Journeyman Electrician (Commercial)
Installs and troubleshoots commercial power and lighting under a licence: branch circuits, panels, feeders, conduit, gear and the terminations that connect them. Reads the drawings, lays out the work, and on most jobs directs an apprentice.
Questions that find out
-
How do you size a feeder for a 200A three-phase panel, and what in the code drives it?
A strong answer Starts from the calculated load rather than the panel rating, then conductor ampacity with ambient correction and adjustment for current-carrying conductors in the raceway, limited by the termination temperature rating at both ends - which is the step most people skip. Then overcurrent protection, the equipment grounding conductor, and voltage drop on a long run. Naming the chain matters more than reciting article numbers.
Follow up with Why can the right conductor still be the wrong one once you look at the lugs?
-
Walk me through your lockout-tagout sequence on a 480V panel.
A strong answer Notify who is affected, identify every source rather than the obvious one, shut down in order, open the disconnect, their own lock and their own tag, release stored energy including a VFD DC bus, then verify dead with a correctly rated meter proved on a known live source before and after. Treats the verification itself as energised work and dresses for it.
Follow up with What stored energy is still in that panel after you open the disconnect?
-
What is the difference in how you treat a grounded conductor and an equipment grounding conductor on a sub-panel?
A strong answer Bonded together only at the service. At a sub-panel the neutral sits on an isolated bar, the grounding conductors on a bonded bar, and the bonding screw or strap comes out. Can say why rather than just what: bonding them downstream puts normal neutral current onto the grounding conductor and the raceway, which is a shock path and a nuisance-trip source.
Follow up with What goes wrong in the building if someone leaves the bonding screw in?
-
How do you size a feeder, and which code sections are you working from?
A strong answer Should answer consistently with the first feeder question, which is partly why it is asked twice in different words. Load calculation, ampacity table with correction and adjustment factors, termination temperature limits, overcurrent protection, grounding conductor sizing, voltage drop. Someone working from memory of one job will drift between the two answers.
Follow up with Which of those steps do you see missed most often on drawings you are handed?
-
A three-phase motor hums but will not start. Walk me through your troubleshooting.
A strong answer Single-phasing is the first thought and they say so: all three legs measured at the motor rather than at the panel, fuses or a breaker pole open, contactor contacts, overload, a burned or loose lug, and voltage imbalance. Then mechanical - locked rotor, a seized load, a brake that has not released - with amps compared against the nameplate. Does not just keep resetting it.
Follow up with How much voltage imbalance is too much, and what does it do to the motor?
-
What is your process for proving a circuit dead before you put hands on it?
A strong answer Live, dead, live on a known source with a meter rated for the voltage and the category. Every combination, phase to phase and phase to ground, not just the one they expect. Treats the circuit as live until the meter says otherwise and treats the testing itself as energised work.
Follow up with What do you do if your meter reads dead but something about the job does not feel right?
-
When do you run MC cable rather than pipe and wire on a commercial fit-out, and who makes that call?
A strong answer The specification and the inspector decide, not the installer. MC where it is permitted and the ceiling is accessible and speed matters; pipe where the environment, mechanical protection, or future changes call for it. The important half of the answer is the second half: a change from the specified method is an RFI or a documented substitution, not a field decision.
Follow up with What do you do when the general contractor tells you to switch to save money?
-
Tell me about a panel schedule you found wrong in the field and what you did about it.
A strong answer Traced and verified rather than trusting the sticker, corrected the whole schedule rather than only the circuit they came for, left a typed schedule behind, and told whoever owns the drawings. The weak version of this story ends with them finding the right breaker and moving on.
Follow up with How long did it take, and who paid for it?
-
How do you lay out and bend a conduit run so it passes inspection and stays serviceable?
A strong answer Plans the route before bending: accessibility, support spacing, where the pull points go, staying within the allowed total bend between them, correct radius, fill calculated rather than eyeballed, expansion where the structure needs it, and room left for the next trade and the next change. Neat parallel runs are a by-product of planning, not the goal.
Follow up with Where do you put your pull points, and how do you decide?
-
What is your approach to terminating large conductors in a switchgear lineup?
A strong answer The right lug for the conductor material and size, conductor cleaned and prepared, antioxidant where it belongs, no sharp bend at the lug, phase rotation and barriers right - and torqued to the manufacturer specification with a calibrated wrench, recorded. Skipped torque is one of the great quiet causes of switchgear failure and they should say so without prompting.
Follow up with How do you know your torque wrench is telling you the truth?
-
A breaker trips at night and never during the day. How do you chase it?
A strong answer Treats it as a load question before a breaker question: what runs at night and not in the day - exterior lighting, heaters, irrigation, defrost, a timer or contactor picking up. Considers condensation and moisture causing a ground fault overnight. Puts a recording meter or logger on it rather than guessing, and reads the trip type for what it says about the cause.
Follow up with What would you put on it overnight, and what would you be looking for in the morning?
-
What do you check before energising a new panel?
A strong answer Insulation resistance tested, terminations torqued and documented, phase rotation confirmed, conductors matched to breakers and to the schedule, bonding and grounding verified, unused openings closed, no debris or tools left inside, covers on, and the people nearby told before it goes live.
Follow up with What would you do if the insulation test came back lower than you expected but not zero?
-
The building will not allow a shutdown. How do you handle work near energised equipment?
A strong answer Pushes back first, and knows the ground to push back on: energised work needs a real justification, and inconvenient is not the same as infeasible. Offers a window at night or a weekend. If it genuinely has to be live, then a permit, the boundaries worked out, protection matched to the incident energy, insulated tools, barriers and a second person.
Follow up with What is the argument you make to the building manager, in their language?
-
Walk me through laying out lighting from a reflected ceiling plan.
A strong answer Reads the ceiling grid off the plan and sets out from finished surfaces rather than framing, coordinates with ductwork, sprinkler and structure before a single box goes up, checks fixture types against the schedule rather than assuming, and confirms switching, zoning and controls. Knows which fixtures need independent support rather than hanging off the grid.
Follow up with Who do you talk to before you set the first box?
-
What is your process for labelling and as-builts?
A strong answer Labels as the work goes in rather than at the end, typed panel schedules, circuit identification at the devices, and drawings marked up daily rather than reconstructed from memory in the last week. Records concealed and underground work before it is covered, because after that it is archaeology.
Follow up with What gets recorded before the ceiling goes up?
-
What would make you refuse to do a piece of work?
A strong answer Something specific rather than a general commitment to safety. Energised work with no justification or no protection, a missing permit or inspection, being asked to conceal something that will not pass, materials that do not match the specification, work outside what their licence covers, or being too tired to be safe. Says who they would tell and what they would do next.
Follow up with Tell me about a time you said no.
What a strong candidate shows
- Conduit bending described as routine - offsets, saddles, large-diameter rigid
- Has worked live-adjacent under NFPA 70E and can describe the boundary rules
- Commercial and industrial service sizes rather than residential panel swaps
The mistake
The mistake this seat invites. Taking a state licence as proof of commercial capability. Licensing rules vary by state and many journeyman licences are earned on residential hours.