Skip to main content
Commercial Irrigation hiring kit

How to hire irrigation technicians.

To hire for commercial irrigation well, My Trade Talent's Commercial Irrigation hiring kit takes all 2 roles we recruit in order: what each seat is and what it pays, the technical questions that test it, the 4 credentials to verify, and what can kill the offer between acceptance and the first day.

2 roles: Irrigation Technician / Installer, Backflow Prevention Specialist. Free, with nothing to fill in. If you would rather a recruiter ran the search, that is the Commercial Irrigation recruiting page.

Step 1 · Plan

What each commercial irrigation seat is, and what it pays.

Each band is labelled with where it comes from. A My Trade Talent band is mid-experience, built from our own engagement history, and moves with experience and region. A BLS band is the federal 10th to 90th percentile, national and unadjusted, used where we have not closed enough searches in the trade to publish our own.

Commercial Irrigation roles, pay bands and credentials

BLS 10th to 90th percentileEvery bar is drawn on one scale, $25,000 to $115,000.

  • Irrigation Technician / Installer

    BLS 10th to 90th percentile

    Installs, troubleshoots and services commercial irrigation: mainlines and laterals, valves and manifolds, heads and nozzles, controllers and sensors, and the wiring between them.

    Pay band $31,150 to $56,730 Federal figures: BLS Occupational Employment and Wage Statistics, May 2025, national, SOC 37-3011. The range is the 10th to 90th percentile and the median is $39,150. It is not adjusted for experience or region, and it is not a My Trade Talent band.
    Credentials that move an offer CIT (preferred)
  • Backflow Prevention Specialist

    BLS 10th to 90th percentile

    Tests, repairs and certifies backflow prevention assemblies under a state or water authority certification: annual testing with a calibrated gauge, repair and rebuild of RP and double-check assemblies, and the report filed with the purveyor.

    Pay band $44,150 to $108,420 Federal figures: BLS Occupational Employment and Wage Statistics, May 2025, national, SOC 47-2152. The range is the 10th to 90th percentile and the median is $63,800. It is not adjusted for experience or region, and it is not a My Trade Talent band.
    Credentials that move an offer Backflow Certification

We publish no commercial irrigation median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. The full distribution is in the Hiring Index.

Price the seat by experience and region in the salary calculator, and work out what leaving it open costs in the cost of vacancy calculator.

Step 3 · Interview

How to interview for each commercial irrigation role.

Everyone who applies will claim the experience. These are the questions that test it, the signals that separate a strong candidate from a plausible one, and the mistake each seat invites.

Irrigation Technician / Installer

BLS 10th to 90th percentile CIT (preferred)

Installs, troubleshoots and services commercial irrigation: mainlines and laterals, valves and manifolds, heads and nozzles, controllers and sensors, and the wiring between them. Most service calls are a wire fault, a valve, or a controller programmed by someone who has left.

Questions that find out

  1. A zone will not come on and the controller shows no fault. How do you trace it?

    A strong answer Splits it at the controller: puts the zone into manual and checks whether the controller is sending voltage to that station. If it is, the fault is in the field - the wire, a splice, or the solenoid - so they check resistance at the controller to see whether the circuit is open or shorted and work from there. If it is not, it is the controller output or the programme. Checks the master valve and the water supply first, because a zone that will not come on sometimes has no water.

    Follow up with What resistance reading would make you suspect the solenoid rather than the wire?

  2. How do you check that a zone is applying water evenly?

    A strong answer Runs a catch-can test rather than watching it: containers spread across the zone, run for a measured time, and compares what each caught to get the distribution uniformity. Looks at what the result points to - heads mismatched in type or nozzle, spacing that is not head to head, pressure too low or too high, tilted or sunken heads, or something blocking the throw. Fixes the cause rather than adding run time to the dry spots.

    Follow up with The dry spots are between heads. What does that tell you?

  3. Walk me through winterising a commercial system.

    A strong answer Shuts off and isolates the supply, drains what will drain, then blows out zone by zone at a pressure below the system's limit and a volume that will actually clear the laterals, keeping each zone running only as long as water is coming out so heads are not run dry. Opens the backflow test cocks and drains the assembly, protects it, and shuts down and drains the controller or sets it to off. Documents what was done.

    Follow up with Why is blowing out at too high a pressure worse than not blowing out at all?

  4. How do you handle a valve that will not close?

    A strong answer Works out whether it is electrical or mechanical: a solenoid still energised, a controller output stuck on, or a manual bleed left open all keep it electrically open, while debris under the diaphragm, a torn diaphragm or a blocked port keeps it mechanically open. Isolates and opens it rather than guessing. Knows a valve that will not close is running the water bill up every hour and treats it as urgent.

    Follow up with How do you tell an electrical stuck-on from a debris problem without digging?

  5. How do you find a wire fault without digging up the whole run?

    A strong answer Measures first - resistance to ground and between conductors to tell a short from an open - then uses a wire tracer or fault locator to walk the route rather than excavating hopefully. Checks the splices first, because that is where most faults are, and knows where splices are likely: at valve boxes, at changes of direction and anywhere somebody has worked since. Uses waterproof connectors on the repair.

    Follow up with Where are you most likely to find the fault before you dig anywhere?

  6. What is your approach to a head-to-head coverage problem on an existing system?

    A strong answer Measures the actual spacing and the pressure at the head before changing anything, because the usual cause is spacing designed for a higher pressure than the system delivers, or nozzles changed over the years. Fixes it properly - correct nozzles, pressure regulation, or adding heads - rather than by over-running the zone, which wastes water and still leaves dry patches. Explains the cost of the fix against the cost of the water.

    Follow up with Why does adding run time not fix poor coverage?

  7. How do you handle a system that is running up a water bill nobody can explain?

    A strong answer Starts at the meter: isolates the irrigation supply and watches the meter with everything off to see whether there is a continuous loss, which points at a mainline leak or a valve passing. If it only shows during watering, compares the programmed run times against what the controller is actually doing - overlapping programmes, a second start time nobody knows about, or manual watering left on. Walks the property during a cycle.

    Follow up with The meter moves with everything off. What are you looking for?

  8. How do you adjust a controller for a property with mixed sun and shade?

    A strong answer Treats the zones separately rather than running one schedule: shade zones need less and will stay wet, sun zones more, and slope zones need cycle-and-soak so water does not run off. Adjusts seasonally rather than setting it once, and uses the controller's percentage adjust rather than reprogramming every zone. Checks the plant material in each zone, since turf and beds have different needs on the same property.

    Follow up with What is cycle and soak for, and where do you use it?

  9. How do you perform a full system audit on a commercial property?

    A strong answer Runs every zone and walks it, recording head type, nozzle, condition, spacing and pressure, with catch-can tests on representative zones for uniformity. Checks the controller programme against what the landscape actually needs, the backflow assembly, the master valve and any flow sensor, and the mainline for leaks. Produces a report with prioritised repairs and the water each would save, rather than a list.

    Follow up with What do you measure during an audit that an owner can see the value of?

  10. What is your approach to a mainline break you cannot immediately locate?

    A strong answer Shuts the water off first and stops the loss, then narrows by isolation - closing section valves where they exist and watching the meter - rather than digging where the water surfaces, since water travels along the trench. Looks for the obvious causes: recent excavation, root damage, a vehicle over a shallow line, or freeze damage. Uses acoustic location where the property is large. Documents the repair and the depth.

    Follow up with Why is the wet spot usually not above the break?

  11. How do you handle a controller with no documentation or labelling?

    A strong answer Maps it rather than guessing: runs each station in turn and walks the property to see what comes on, recording zone by zone with the heads and area covered. Labels the controller as they go and leaves a map in it. Checks for stations wired but not used and for zones on the property with no station. Says this is an hour that pays for itself the first time anybody else works on the system.

    Follow up with What do you leave in the controller box when you are finished?

  12. What is your process for pressure testing after a repair?

    A strong answer Charges the line slowly to avoid a surge that will break something else, checks the repair under pressure before backfilling rather than after, and holds it long enough to see a slow leak. Flushes the line before putting heads or nozzles back, because debris from the repair will block them. Checks the zone's operating pressure at the furthest head afterwards to confirm nothing is restricted.

    Follow up with Why flush before you put the nozzles back?

  13. How do you deal with a zone that has mixed head types?

    A strong answer Knows mixed rotors and sprays on one zone cannot be balanced, because they apply water at very different rates, so one area is always over- or under-watered whatever the run time. Recommends separating them into their own zones or converting to matched precipitation nozzles. Explains to the owner why run-time adjustment will never fix it, and prices the fix against the water being wasted.

    Follow up with Why can a mixed zone never be scheduled correctly?

  14. What is your approach to a smart controller or weather-based schedule?

    A strong answer Sets it up properly rather than installing it and leaving the defaults: the right site data, soil type, slope, plant type, head type and precipitation rate per zone, and a sensible local weather source. Checks what it actually does over the first few weeks rather than assuming. Knows a smart controller with wrong zone data waters worse than a timer, and that most of them in the field were never configured.

    Follow up with What does a smart controller need to know about each zone to work?

  15. How do you handle a water restriction or ordinance on an account?

    A strong answer Finds out what the restriction actually says - days, times, exemptions for new plantings or for drip - and programmes to it rather than to habit, then tells the client what it means for the landscape. Documents compliance. Knows the fines and that the account holder carries them. Offers the things that help within the rules: checking uniformity, fixing leaks, and adjusting schedules rather than simply watering less.

    Follow up with What can you do for a landscape under a two-day restriction?

  16. What do you leave with the property manager after a service visit?

    A strong answer What was found, what was done and what was not, with the zones affected and photographs of anything that needs a decision, plus the controller settings if they were changed and any recommendation with a price. Writes it so somebody who is not an irrigation person can act on it. Says the visit report is how the next repair gets approved, and how the next technician does not start from nothing.

    Follow up with What in your report gets a repair approved?

What a strong candidate shows

  • Uses a wire tracker and a solenoid test rather than digging to find the fault
  • Knows head spacing and precipitation rate, not just which head fits
  • Has programmed smart controllers and understands what the sensors are actually doing

The mistake

The mistake this seat invites. Hiring landscape labourers into irrigation service. The troubleshooting is electrical and hydraulic diagnosis, and installation experience does not supply it.

Backflow Prevention Specialist

BLS 10th to 90th percentile Backflow Certification

Tests, repairs and certifies backflow prevention assemblies under a state or water authority certification: annual testing with a calibrated gauge, repair and rebuild of RP and double-check assemblies, and the report filed with the purveyor. The filing is the deliverable, and it is a legal one.

Questions that find out

  1. Which assembly is required on a high-hazard connection, and why not a double check?

    A strong answer Knows a high-hazard or health-hazard cross connection requires a reduced pressure principle assembly, and why: a double check relies on two check valves holding, with no way to prove a failure, while a reduced pressure assembly has a relief valve that dumps to atmosphere the moment the differential drops, so a failure is visible rather than silent. Knows irrigation with chemical injection is high hazard regardless of what is installed now.

    Follow up with What makes an irrigation connection high hazard rather than low?

  2. Walk me through a reduced pressure assembly test and what a failure looks like.

    A strong answer Describes each check in order and what it proves: the relief valve opening differential, then check valve one holding against the required differential, then check valve two holding, with the test cocks and the gauge hoses connected correctly for each step and the assembly isolated. Names the failures: relief opening below the minimum, a check that will not hold, continuous discharge, or a shut-off valve that will not seal, which invalidates the test.

    Follow up with What does continuous discharge from the relief port tell you?

  3. When was your gauge last calibrated and who holds the record?

    A strong answer Knows the date and the interval their jurisdiction requires, usually annually, who calibrated it and where the certificate is, because a test performed with an out-of-calibration gauge is void and may have to be redone at their cost. Checks the gauge against a known reference between calibrations. Says a tester who cannot answer this question has reports that will not stand up.

    Follow up with What happens to the reports you filed with an out-of-calibration gauge?

  4. How do you handle an assembly that has never been tested and has no records?

    A strong answer Starts by establishing what it is and whether it is the right assembly for the hazard, not just whether it passes - an untested assembly is often also the wrong type or wrongly installed. Checks the model is approved in that jurisdiction, the installation orientation and clearances, and then tests it. Reports the absence of history to the water purveyor as well as the owner, because the account may not be on their register at all.

    Follow up with What do you check before you decide whether it is even testable?

  5. What do you do when an assembly fails and the building cannot lose water?

    A strong answer Does not pass it. Reports the failure to the owner and the purveyor as required, and works the practical path: repair in place where the parts are to hand, a planned short shutdown, or isolating the irrigation branch rather than the building supply, since an irrigation assembly usually serves only the irrigation. Knows the purveyor can require the service be shut off and that the timeline is theirs, not the building's.

    Follow up with Can you isolate just the irrigation rather than the building?

  6. How do you handle a report that the jurisdiction rejects?

    A strong answer Finds out exactly why - a form version, a missing field, a gauge calibration date, an unapproved assembly, a tester certification issue, or a timing rule - and corrects it rather than resubmitting the same thing. Keeps their own copy and the field notes so the retest is defensible. Builds a relationship with the purveyor's cross-connection control person, because the rules vary and they are the ones who apply them.

    Follow up with What gets reports rejected most often in your area?

  7. What is your process for repair versus replacement on a failed assembly?

    A strong answer Repairs where the failure is a serviceable part - rubber, springs, seats - with the manufacturer's kit for that model, and retests afterwards, because a repair is not complete until it passes. Replaces where the body is corroded or damaged, where parts are no longer available, or where the assembly is not the right type or is no longer approved. Prices both honestly rather than defaulting to replacement.

    Follow up with What makes you say replace rather than rebuild?

  8. How do you verify an assembly is installed at the right point and orientation?

    A strong answer Checks it is at the point the code requires - immediately downstream of the service and upstream of any branch or injection point, so nothing is unprotected - and that the orientation and clearances match the approval: the right way up, the required height above grade or flood level, accessible for testing and repair, and with adequate drainage for a relief discharge. Reports an assembly that is correct but installed wrongly.

    Follow up with Why does the height above grade matter on a reduced pressure assembly?

  9. How do you handle a test on an assembly you cannot safely isolate?

    A strong answer Does not test it in a way that puts the system or themselves at risk. Establishes why - a failed shut-off valve, no downstream isolation, or an assembly serving something that cannot be interrupted - and reports it as a deficiency, because an assembly whose shut-offs do not hold cannot be properly tested anyway. Arranges the repair or the shutdown rather than recording a test they could not perform correctly.

    Follow up with Can you certify an assembly whose shut-off valve will not hold?

  10. How do you handle a pressure vacuum breaker or an atmospheric vacuum breaker differently?

    A strong answer Knows these protect only against backsiphonage, not backpressure, and that an atmospheric vacuum breaker cannot be under continuous pressure or downstream of a shut-off, which rules it out for most irrigation. Knows a pressure vacuum breaker must be installed above the highest downstream outlet by the required height, and tests the air inlet and the check rather than applying the reduced pressure procedure to it.

    Follow up with Why can an atmospheric vacuum breaker not be used on a typical irrigation zone valve?

  11. How do you deal with a thermal expansion issue after a repair?

    A strong answer Knows that putting a working backflow assembly on a service creates a closed system, so water heated downstream has nowhere to expand and pressure rises, which shows up as relief valves weeping or water heaters discharging. Recognises it rather than blaming the assembly, and raises the fix - an expansion tank or a pressure-reducing valve with bypass - as the plumbing work it is, for somebody licensed to do it.

    Follow up with A water heater relief starts weeping after your install. What happened?

  12. What is your approach to a property owner who wants to delay a required test?

    A strong answer Explains that the deadline is the purveyor's, not theirs, and what happens when it passes - a notice, a fine, or the service being shut off - which is usually enough. Offers a time that works. Does not backdate a test or test one assembly and report another, whatever the pressure. Says the certification is the asset and nobody gets it back after a falsified report.

    Follow up with What have you been asked to do that you would lose your certification for?

  13. How do you handle an assembly installed below grade?

    A strong answer Knows a reduced pressure assembly cannot be installed below grade or in a pit where it could be submerged, because the relief port must discharge to atmosphere and a flooded vault makes the protection useless and creates a cross connection of its own. Reports it as a violation requiring relocation rather than testing it and moving on. Knows a double check may be permitted below grade where the hazard level allows.

    Follow up with Why can a reduced pressure assembly not go in a vault?

  14. What is your approach to a property with multiple assemblies and one shutdown window?

    A strong answer Plans the route and the sequence before the day, knows which assemblies share a supply and which can be done independently, and has the common repair parts on the van so a failure does not mean a second shutdown. Tests the critical or difficult ones first while the window is fresh. Tells the property what will be off and when, and reports the failures the same day so the repairs can be scheduled rather than discovered.

    Follow up with What do you carry so a failure does not cost a second visit?

  15. How do you explain a failure to a property manager who thinks it is fine?

    A strong answer Explains what the test actually measures and what the failure means in plain terms - that the device protecting the drinking water will not hold if the pressure reverses - rather than quoting a differential reading. Shows them the discharge or the reading. Puts the regulatory consequence next to it, since that is usually what moves the decision, and gives them a price and a date rather than only bad news.

    Follow up with How do you explain a check valve failure to somebody with no plumbing background?

  16. What do you do when the jurisdiction and the manufacturer disagree?

    A strong answer Follows the jurisdiction, because the purveyor's rules govern what is approved and how it is tested, and documents the conflict rather than quietly choosing. Goes back to the purveyor's cross-connection control officer with the manufacturer's literature and asks for a written position. Knows the approvals list in their state may not include an assembly the manufacturer sells, and that the list wins.

    Follow up with Whose procedure do you follow on the day, and what do you do afterwards?

What a strong candidate shows

  • Certification current for the jurisdiction, with gauge calibration in date
  • Knows which assembly type is required for which hazard level
  • Describes the filing and recordkeeping as part of the job rather than paperwork after it

The mistake

The mistake this seat invites. Assuming an irrigation technician can test. Backflow certification is separate, jurisdiction-specific, and the test is only valid if the tester and the gauge are both current.

Every role in every trade is in the interview question bank.

Step 4 · Offer

What can kill a commercial irrigation offer before day one.

The things that end an accepted offer between the yes and the start date, specific to this trade and each sourced.

  • A WaterSense-labelled certification is specified, and CIT is not one

    EPA labels particular programs, and the nationwide labelled set is CIC, CLIA, CGIA and CID in its landscape and turf specialties. The most common field credential, CIT, is not on that list. A conservation scope written to require a WaterSense professional will not accept a CIT, and the hire cannot be billed to the contract.

    Source: www.epa.gov/watersense/professional-certification-0
  • Backflow tester certification does not travel, and re-earning it is slow

    Authority to test is issued locally. Texas requires its own licence, gated on two years of qualifying experience, a 40-hour course and a state exam, then 24 hours of continuing education every three years. An employer who hired someone to do their backflow testing can find they cannot for a year or more.

    Source: www.tceq.texas.gov/licensing/licenses/bpatlic
  • The season is shorter than the salary implies

    BLS notes that some of this work is seasonal and that hours run longer in spring, summer and autumn. Irrigation peaks sharply at spring activation and autumn winterisation. In a cold-winter metro, candidates weigh the annual figure against the actual working season and leave for a twelve-month employer.

    Source: www.bls.gov/ooh/building-and-grounds-cleaning/grounds-maintenance-workers.htm
  • The role quietly needs a pesticide licence

    Irrigation technicians at full-service landscape firms are often expected to cover chemical applications. BLS notes that most states license workers who apply pesticides, and that fertiliser rules vary. Because it is state-issued it does not move with a relocating hire, and the requirement is frequently missing from the posting.

    Source: www.bls.gov/ooh/building-and-grounds-cleaning/grounds-maintenance-workers.htm

Add up the whole offer, not just the base, in the offer calculator.

Step 5 · Onboard

Credentials to verify before the first day.

Each names the body that issues it and links to the issuer's own page or a .gov page. Researched 2026-09-23; re-read the source before relying on an entry.

  • Certified Irrigation Technician (CIT)

    Irrigation Association

    The core field credential, for people who install, maintain and repair irrigation systems. The exam runs three hours and 100 questions across irrigation principles, basic electrical and basic hydraulics. Six months or 1,000 hours of field experience is suggested beforehand rather than required.

    Source: www.irrigation.org/ia/Certification/CIT.aspx
  • Certified Irrigation Contractor (CIC)

    Irrigation Association

    For those running installation and maintenance projects, and the one credential that has been written into state law: New Jersey requires the CIC exam for its state certification. It is also labelled by EPA WaterSense, which matters on conservation-funded work.

    Source: www.irrigation.org/ia/Certification/Landscape-Certifications.aspx
  • Certified Landscape Irrigation Auditor (CLIA) and Certified Irrigation Designer (CID)

    Irrigation Association

    CLIA holders gather water-use data and test systems; CID holders produce specifications and design drawings. Both are WaterSense labelled, which is what unlocks municipal and commercial water-conservation and rebate-funded work.

    Source: www.epa.gov/watersense/professional-certification-0
  • Backflow prevention assembly tester certification, ASSE 5110

    ASSE International sets the standard; the permission to test is issued or accepted by the state or the local water purveyor

    Almost every commercial irrigation system ties into a potable main, and its backflow assembly must be tested by a certified tester. A crew without one subcontracts the work. The ASSE credential recertifies on a three-year cycle.

    Source: asse-plumbing.org/personnel-certification/backflow-prevention

State licensing for 39 states (Alabama, Arkansas, Arizona, California, Colorado, Connecticut, District of Columbia, Florida, Georgia, Hawaii, Iowa, Idaho, Illinois, Indiana, Kansas, Kentucky, Louisiana, Massachusetts, Maryland, Michigan, Minnesota, Missouri, North Carolina, Nebraska, New Mexico, Nevada, New York, Ohio, Oklahoma, Oregon, Pennsylvania, Rhode Island, South Carolina, Tennessee, Texas, Utah, Virginia, Washington and Wisconsin) is in the credential check, each with the agency and its source. Open the credential check for Commercial Irrigation.

Step 6 · Retain

Where each role goes next.

Candidates ask about the next step in the first conversation, and an employer who can answer it keeps the people who had other options. Say it on day one, too.

  • Irrigation Technician / Installer

    Technicians move to lead, service manager, or into design and water management auditing.

  • Backflow Prevention Specialist

    Certified testers add cross-connection control specialist credentials and move into compliance and purveyor-side work.

Questions

Hiring for commercial irrigation: questions.

What interview questions should I ask when hiring for commercial irrigation?

My Trade Talent's Commercial Irrigation hiring kit carries 16 technical questions for each of its 2 roles. For the Irrigation Technician / Installer, the first is: "A zone will not come on and the controller shows no fault. How do you trace it?" The full set, with the signals that separate a strong answer, is on this page and in the interview question bank.

What credentials should I verify when hiring in commercial irrigation?

The Commercial Irrigation kit lists 4, each with its issuing body and a primary source: Certified Irrigation Technician (CIT), Certified Irrigation Contractor (CIC), Certified Landscape Irrigation Auditor (CLIA) and Certified Irrigation Designer (CID) and Backflow prevention assembly tester certification, ASSE 5110.

What can kill a commercial irrigation job offer before the start date?

The Commercial Irrigation kit names 4, each sourced: A WaterSense-labelled certification is specified, and CIT is not one, Backflow tester certification does not travel, and re-earning it is slow, The season is shorter than the salary implies and The role quietly needs a pesticide licence.

What do commercial irrigation roles pay?

Irrigation Technician / Installer: $31,150 to $56,730 (BLS 10th to 90th percentile); Backflow Prevention Specialist: $44,150 to $108,420 (BLS 10th to 90th percentile). My Trade Talent bands are mid-experience and move with experience and region; BLS figures are national and unadjusted.

How long does it take to hire in commercial irrigation?

We publish no commercial irrigation median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.

Trade Talk A monthly hiring brief for commercial trades employers

What changed in your trade this month, and what to do about it.

One email a month, and only one. We write a separate issue for every trade we recruit in, so you get yours - not a round-up with your trade buried in paragraph nine. Every issue is written for the person actually doing the hiring.

  • Where wages moved in your trade, by market, and what that does to your next offer
  • How long roles like yours are taking to fill, and where it is getting worse
  • Interview and screening tactics that are landing candidates this month
  • What contractors competing for the same people are doing differently

Built on federal wage data, our own closed searches, and what we hear on the desk every week. Written for employers, not candidates. No pitch, no filler, one click to leave.

Pick your trade. That is the one issue you get, once a month.

One email a month. Your trade and your address, nothing else - we do not sell either, and you can unsubscribe from the bottom of any issue. Read this month's issue for your trade first →