Skip to main content
Job description

Landscape Project Manager Job Description

Commercial Landscaping

Manages commercial landscape installation projects from award to warranty. Buys out plant material, hardscape, irrigation and subcontracts, prepares and tracks submittals, builds and defends the schedule against the general contractor's sequence, prices and processes change orders for site conditions, controls job cost, and runs closeout including establishment, maintenance periods and warranty replacement. Carries the margin on each project and the relationship with the general contractor, architect and owner.

15essential duties
8 / 7required / preferred qualifications
6credentials, each with who verifies it
Take this away as a Word document The same description, formatted for a personnel file, with an acknowledgement signature block at the end. The first download asks for your name, company, work email and phone; after that every document here downloads without a form.
Download .docx

What this seat pays

$72,000 to $110,000 My Trade Talent band

My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.

Pay, location and the date prepared are blank in the Word version on purpose. They depend on your market and your margins, and a template that guesses at them is worse than one that leaves them to you. The figure above is here so the guess is at least anchored.

The seat

Reports toDirector of Construction or Branch Manager
Direct reportsNone directly; directs foremen, subcontractors and suppliers on assigned projects
FLSA statusTypically exempt — confirm with counsel
TradeCommercial Landscaping
Pay band$72,000 to $110,000 — My Trade Talent band

Where the role goes next. Landscape PMs move to senior PM or operations manager.

Essential duties (15)

  • Takes over awarded projects from estimating, reviews the bid, plans, specifications and contract exclusions, and builds the project budget by cost code.
  • Buys out plant material, including tagging or arranging grower inspection and confirming size, caliper, root condition and availability against the plant schedule.
  • Buys out hardscape materials, soils, drainage, irrigation components and subcontracts, and negotiates price, lead time and delivery terms.
  • Prepares and tracks submittals, product data, soil test results and plant photos through the architect and general contractor, and keeps the submittal log current.
  • Builds the landscape schedule, ties it to the general contractor's sequence, and identifies the predecessors the GC must finish before landscape can start.
  • Attends GC coordination meetings, answers RFIs, and gives written notice when a predecessor, grade or sleeve is not ready.
  • Prices, submits and tracks change orders for differing site conditions, owner additions and plan revisions, and does not let work proceed on a verbal.
  • Reviews job cost weekly, compares committed and spent cost against budget by code, and acts on variance while the job can still be corrected.
  • Coordinates deliveries and site logistics — crane picks, laydown areas, access, protection of finished work — with the GC and the foreman.
  • Walks the site to verify grade, soil depth, plant quality at delivery, layout and hardscape base before the work gets covered up.
  • Processes monthly pay applications, lien waivers and certified payroll where required, and tracks retention release.
  • Runs the punch walk with the architect, GC and owner, resolves the list, and documents sign-off for substantial completion.
  • Manages closeout: as-builts, irrigation controller programming and wiring diagrams, warranty letters, maintenance instructions and operations manuals.
  • Manages the establishment and warranty period, schedules watering and maintenance visits, inspects before warranty expiration, and handles replacement plant material.
  • Keeps project documentation current — daily reports, photos, correspondence, meeting minutes and the change order log — so a dispute can be answered from the file.

Qualifications

Required
  • Three or more years managing commercial landscape or site construction projects, or five years as a foreman with buyout and cost responsibility.
  • Able to read and take off from landscape, irrigation, grading and hardscape plans and the related specification sections.
  • Able to build and manage a project budget by cost code and to reconcile committed cost, actual cost and billing.
  • Working knowledge of submittals, RFIs, change orders, pay applications, lien waivers and closeout requirements on GC-run commercial work.
  • Knowledge of regional plant material, nursery grading standards, and planting and soil specifications.
  • Valid driver license with an acceptable motor vehicle record; frequent travel between active sites.
  • Able to walk active construction sites on uneven ground in heat, cold and mud for several hours a day.
  • Able to write notices, change order narratives and client correspondence that hold up in a dispute.
Preferred
  • Degree in landscape architecture, horticulture, construction management or a related field.
  • Experience with Procore, Autodesk Construction Cloud, Aspire or LMN.
  • ICPI, NCMA or Irrigation Association certification.
  • ISA Certified Arborist for plant quality and tree preservation decisions.
  • Experience with public works, prevailing wage and certified payroll projects.
  • Bilingual English and Spanish.
  • Experience with stormwater, bioretention and green roof installations.

The line between these two columns is the one that costs you candidates. Everything in the preferred column that gets written into a posting as a requirement removes people who could do the job, and in a trade with a shortage that is a self-inflicted wound.

Credentials, and who verifies them

CredentialStatusVerify with
Valid driver licenseRequiredMotor vehicle record check through HR
Site-specific safety orientation required by the general contractorRequiredOrientation record from the general contractor, kept by the safety manager
OSHA 30 construction outreach cardPreferredCard copy verified by the safety manager
State pesticide applicator license where this role oversees applications during establishmentWhere the state requires itState department of agriculture license lookup
ISA Certified ArboristPreferredISA credential verification
Irrigation Association, ICPI or NCMA certificationPreferredCertificate verified through the certifying body

Verify before an offer rather than after. A credential taken on trust at offer is the most expensive line on this page. We track commercial landscaping licensing in 39 states; which of them applies depends on where the work is, not where the company is.

Physical demands

ActivityFrequency
Sitting at a desk or in a vehicle for buyout, cost review, submittals and correspondenceFrequent (1/3 to 2/3 of shift)
Keyboard, phone and video meeting useFrequent (1/3 to 2/3 of shift)
Driving between active job sites, nurseries, suppliers and the officeFrequent (1/3 to 2/3 of shift)
Walking active construction sites on mud, gravel, graded soil and incomplete hardscapeFrequent (1/3 to 2/3 of shift)
Exposure to outdoor heat, humidity, sun, cold and rain during site visits and nursery taggingFrequent (1/3 to 2/3 of shift)
Climbing ladders and stairs and entering partially built structures to reach planters and terracesOccasional (under 1/3 of shift)
Bending, stooping and kneeling to check planting depth, base compaction, soil depth and valve boxesOccasional (under 1/3 of shift)
Lifting and carrying up to 25 pounds such as plan sets, material samples, a soil probe and irrigation partsOccasional (under 1/3 of shift)
Working around heavy equipment, open excavations and other tradesOccasional (under 1/3 of shift)
Exposure to construction dust, silica from saw cutting, and equipment noiseOccasional (under 1/3 of shift)
Operating equipment or performing manual installation laborRarely

This is the section a reasonable accommodation decision actually turns on, which is why it is role specific rather than copied across a trade. An estimator sits and walks sites; a screed operator stands beside hot asphalt all day.

Work environment

Time splits between an office or truck for buyout, cost and submittals and active commercial construction sites for verification, coordination and punch walks. Site conditions include mud, dust, noise, open excavations, heavy equipment and other trades working around and above. Nursery visits for tagging happen in full sun. Deadlines move with the general contractor, so expect schedule pressure, early meetings, occasional Saturdays and travel across the market.

Tools and equipment

The company provides a truck or vehicle allowance, fuel card, laptop, phone, project management and estimating software, plan sets, a soil probe and site PPE including hard hat, high-visibility vest, safety glasses and gloves. The project manager owns steel or composite toe work boots, clothing suited to both a GC meeting and a muddy site, and a reliable personal phone.

How performance is measured

MeasureWhat it captures
Project gross marginFinal margin by project compared to the as-sold margin, with variance explained by cost code
Buyout savingsDifference between estimated material and subcontract cost and the amount actually committed
Change order capture and approvalDollars of extra work documented, submitted and approved before performance, and the approval cycle time
Schedule performancePercent of GC milestone and substantial completion dates met
Submittal and closeout turnaroundDays from award to first submittal, submittal rejection rate, and days from substantial completion to accepted closeout package
Warranty costPlant replacement and hardscape warranty cost as a share of project value during the warranty period
Billing and cashPay applications submitted on time, approved without reduction, and retention released within the contract window

These are the same measures the annual review for this role is built on, so the document you hire against and the document you rate against are measuring one thing.

Reading a resume for this seat

What separates a strong Landscape Project Manager from a plausible one, on paper and in the first ten minutes of a call:

  • Has sourced plant material against a specification and managed substitutions
  • Understands establishment and warranty obligations as a cost to be scheduled
  • Can work to a general contractor schedule that treats landscape as the last trade in

Screen for it: 3 questions and what a strong answer contains

A job description tells you what you need. These tell you whether the person in front of you has it. Each one comes with what a strong answer contains, because an interviewer who does not know that is persuaded by fluency, which is exactly what the question was supposed to see past.

The specified tree size is unavailable in the region. How do you handle the substitution?

What a strong answer contains

Goes back to the landscape architect with options rather than substituting quietly: a smaller size of the same species with a growth expectation, a different species with comparable habit and mature size, or a delayed delivery if the schedule allows. Brings availability evidence from more than one grower. Gets the substitution approved in writing before ordering, because an unapproved substitution is rejected at the warranty walk and replaced at their cost.

Follow up with: What do you get in writing before a tree goes in the ground?

How do you protect your installation when you are the last trade on a congested site?

What a strong answer contains

Assumes the site will be driven on and plans for it: sequences planting away from the remaining traffic routes, fences or barricades what is finished, agrees with the general contractor in writing who is responsible for damage, and photographs the condition at completion. Pushes to install irrigation and soil preparation before the finish trades leave rather than after. Prices the protection and the inevitable repair rather than hoping.

Follow up with: What do you agree with the general contractor before you mobilise?

What does your warranty walk look like and when do you schedule it?

What a strong answer contains

Schedules it before the warranty expires with enough margin to replace in the right season, not on the last day. Walks with the owner and the architect, assesses each plant for condition rather than only survival, and distinguishes what failed from install quality from what failed from the owner not watering or from damage. Brings the maintenance and watering records. Replaces what is theirs without argument and documents what is not.

Follow up with: How far before the warranty ends do you schedule the walk, and why?

The mistake this seat invites

Underestimating the establishment period. The job is not finished at installation, and project managers who schedule it that way lose the warranty argument.

How long this takes to fill

We publish no commercial landscaping median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.

Worth writing on the requisition before you post it. The cost of the vacancy runs from the day the seat empties, not from the day you start looking, and the calculator will put a number on it for your billing rate.

Questions employers ask about this role

What does a Landscape Project Manager do?

Manages commercial landscape installation projects from award to warranty. Buys out plant material, hardscape, irrigation and subcontracts, prepares and tracks submittals, builds and defends the schedule against the general contractor's sequence, prices and processes change orders for site conditions, controls job cost, and runs closeout including establishment, maintenance periods and warranty replacement. Carries the margin on each project and the relationship with the general contractor, architect and owner. The full description below lists 15 essential duties in trade terms, with physical demands and frequencies.

What qualifications does a Landscape Project Manager need?

8 requirements are written as non-negotiable for this seat. The first 3: Three or more years managing commercial landscape or site construction projects, or five years as a foreman with buyout and cost responsibility; Able to read and take off from landscape, irrigation, grading and hardscape plans and the related specification sections; Able to build and manage a project budget by cost code and to reconcile committed cost, actual cost and billing. A further 7 qualifications are preferred rather than required, which is the distinction that decides whether a good candidate gets screened out by your own posting.

What credentials should I verify before making an offer to a Landscape Project Manager?

3 credentials on this role are either required outright or required where the state requires it: Valid driver license, Site-specific safety orientation required by the general contractor and State pesticide applicator license where this role oversees applications during establishment. Each one has a named place to verify it in the table below. Verify before the offer rather than after; a credential taken on trust at offer is the most expensive line in a job description.

Is a Landscape Project Manager exempt or non-exempt?

Typically exempt — confirm with counsel. FLSA status turns on the duties actually performed rather than the job title, and the duties for this seat are listed below so a classification decision has something to rest on. We are not lawyers and the note here is a starting point for counsel, not a determination.

What should a Landscape Project Manager be paid?

$72,000 to $110,000. My Trade Talent mid-experience band, built from our own engagement history. Experience and region move it; the salary calculator applies both.

How long does it take to hire a Landscape Project Manager?

We publish no commercial landscaping median of our own yet, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 88 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.

What is the most common hiring mistake in this seat?

Underestimating the establishment period. The job is not finished at installation, and project managers who schedule it that way lose the warranty argument.

Trade Talk A monthly hiring brief for commercial trades employers

What changed in your trade this month, and what to do about it.

One email a month, and only one. We write a separate issue for every trade we recruit in, so you get yours - not a round-up with your trade buried in paragraph nine. Every issue is written for the person actually doing the hiring.

  • Where wages moved in your trade, by market, and what that does to your next offer
  • How long roles like yours are taking to fill, and where it is getting worse
  • Interview and screening tactics that are landing candidates this month
  • What contractors competing for the same people are doing differently

Built on federal wage data, our own closed searches, and what we hear on the desk every week. Written for employers, not candidates. No pitch, no filler, one click to leave.

Pick your trade. That is the one issue you get, once a month.

One email a month. Your trade and your address, nothing else - we do not sell either, and you can unsubscribe from the bottom of any issue. Read this month's issue for your trade first →