Commercial Electrical PM Job Description
Commercial Electrical
The Commercial Electrical Project Manager owns electrical projects commercially: buyout, submittals, gear procurement, manpower forecasting with the field, change orders, billing and margin. The role turns an awarded estimate into a bought, scheduled and documented job, and reports the forecast the company's cash and backlog depend on. Because switchgear and panel lead times set the critical path on most commercial jobs, procurement is the defining constraint of the seat.
What this seat pays
My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.
Pay, location and the date prepared are blank in the Word version on purpose. They depend on your market and your margins, and a template that guesses at them is worse than one that leaves them to you. The figure above is here so the guess is at least anchored.
The seat
| Reports to | Director of Operations |
| Direct reports | None directly (may supervise a project engineer or assistant project manager; directs foremen through the field) |
| FLSA status | Typically exempt — confirm with counsel |
| Trade | Commercial Electrical |
| Pay band | $95,000 to $155,000 — My Trade Talent band |
Where the role goes next. Project managers move to senior PM and operations manager, or into preconstruction.
Essential duties (15)
- Take over the awarded estimate in a turnover meeting, confirm the assumptions and the labor budget, and build the job cost structure in the accounting system.
- Buy out the job against the estimate: subcontract fire alarm, testing, trenching and specialty scopes, and lock material pricing with distributors.
- Prepare, log and submit electrical submittals, product data and shop drawings, and drive approval dates that protect the gear release schedule.
- Order switchgear, switchboards, panelboards, transformers and lighting packages, release for fabrication on approved submittals, and track factory build and ship dates weekly.
- Maintain a procurement log with lead times, required-on-site dates and float, and escalate a slipping gear date to the general contractor in writing before it hits the schedule.
- Build and update the manpower forecast with the foreman and general superintendent, by week and by phase, against the labor budget.
- Price and submit change orders with labor, material and markup detail, and track them from pricing through approval to inclusion in the billing.
- Write and submit requests for information, track responses, and distribute approved answers and revised drawings to the field so crews are not building from superseded sheets.
- Prepare monthly progress billings and schedule of values updates, confirm quantities with the foreman, and submit on the owner's billing calendar with required lien waivers and certified payroll.
- Review job cost weekly, update cost-to-complete and margin forecast monthly, and explain variance against the estimate in the work-in-progress review.
- Chase collections with the general contractor, track retention, and resolve billing disputes before they age past terms.
- Attend owner, architect and contractor meetings, maintain the electrical portion of the schedule, and document commitments in meeting notes.
- Manage rental equipment, lifts and temporary power on the job commercially, and release them when the field no longer needs them.
- Run closeout: as-builts, operation and maintenance manuals, warranty letters, spare parts, training sessions, final inspection and punch completion.
- Close the job financially, document final cost against the estimate and lessons learned, and return production rates and gear pricing to the estimating team.
Qualifications
- Five years of commercial electrical experience, including three managing electrical projects commercially
- Demonstrated command of electrical submittals, gear procurement and lead time management on commercial projects
- Ability to read electrical construction documents, one-line diagrams and specifications and to price changes from them
- Experience building and defending a monthly cost-to-complete and margin forecast
- Experience preparing progress billings, schedules of values, lien waivers and change orders
- Working knowledge of the adopted National Electrical Code edition sufficient to evaluate scope and submittals
- Valid driver's license and the ability to visit active job sites regularly
- Ability to walk active construction sites, including ladders, stairs and unfinished floors
- Field background as a journeyman or foreman, or a construction management degree
- Experience with healthcare, data center, higher education or other long-lead, heavily inspected work
- Experience managing multiple concurrent projects with a combined contract value typical of the company's backlog
- Proficiency with Accubid, Procore, Viewpoint, Sage or similar estimating, project and accounting platforms
- Experience with public work, prevailing wage, certified payroll and bonded contracts
- Experience negotiating subcontracts and purchase orders with terms, not just price
- OSHA 30-hour Construction card
The line between these two columns is the one that costs you candidates. Everything in the preferred column that gets written into a posting as a requirement removes people who could do the job, and in a trade with a shortage that is a self-inflicted wound.
Credentials, and who verifies them
| Credential | Status | Verify with |
|---|---|---|
| Valid driver's license | Required | State motor vehicle record check |
| OSHA 30-hour Construction | Preferred | Card number and authorized trainer |
| Journeyman or master electrician license | Preferred | State or municipal electrical licensing board |
| Degree in construction management, electrical engineering or a related field | Preferred | Transcript or registrar verification |
| Project management certification such as PMP or CMIT | Preferred | Certifying body verification |
Verify before an offer rather than after. A credential taken on trust at offer is the most expensive line on this page. We track commercial electrical licensing in 39 states; which of them applies depends on where the work is, not where the company is.
Physical demands
| Activity | Frequency |
|---|---|
| Sitting at a workstation managing submittals, procurement and cost reports | Constant (over 2/3 of shift) |
| Repetitive keyboard and mouse use | Constant (over 2/3 of shift) |
| Close vision reading drawings, submittals, schedules and cost reports | Constant (over 2/3 of shift) |
| Speaking on calls and in owner, contractor and vendor meetings | Frequent (1/3 to 2/3 of shift) |
| Driving between the office, job sites and vendor facilities | Frequent (1/3 to 2/3 of shift) |
| Walking active job sites on uneven ground and unfinished floors | Occasional (under 1/3 of shift) |
| Standing during site walks, coordination meetings and gear deliveries | Occasional (under 1/3 of shift) |
| Climbing ladders and stair towers during site visits | Occasional (under 1/3 of shift) |
| Lifting and carrying up to 25 pounds, such as plan sets and manuals | Occasional (under 1/3 of shift) |
| Exposure to outdoor weather, dust and noise on site visits | Occasional (under 1/3 of shift) |
| Working extended hours around billing cutoffs, gear releases and turnover | Occasional (under 1/3 of shift) |
| Kneeling or crouching to inspect installed work or equipment pads | Rarely |
This is the section a reasonable accommodation decision actually turns on, which is why it is role specific rather than copied across a trade. An estimator sits and walks sites; a screed operator stands beside hot asphalt all day.
Work environment
The project manager works primarily from an office or job trailer with document, procurement and accounting systems, and visits active commercial sites several times a week. Site conditions include dust, noise, weather, incomplete lighting and energized equipment during tie-ins. The calendar is set by billing cutoffs, submittal and gear release dates, coordination meetings and turnover. Gear delays, failed inspections and shutdown windows create occasional evening and weekend work.
Tools and equipment
The employer provides a laptop, phone, vehicle or allowance, estimating, project management and accounting software, document control and drawing markup licenses, printing and plotting, and site PPE including hard hat, vest, glasses and hearing protection. The project manager is expected to own work boots suitable for active sites and appropriate site clothing.
How performance is measured
| Measure | What it captures |
|---|---|
| Gross margin at completion against estimate | Final project margin compared with the margin carried at award, by job |
| Buyout variance | Subcontract and material buyout against the amounts carried in the estimate |
| Gear and submittal cycle time | Days from award to submittal issue, approval and release for fabrication, against the required-on-site date |
| Change order cycle | Days from identification to pricing, submission and approval, and percentage of field changes billed |
| Billing and cash | On-time billing submission, days sales outstanding, and aged retention by job |
| Forecast accuracy | Variance between the monthly cost-to-complete forecast and actual final cost |
| Closeout completion | Days from substantial completion to accepted closeout documents and final billing |
These are the same measures the annual review for this role is built on, so the document you hire against and the document you rate against are measuring one thing.
Reading a resume for this seat
What separates a strong Commercial Electrical PM from a plausible one, on paper and in the first ten minutes of a call:
- Switchgear and transformer lead times discussed as a planning input, not a surprise
- Can describe how they forecast manpower with the foreman rather than at them
- Billing and retainage described in detail - cash position is part of the job
Screen for it: 3 questions and what a strong answer contains
A job description tells you what you need. These tell you whether the person in front of you has it. Each one comes with what a strong answer contains, because an interviewer who does not know that is persuaded by fluency, which is exactly what the question was supposed to see past.
Gear is quoted at 40 weeks. How does that change your buyout and your schedule?
What a strong answer containsBuys the gear first and everything else around it, because the forty weeks starts at approved submittal and not at order. Protects the submittal and approval window in the schedule, asks for a hold on the quote and a firm price, plans storage and delivery access for equipment that will arrive before the building wants it, and tells the general contractor what date the energisation now hangs on.
Follow up with: When does the forty weeks actually start, and who controls that date?
How do you build a manpower curve, and who do you build it with?
What a strong answer containsFrom the estimate hours spread against the real sequence, not a bell curve drawn to look right. Built with the foreman and the superintendent rather than at a desk, checked against who is actually available, and used as a tripwire: when the curve and the timesheets diverge, something is wrong and it is early enough to fix.
Follow up with: What does it tell you when the actual curve runs above the planned one in week three?
Describe a change order that was denied. What did you do next?
What a strong answer containsA real one, with what the denial was based on, and a next step that is neither rolling over nor escalating straight to a claim. Went back to the contract and the documentation, established whether they had actually proved entitlement, and either produced the evidence or accepted it and said why. The lesson they took should be about documentation at the time, not about the other party.
Follow up with: What would you have documented differently on the day?
The mistake this seat invites
Hiring a strong foreman into the seat and expecting the commercial instincts to follow. The two jobs share a vocabulary and almost nothing else.
How long this takes to fill
My Trade Talent's median commercial electrical hire took 30 days across 11 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
Worth writing on the requisition before you post it. The cost of the vacancy runs from the day the seat empties, not from the day you start looking, and the calculator will put a number on it for your billing rate.
Questions employers ask about this role
What does a Commercial Electrical PM do?
The Commercial Electrical Project Manager owns electrical projects commercially: buyout, submittals, gear procurement, manpower forecasting with the field, change orders, billing and margin. The role turns an awarded estimate into a bought, scheduled and documented job, and reports the forecast the company's cash and backlog depend on. Because switchgear and panel lead times set the critical path on most commercial jobs, procurement is the defining constraint of the seat. The full description below lists 15 essential duties in trade terms, with physical demands and frequencies.
What qualifications does a Commercial Electrical PM need?
8 requirements are written as non-negotiable for this seat. The first 3: Five years of commercial electrical experience, including three managing electrical projects commercially; Demonstrated command of electrical submittals, gear procurement and lead time management on commercial projects; Ability to read electrical construction documents, one-line diagrams and specifications and to price changes from them. A further 7 qualifications are preferred rather than required, which is the distinction that decides whether a good candidate gets screened out by your own posting.
What credentials should I verify before making an offer to a Commercial Electrical PM?
One credential on this role is required outright: Valid driver's license. Each one has a named place to verify it in the table below. Verify before the offer rather than after; a credential taken on trust at offer is the most expensive line in a job description.
Is a Commercial Electrical PM exempt or non-exempt?
Typically exempt — confirm with counsel. FLSA status turns on the duties actually performed rather than the job title, and the duties for this seat are listed below so a classification decision has something to rest on. We are not lawyers and the note here is a starting point for counsel, not a determination.
What should a Commercial Electrical PM be paid?
$95,000 to $155,000. My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.
How long does it take to hire a Commercial Electrical PM?
My Trade Talent's median commercial electrical hire took 30 days across 11 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
What is the most common hiring mistake in this seat?
Hiring a strong foreman into the seat and expecting the commercial instincts to follow. The two jobs share a vocabulary and almost nothing else.
One time