Landscape Project Manager Performance Review Template
Commercial Landscaping
5 weighted sections, 25 criteria, on a scale with written anchors. The criteria are things a manager can observe on a job rather than adjectives about a person, which is the difference between a review somebody can prepare for and one they can only receive.
The scale
| Rating | What it means |
|---|---|
| 1 | Does not meet. Specific, repeated and known to the person. |
| 2 | Below the seat. Needs supervision the role is not supposed to need. |
| 3 | Meets the seat. This is the standard, not the consolation. |
| 4 | Above the seat. Others are learning from how they do it. |
| 5 | Rare. Changes how the company does the work. |
A 3 is the standard the seat was hired against, not a disappointment. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing.
How the weighted score works
Each section rating is multiplied by that section's weight; the five results are added and divided by 100. Worked through with this role's own weightings, for an illustrative Landscape Project Manager who is strong on the trade itself, standard on output and safety, and below the seat on communication:
| Section | Weight | Example rating | Weighted |
|---|---|---|---|
| A. Technical skill and execution | 25% | 4 | 1.00 |
| B. Productivity and measured results | 20% | 3 | 0.60 |
| C. Safety and compliance | 15% | 3 | 0.45 |
| D. Communication and customer handling | 25% | 2 | 0.50 |
| E. Reliability, teamwork and development | 15% | 3 | 0.45 |
| Overall | 100% | 3.00 |
3.00 on a scale where 3.00 is the seat performed to standard. The total is the least interesting number in that table. A 2 in one section can sit inside a total that reads as unremarkable, which is exactly why the section scores go on the form and the conversation happens section by section rather than about an average. The ratings above are an illustration, not a finding about anyone.
A. Technical skill and execution 25%
| Criterion | What good looks like |
|---|---|
| Buyout and takeoff accuracy | Committed material and subcontract cost lands at or below the estimate; unbudgeted buying to cover a quantity shortfall is rare and documented. |
| Plant material quality | Material arrives meeting specified size, caliper and root condition; rejections at delivery and architect rejections after planting stay minimal. |
| Submittal management | Submittals go out within the contract window and are approved without a second rejection on most packages. |
| Scope and specification command | Identifies exclusions, specification conflicts and missing predecessors in writing before mobilization on each project. |
| Field verification | Confirms soil depth, base compaction, grade and irrigation coverage before cover-up, with dated photos in the project file. |
B. Productivity and measured results 20%
| Criterion | What good looks like |
|---|---|
| Project margin | Projects close at or above the as-sold margin, and any erosion is explained by cost code in the closeout review. |
| Change order capture | Extra work is priced, submitted and approved before performance on all but documented emergencies. |
| Schedule milestones | Hits committed GC milestone and substantial completion dates, or issues written notice before the date. |
| Billing and retention | Pay applications are submitted on time and approved without reduction, and retention is released within the contract window. |
| Closeout speed | An accepted closeout package is delivered within the agreed number of days after substantial completion on every project. |
C. Safety and compliance 15%
| Criterion | What good looks like |
|---|---|
| Site safety on managed projects | No recordable injuries or utility strikes on assigned projects, and GC safety audits produce no repeat findings. |
| Own site conduct | Completes each GC site orientation before entering and wears required PPE; no safety write-ups from a general contractor. |
| Contract compliance | Insurance certificates, bonds, certified payroll and prevailing wage filings are submitted complete and on time. |
| Environmental and permit compliance | Erosion control, tree protection, dust and silica controls and permit conditions are in place and documented on each site. |
D. Communication and customer handling 25%
| Criterion | What good looks like |
|---|---|
| GC coordination | Attends required coordination meetings and answers RFIs within the contract response time on every project. |
| Written notice discipline | Differing site conditions, delays and missing predecessors get written notice with photos the day they are identified. |
| Architect and owner relationship | Punch walks produce a written, acknowledged list, and the architect signs off without a second walk on most projects. |
| Internal direction to the field | Foremen receive the plan, submittal approvals and material delivery dates before mobilization, confirmed by the foreman. |
| Supplier and subcontractor management | Purchase orders, scopes and delivery dates are in writing, and no work starts on a verbal commitment. |
| Project documentation | Daily reports, meeting minutes, correspondence and the change order log are current enough to answer a claim from the file alone. |
E. Reliability, teamwork and development 15%
| Criterion | What good looks like |
|---|---|
| Follow-through | Commitments made in meetings appear in writing and are completed by the date given. |
| Responsiveness | Returns GC, supplier and internal calls and email within one business day. |
| Teamwork across projects | Shares crews, equipment and material allocations with other project managers when the portfolio schedule requires it. |
| Warranty ownership | Handles establishment and warranty issues without the client escalating, and completes warranty replacements within the planting window. |
| Development | Completes a documented certification or training during the year, such as OSHA 30, arborist or a project management course. |
What this seat is measured on day to day
| Measure | What it captures |
|---|---|
| Project gross margin | Final margin by project compared to the as-sold margin, with variance explained by cost code |
| Buyout savings | Difference between estimated material and subcontract cost and the amount actually committed |
| Change order capture and approval | Dollars of extra work documented, submitted and approved before performance, and the approval cycle time |
| Schedule performance | Percent of GC milestone and substantial completion dates met |
| Submittal and closeout turnaround | Days from award to first submittal, submittal rejection rate, and days from substantial completion to accepted closeout package |
| Warranty cost | Plant replacement and hardscape warranty cost as a share of project value during the warranty period |
| Billing and cash | Pay applications submitted on time, approved without reduction, and retention released within the contract window |
The same measures the job description for this role is written against, so the document you hire against and the document you rate against are measuring one thing.
Where this person goes next
Landscape PMs move to senior PM or operations manager.
The review is the natural place for this conversation and the wrong place to have it for the first time. Someone hearing about the next seat in the same meeting as their rating hears it as consolation. Say it in advance, then use the review to say how far along they are.
The pay conversation
My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.
A review that produces a number and no pay decision is a review the employee will discount next year. One that produces a pay decision made in the same half hour is usually a decision made on the last thing discussed. Know where the person sits in the band before the meeting, and treat the rating as evidence for a decision you take afterwards.
Nothing here sets pay. What a rating is worth depends on your margins, your bands and your state, and those are yours.
What it costs if this one leaves
We publish no commercial landscaping median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 94 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
Worth knowing before the meeting rather than after it. The question a retention decision actually turns on is not whether a raise is deserved but what the seat costs empty for that long, and the calculator will put a figure on it for your billing rate.
Before you use it
Move the weightings to match how your business makes money, and move them before the review rather than after you have seen the scores. The split here is a starting point, not a judgement about your company.
Against every criterion, write the job, the date or the customer that evidences it. A criterion with nothing written beside it has not been met, however well the person is getting on, because you are about to make a decision and an impression is not evidence.
What follows from the result is yours. Pay, promotion and a development plan depend on your margins, your bands and your state, and nothing here sets them.
Questions employers ask about reviewing this role
How do you score an annual review for a Landscape Project Manager?
5 sections, weighted to 25%, 20%, 15%, 25%, 15% in that order, each rated 1 to 5 against written anchors. Multiply each section rating by its weight, add the five results and divide by 100; the worked example on this page does it in full. A 3.00 is the seat performed to the standard it was hired against.
What should a rating of 3 mean?
Meets the seat. It is the standard, not the consolation. Managers who treat 3 as a failing grade produce reviews where everyone is a 4, and a scale where everyone scores the same measures nothing and defends nothing if the decision is ever questioned.
How many criteria does this review cover?
25 across 5 sections, all of them things a manager can observe on a job rather than adjectives about a person. Each one has what good looks like written out beside it, which is the difference between a review somebody can prepare for and one they can only receive.
Should the review set pay?
Not by itself, and nothing here does. The instrument tells you how the work was performed against the seat. What follows - a raise, a promotion, a development plan or none of them - depends on your margins, your bands and your state. For reference, the band for this role is $72,000 to $110,000.
What do I do with a 2 in one section?
Name the job, the date or the customer that evidences it, say what meeting the seat would look like instead, and put a date on when you will look again. A 2 with no evidence beside it is an impression, and an impression is not something you can ask someone to improve. A 2 that sits inside an acceptable overall total is also the most common thing a single summary number hides, which is why the section scores go on the form.
Can I change the weightings?
Yes, and you should if they do not match how your business makes money. Change them before the review rather than after you have seen the scores, and change them for the seat rather than the person. The split here is a starting point.
What is the next step up from Landscape Project Manager?
Landscape PMs move to senior PM or operations manager.
What does it cost if a Landscape Project Manager leaves?
We publish no commercial landscaping median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 94 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire. That is the refill clock; the cost of the vacancy runs alongside it from the day the seat empties.
One time
Where should we send it?
Tell us who you are once and every document on this site downloads for you from then on, with no form in the way. We are a recruiting firm: someone may call about the roles you are hiring for.