing an older building?

    A strong answer Cuts out to the depth the joint needs, by hand or with care, rather than grinding and widening the joint and damaging the brick arrises - which is the damage you see on badly repointed buildings. Matches the mortar in strength, colour and texture, dampens the joint, fills in layers rather than one deep fill, and tools to match the original profile. Says the brick is harder to replace than the mortar, so the mortar must be the sacrificial part.

    Follow up with What damage do you see most often from a bad repointing job?

  13. How do you deal with a wall that is out of plumb from the foundation up?

    A strong answer Measures how far out before deciding anything and raises it rather than quietly correcting it in the masonry, because correcting a foundation error in the wall means the units overhang their bearing or the cavity width changes. Finds out what the tolerance allows and what the wall has to meet at the top. Gets the engineer or the general contractor to decide, in writing, and documents what they were told to do.

    Follow up with How much can you correct in the masonry before it becomes somebody else's problem?

  14. What is your approach to control joints and where do they belong?

    A strong answer Knows control joints in CMU accommodate shrinkage and go where the drawings show them - near openings, at changes of height or thickness, at corners and at the spacing the specification sets - and that expansion joints in brick do the opposite job. Builds them as a genuine break with the right backer and sealant rather than filling them with mortar. Raises missing joints on a drawing rather than leaving them out.

    Follow up with What is the difference between a control joint in block and an expansion joint in brick?

  15. How do you protect new work from weather overnight?

    A strong answer Covers the top of every unfinished wall, overhanging both faces so rain cannot run into the cores and the cavity, and secures it against wind. Knows saturated new masonry is the cause of efflorescence and of mortar that never gains strength, and that an uncovered wall over a wet weekend can mean taking it down. In cold weather, adds the protection and heat the specification requires. Does it every day rather than when rain is forecast.

    Follow up with Why cover a wall when there is no rain forecast?

  16. What do you check before the scaffold comes down?

    A strong answer Walks every elevation while they can still reach it: joints struck and consistent, no holes or missing mortar, weeps clear and present, flashing and sealant complete, units clean and any staining dealt with, ties in place and the pattern correct, and the work plumb and true. Takes photographs of what will be hidden. Knows that everything found after the scaffold is down costs ten times as much to fix.

    Follow up with What is the most expensive thing to find after the scaffold is gone?

What a strong candidate shows

  • Coursing and layout described as the part that cannot be fixed later
  • Knows mortar types and where each is required rather than using one everywhere
  • Understands flashing, weeps and air gaps as the wall's drainage system

The mistake

The mistake this seat invites. Hiring on units laid per day. Layout and water management decide whether the wall is right; speed only matters after that.

Concrete Finisher

BLS 10th to 90th percentile

Places, screeds, floats and finishes concrete flatwork: judging the set, bull floating, edging and jointing, power trowelling to the specified finish, and curing. The whole job happens inside a window the weather decides.

Questions that find out

  1. How do you know when the slab is ready to float, and what happens if you start early?

    A strong answer Reads the slab rather than the clock: the bleed water gone from the surface, and a footprint leaving a shallow impression rather than sinking in. Knows it varies across the slab with sun, wind, mix and thickness, so one area may be ready while another is not. Starting early works bleed water back into the surface and gives a weak, dusting, crazed finish that shows up months later as a soft floor.

    Follow up with Why is working bleed water back into the surface so damaging?

  2. Where do your control joints go on a slab with columns, and why there?

    A strong answer Puts joints through the columns rather than past them, usually with a diamond or a box-out around the column, because the column is a restraint and a crack will start there otherwise. Keeps panels close to square rather than long and thin, respects the maximum spacing for the thickness, and lines joints up with re-entrant corners and changes in the slab. Says a crack will appear where you did not put a joint.

    Follow up with Why does a long thin panel crack when a square one does not?

  3. The forecast says rain in two hours and the truck is on site. What do you do?

    A strong answer Decides before the concrete is on the ground: how much can be placed and finished in the time, whether covering is realistic for that area, and whether to cut the pour at a planned joint rather than being caught mid-slab. Has covering and a plan ready rather than sending for it. Will stop and send trucks back, because rain on a fresh surface means a weak, scaled finish that has to come out.

    Follow up with What does rain on a freshly floated slab do to it?

  4. How do you work with the pump or the chute so the placement does not outrun the finishing?

    A strong answer Matches placement rate to what the finishing crew can actually handle, and says so to the pump operator and the supervisor rather than letting the slab get ahead and then chasing it. Plans the direction of pour so they are always working to a fresh edge and never boxed in. Knows crew size and the weather decide the rate, and that a slab placed faster than it can be finished is finished badly.

    Follow up with Who sets the pour rate on your jobs?

  5. What causes a slab to craze or dust, and how do you avoid it?

    A strong answer Names the causes: finishing with bleed water on the surface, adding water to the surface to make it work easier, overworking the surface, finishing too early, and inadequate or late curing. Avoids them by waiting for the bleed to go, never sprinkling water, keeping the trowelling appropriate to the finish, and curing properly and promptly. Says dusting is almost always a finishing or curing fault rather than a bad mix.

    Follow up with What happens when somebody sprinkles water to make the surface work?

  6. How do you handle a pour that is setting faster than the crew can finish?

    A strong answer Recognises it early from the mix, the weather and how the first area is behaving, and gets more hands, more machines, or slows the placement rather than racing and finishing badly. Works in smaller areas, prioritises getting the surface closed. Talks to the supplier about the mix and the admixtures for the next load. Says they would rather stop the pour at a joint than hand over a slab they could not finish properly.

    Follow up with What tells you in the first twenty minutes that you are going to lose it?

  7. What is your approach to joints, and what happens when they are cut late?

    A strong answer Cuts as early as the concrete will allow without ravelling - the window is hours, not days, and shorter in hot weather - because the slab will crack on its own if the joint is not there first. Knows early-entry saws exist precisely to widen that window. Cuts to the required depth, usually a fraction of the slab thickness, because a shallow cut does not induce the crack. Says a late joint is a decorative line next to a real crack.

    Follow up with How deep does the cut need to be to actually work?

  8. How do you finish to a flatness spec, and how do you check it?

    A strong answer Knows flatness and levelness are measured separately and that the finishing technique drives flatness while the screeding and the forms drive levelness. Uses a laser screed or a straightedge and checks as they go rather than after. Knows the slab has to be measured within a defined time after placement and that fixing it afterwards means grinding or topping. Can say which numbers their work typically achieves.

    Follow up with What can you still fix on a slab the next morning, and what cannot be fixed?

  9. What is your approach to a slab on metal deck versus on grade?

    A strong answer Knows the deck deflects as the concrete goes on, so a constant-thickness pour and a constant-elevation pour are different things and the specification has to say which. Watches the thickness over the mid-span, works with the deck's camber rather than against it, and knows curing and the deck's effect on drying differ from a slab on grade. Checks the deck is clean and the studs and reinforcement are right before any concrete arrives.

    Follow up with Why does a slab on deck end up thicker in the middle?

  10. What is your approach to curing and why does it get shortcut?

    A strong answer Starts curing as soon as the surface will take it and keeps it going for the full period, by wet cure, covering or a curing compound compatible with whatever goes on the floor later. Knows it gets shortcut because the slab looks finished and the next trade wants the space, and that the cost appears later as dusting, crazing, low strength and curling. Says what they would insist on and to whom.

    Follow up with What does a slab that was not cured look like a year later?

  11. How do you handle a slab that has to receive a specific floor covering later?

    A strong answer Finds out what is going down before the pour, because it changes everything: curing compounds that must be compatible or omitted, the finish - a hard-trowelled surface is wrong under some coverings - the flatness tolerance, and the moisture the slab will have to reach. Says that most flooring failures start here, and that nobody asks the finisher until the flooring contractor fails the slab.

    Follow up with What would you ask before pouring a slab that will take resilient flooring?

  12. What is your process for an exposed aggregate or decorative finish?

    A strong answer Plans it before the pour: the mix and the aggregate chosen for the look, a sample panel made and approved on site rather than from a brochure, and the method - surface retarder and wash, or seeding - and the timing worked out for the day's conditions. Knows the window for washing is narrow and varies across the slab. Protects it afterwards. Says the sample panel is what prevents the argument.

    Follow up with How do you make sure the finished slab looks like the sample?

  13. How do you handle a cold joint you did not plan for?

    A strong answer Stops at a sensible line rather than wherever the concrete ran out, forms or cuts a proper edge and keys it where the design allows, and tells the engineer, because an unplanned joint in a structural slab is their decision. Knows how to prepare the face before the next pour and that a cold joint is a plane of weakness and a water path. Does not feather it out and hope it disappears.

    Follow up with Who has to know about an unplanned cold joint?

  14. What is your approach to reinforcing placement and cover?

    A strong answer Checks the steel is where the drawing says before any concrete arrives: the right size and spacing, supported on chairs rather than pulled up during the pour, laps correct, and cover maintained top and bottom. Knows mesh walked into the bottom of a slab does nothing, and that insufficient cover means corrosion later. Keeps the crew off it during placement and checks it again as the pour moves.

    Follow up with What is wrong with pulling mesh up with a hook during the pour?

  15. How do you finish around embeds and penetrations?

    A strong answer Finds them before the pour, checks they are secured and at the right elevation, and plans the finishing around them because that is where the surface goes wrong. Works the concrete properly around and under an embed so there are no voids, keeps the finish consistent up to the edge, and knows a joint or a crack will often want to run from a penetration so a joint may need to pick it up.

    Follow up with Why do cracks so often start at a penetration?

  16. What would make you reject a truck?

    A strong answer Names real triggers: slump outside the specified range, concrete older than the time limit from batching, water added on site beyond what the ticket allows, the wrong mix on the ticket, or visible segregation. Checks the ticket every load. Knows adding water at the truck to make it place easier destroys the strength and is the most common thing they will be asked to allow. Says they have sent a truck back.

    Follow up with Who asks you to add water, and what do you say?

What a strong candidate shows

  • Reads the set rather than working to a clock
  • Knows what jointing is for and where the joints have to land
  • Has finished to a flatness specification and knows how it was measured

The mistake

The mistake this seat invites. Screening on general construction labour history. Finishing is a timing judgement under weather pressure, and a slab finished wrong cannot be redone.

Every role in every trade is in the interview question bank.

Step 4 · Offer

What can kill a masonry & concrete offer before day one.

The things that end an accepted offer between the yes and the start date, specific to this trade and each sourced.

  • Silica medical surveillance arrives weeks after the start date

    Surveillance becomes mandatory once someone must wear a respirator 30 or more days a year, with the initial exam inside 30 days of assignment and including a chest X-ray, a pulmonary function test and TB screening. Candidates accept a cutting role and then face tests they did not expect, which produces both withdrawals and genuine restrictions after the crew is staffed.

    Source: www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.1153
  • The 1,500 hours cannot be documented

    ACI Concrete Flatwork Finisher needs 1,500 hours of finishing experience evidenced, plus the performance exam. Finishers who worked cash, as 1099s, or for contractors since gone under often cannot prove the hours. If the job was sold on spec language requiring certified finishers, a capable candidate is unusable on that job.

    Source: www.concrete.org/certification/certificationprograms.aspx?m=details&pgm=concrete+flatwork+finishing&cert=concrete+flatwork+associate%2C+finisher%2C+and+advanced+finisher
  • Weather decides the paycheque

    BLS notes masons work mostly outdoors and that inclement weather affects their schedules. Candidates arriving from indoor or year-round hourly work accept, then leave when the first rain-out or cold snap cuts a week. It is the most common trade-specific reason a masonry offer is accepted and then abandoned inside two months.

    Source: www.bls.gov/ooh/construction-and-extraction/brickmasons-blockmasons-and-stonemasons.htm
  • The telehandler card does not transfer

    Powered industrial truck certification is issued by the employing organisation, and previous training counts only where the new employer can demonstrate it applies to their equipment and site. A mason tender hired partly for lift capability cannot be used that way on day one.

    Source: www.osha.gov/etools/powered-industrial-trucks/training

Add up the whole offer, not just the base, in the offer calculator.

Step 5 · Onboard

Credentials to verify before the first day.

Each names the body that issues it and links to the issuer's own page or a .gov page. Researched 2026-09-23; re-read the source before relying on an entry.

  • ACI Concrete Flatwork Finisher, with Associate below it and Advanced Finisher above

    American Concrete Institute (ACI)

    The national flatwork credential specifiers name. Finisher requires 1,500 hours of actual on-the-job finishing experience, roughly a year full time, plus a performance exam covering placing, consolidating, finishing, edging, jointing, curing and initial protection. Valid five years. Note the renaming: Associate was Technician and Finisher was Tradesman, so older resumes carry the old names.

    Source: www.concrete.org/certification/certificationprograms.aspx?m=details&pgm=concrete+flatwork+finishing&cert=concrete+flatwork+associate%2C+finisher%2C+and+advanced+finisher
  • ACI Concrete Field Testing Technician, Grade I

    American Concrete Institute (ACI)

    What allows someone to sign off field acceptance testing on most commercial pours, covering seven ASTM methods including slump, air content, density and field specimens. Written and performance exams, valid five years, with recertification by retaking both.

    Source: www.concrete.org/certification/certificationprograms.aspx?m=details&pgm=Field+Concrete+Testing&cert=Concrete+Field+Testing+Technician%E2%80%94Grade+I
  • NCCER masonry curriculum and journey-level Mason assessment

    National Center for Construction Education and Research (NCCER)

    The main portable non-union masonry credential, a three-level curriculum NCCER states complies with US Department of Labor apprenticeship standards, plus a journey-level assessment. Credentials are employer-verifiable and travel between metros, which matters in a trade that follows the work.

    Source: www.nccer.org/craft-catalog/masonry/
  • Silica competent person designation under OSHA 29 CFR 1926.1153

    Designated by the employer under the OSHA respirable crystalline silica construction standard

    Every cutting, grinding, mixing and tuckpointing crew needs a written exposure control plan and a designated competent person able to identify hazards, authorised to correct them and inspecting frequently. Being that named person is a distinct and pay-relevant role.

    Source: www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.1153

State licensing for 39 states (Alabama, Arkansas, Arizona, California, Colorado, Connecticut, District of Columbia, Florida, Georgia, Hawaii, Iowa, Idaho, Illinois, Indiana, Kansas, Kentucky, Louisiana, Massachusetts, Maryland, Michigan, Minnesota, Missouri, North Carolina, Nebraska, New Mexico, Nevada, New York, Ohio, Oklahoma, Oregon, Pennsylvania, Rhode Island, South Carolina, Tennessee, Texas, Utah, Virginia, Washington and Wisconsin) is in the credential check, each with the agency and its source. Open the credential check for Masonry & Concrete.

Step 6 · Retain

Where each role goes next.

Candidates ask about the next step in the first conversation, and an employer who can answer it keeps the people who had other options. Say it on day one, too.

  • Bricklayer / Mason

    Masons move to lead, foreman and superintendent; restoration and stone work pay above production block.

  • Concrete Finisher

    Finishers move to lead finisher and foreman, and decorative and polished work extends the career.

Questions

Hiring for masonry & concrete: questions.

What interview questions should I ask when hiring for masonry & concrete?

My Trade Talent's Masonry & Concrete hiring kit carries 16 technical questions for each of its 2 roles. For the Bricklayer / Mason, the first is: "How do you set out a wall so the coursing lands correctly at the openings?" The full set, with the signals that separate a strong answer, is on this page and in the interview question bank.

What credentials should I verify when hiring in masonry & concrete?

The Masonry & Concrete kit lists 4, each with its issuing body and a primary source: ACI Concrete Flatwork Finisher, with Associate below it and Advanced Finisher above, ACI Concrete Field Testing Technician, Grade I, NCCER masonry curriculum and journey-level Mason assessment and Silica competent person designation under OSHA 29 CFR 1926.1153.

What can kill a masonry & concrete job offer before the start date?

The Masonry & Concrete kit names 4, each sourced: Silica medical surveillance arrives weeks after the start date, The 1,500 hours cannot be documented, Weather decides the paycheque and The telehandler card does not transfer.

What do masonry & concrete roles pay?

Bricklayer / Mason: $44,820 to $100,010 (BLS 10th to 90th percentile); Concrete Finisher: $39,190 to $85,480 (BLS 10th to 90th percentile). My Trade Talent bands are mid-experience and move with experience and region; BLS figures are national and unadjusted.

How long does it take to hire in masonry & concrete?

We have closed 1 masonry & concrete search in 2026 year to date, too few to publish a median for the trade, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.

Trade Talk A monthly hiring brief for commercial trades employers

What changed in your trade this month, and what to do about it.

One email a month, and only one. We write a separate issue for every trade we recruit in, so you get yours - not a round-up with your trade buried in paragraph nine. Every issue is written for the person actually doing the hiring.

  • Where wages moved in your trade, by market, and what that does to your next offer
  • How long roles like yours are taking to fill, and where it is getting worse
  • Interview and screening tactics that are landing candidates this month
  • What contractors competing for the same people are doing differently

Built on federal wage data, our own closed searches, and what we hear on the desk every week. Written for employers, not candidates. No pitch, no filler, one click to leave.

Pick your trade. That is the one issue you get, once a month.

One email a month. Your trade and your address, nothing else - we do not sell either, and you can unsubscribe from the bottom of any issue. Read this month's issue for your trade first →