Skip to main content
Annual review

Commercial Electrical PM Performance Review Template

Commercial Electrical

5 weighted sections, 25 criteria, on a scale with written anchors. The criteria are things a manager can observe on a job rather than adjectives about a person, which is the difference between a review somebody can prepare for and one they can only receive.

5weighted sections
25observable criteria
1 to 5anchored scale, every point written out
Take this away as a Word document The same instrument with the scoring columns, a computed overall score with bands, development goals and a sign-off block. The first download asks for your name, company, work email and phone; after that every document here downloads without a form.
Download .docx

The scale

RatingWhat it means
1Does not meet. Specific, repeated and known to the person.
2Below the seat. Needs supervision the role is not supposed to need.
3Meets the seat. This is the standard, not the consolation.
4Above the seat. Others are learning from how they do it.
5Rare. Changes how the company does the work.

A 3 is the standard the seat was hired against, not a disappointment. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing.

How the weighted score works

Each section rating is multiplied by that section's weight; the five results are added and divided by 100. Worked through with this role's own weightings, for an illustrative Commercial Electrical PM who is strong on the trade itself, standard on output and safety, and below the seat on communication:

SectionWeightExample ratingWeighted
A. Technical skill and execution25%41.00
B. Productivity and measured results20%30.60
C. Safety and compliance15%30.45
D. Communication and customer handling25%20.50
E. Reliability, teamwork and development15%30.45
Overall100% 3.00

3.00 on a scale where 3.00 is the seat performed to standard. The total is the least interesting number in that table. A 2 in one section can sit inside a total that reads as unremarkable, which is exactly why the section scores go on the form and the conversation happens section by section rather than about an average. The ratings above are an illustration, not a finding about anyone.

A. Technical skill and execution 25%

CriterionWhat good looks like
Buyout qualitySubcontracts and purchase orders issued this period covered the full specified scope, with no gap discovered later that required an unbudgeted purchase.
Submittal and procurement managementSubmittals were issued and gear released for fabrication early enough that no job this period waited on equipment the project manager controlled.
Change order pricingPriced changes with labor, material and markup detail that withstood the general contractor's review, with no approved change later found to be underpriced.
Document and drawing controlThe field was working from current drawings and approved submittals on every site visit; no installed work was built from a superseded sheet.
Technical judgment on scopeIdentified scope and code issues in submittals and requests for information before installation, documented in the project log.

B. Productivity and measured results 20%

CriterionWhat good looks like
Margin performanceProjects completed this period met or exceeded the margin carried at award, with variance explained by documented events.
Forecast accuracyMonthly cost-to-complete forecasts stayed within the company's tolerance of final actual cost on closed jobs.
Billing and collectionsEvery billing in the period was submitted on the owner's cutoff date, and days sales outstanding on the portfolio met target.
Manpower forecastingWeekly manpower forecasts given to the superintendent matched actual crew needs closely enough to avoid idle labor or emergency hiring.
Portfolio loadCarried the assigned project volume without letting submittals, billings or closeouts age past their deadlines.

C. Safety and compliance 15%

CriterionWhat good looks like
Contract and insurance complianceSubcontracts, certificates of insurance, bonds and lien waivers were current on every active job, verified at audit.
Labor complianceCertified payroll, prevailing wage and apprenticeship requirements were met and filed on time on all applicable projects.
Support for field safetyFunded and scheduled the lifts, PPE and access the field safety plan required, with no field safety gap caused by a procurement delay.
Site conductFollowed site PPE and badging rules on every visit, with no access or safety violation recorded.
Permit and inspection supportPermits, special inspections and third-party testing were arranged before they were needed on every project this period.

D. Communication and customer handling 25%

CriterionWhat good looks like
Owner and general contractor relationshipsClients on this period's jobs continue to invite the company to negotiate or bid, with no relationship escalation attributable to project management.
Early notice of problemsGear delays, scope disputes and schedule risks were communicated in writing before they affected the schedule, with dated correspondence to show it.
Field partnershipForemen report getting the drawings, material dates and manpower answers they needed, without having to escalate to operations.
Meeting and documentation disciplineCommitments made in coordination and owner meetings were recorded and distributed, and later disputes were resolved from those records.
Change negotiationNegotiated changes to approval without souring the client relationship, evidenced by approved change orders and continued award of work.

E. Reliability, teamwork and development 15%

CriterionWhat good looks like
Commitment reliabilityMet the dates committed for submittals, pricing, billings and closeout, or renegotiated them in advance.
Closeout follow-throughClosed out completed jobs within the target window, including as-builts, manuals, warranties and final billing.
Team supportBacked up another project manager or estimator during absence or a bid push without letting own jobs slip.
Feedback to estimatingReturned actual production rates, gear pricing and lessons learned to the estimating team on each closed job.
DevelopmentCompleted training in a relevant area such as contract terms, scheduling, code changes or the company's systems during the year.

What this seat is measured on day to day

MeasureWhat it captures
Gross margin at completion against estimateFinal project margin compared with the margin carried at award, by job
Buyout varianceSubcontract and material buyout against the amounts carried in the estimate
Gear and submittal cycle timeDays from award to submittal issue, approval and release for fabrication, against the required-on-site date
Change order cycleDays from identification to pricing, submission and approval, and percentage of field changes billed
Billing and cashOn-time billing submission, days sales outstanding, and aged retention by job
Forecast accuracyVariance between the monthly cost-to-complete forecast and actual final cost
Closeout completionDays from substantial completion to accepted closeout documents and final billing

The same measures the job description for this role is written against, so the document you hire against and the document you rate against are measuring one thing.

Where this person goes next

Project managers move to senior PM and operations manager, or into preconstruction.

The review is the natural place for this conversation and the wrong place to have it for the first time. Someone hearing about the next seat in the same meeting as their rating hears it as consolation. Say it in advance, then use the review to say how far along they are.

The pay conversation

$95,000 to $155,000 My Trade Talent band

My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.

A review that produces a number and no pay decision is a review the employee will discount next year. One that produces a pay decision made in the same half hour is usually a decision made on the last thing discussed. Know where the person sits in the band before the meeting, and treat the rating as evidence for a decision you take afterwards.

Nothing here sets pay. What a rating is worth depends on your margins, your bands and your state, and those are yours.

What it costs if this one leaves

My Trade Talent's median commercial electrical hire took 30 days across 11 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.

Worth knowing before the meeting rather than after it. The question a retention decision actually turns on is not whether a raise is deserved but what the seat costs empty for that long, and the calculator will put a figure on it for your billing rate.

Before you use it

Move the weightings to match how your business makes money, and move them before the review rather than after you have seen the scores. The split here is a starting point, not a judgement about your company.

Against every criterion, write the job, the date or the customer that evidences it. A criterion with nothing written beside it has not been met, however well the person is getting on, because you are about to make a decision and an impression is not evidence.

What follows from the result is yours. Pay, promotion and a development plan depend on your margins, your bands and your state, and nothing here sets them.

Questions employers ask about reviewing this role

How do you score an annual review for a Commercial Electrical PM?

5 sections, weighted to 25%, 20%, 15%, 25%, 15% in that order, each rated 1 to 5 against written anchors. Multiply each section rating by its weight, add the five results and divide by 100; the worked example on this page does it in full. A 3.00 is the seat performed to the standard it was hired against.

What should a rating of 3 mean?

Meets the seat. It is the standard, not the consolation. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing and defends nothing if the decision is ever questioned.

How many criteria does this review cover?

25 across 5 sections, all of them things a manager can observe on a job rather than adjectives about a person. Each one has what good looks like written out beside it, which is the difference between a review somebody can prepare for and one they can only receive.

Should the review set pay?

Not by itself, and nothing here does. The instrument tells you how the work was performed against the seat. What follows - a raise, a promotion, a development plan or none of them - depends on your margins, your bands and your state. For reference, the band for this role is $95,000 to $155,000.

What do I do with a 2 in one section?

Name the job, the date or the customer that evidences it, say what meeting the seat would look like instead, and put a date on when you will look again. A 2 with no evidence beside it is an impression, and an impression is not something you can ask someone to improve. A 2 that sits inside an acceptable overall total is also the most common thing a single summary number hides, which is why the section scores go on the form.

Can I change the weightings?

Yes, and you should if they do not match how your business makes money. Change them before the review rather than after you have seen the scores, and change them for the seat rather than the person. The split here is a starting point.

What is the next step up from Commercial Electrical PM?

Project managers move to senior PM and operations manager, or into preconstruction.

What does it cost if a Commercial Electrical PM leaves?

My Trade Talent's median commercial electrical hire took 30 days across 11 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. That is the refill clock; the cost of the vacancy runs alongside it from the day the seat empties.

Trade Talk A monthly hiring brief for commercial trades employers

What changed in your trade this month, and what to do about it.

One email a month, and only one. We write a separate issue for every trade we recruit in, so you get yours - not a round-up with your trade buried in paragraph nine. Every issue is written for the person actually doing the hiring.

  • Where wages moved in your trade, by market, and what that does to your next offer
  • How long roles like yours are taking to fill, and where it is getting worse
  • Interview and screening tactics that are landing candidates this month
  • What contractors competing for the same people are doing differently

Built on federal wage data, our own closed searches, and what we hear on the desk every week. Written for employers, not candidates. No pitch, no filler, one click to leave.

Pick your trade. That is the one issue you get, once a month.

One email a month. Your trade and your address, nothing else - we do not sell either, and you can unsubscribe from the bottom of any issue. Read this month's issue for your trade first →