Concrete Finisher Job Description
Masonry & Concrete
Places, screeds, floats and finishes concrete flatwork. Judges the set by hand and eye, bull floats, edges and cuts joints, power trowels to the specified finish and flatness, and applies cure or sealer. Patches, grinds and protects green concrete afterward. The whole sequence happens inside a window set by weather, mix design and the trucks on the way, so the work is paced by the slab, not by the clock.
What this seat pays
Federal figures: BLS Occupational Employment and Wage Statistics, May 2025, national, SOC 47-2051. The range is the 10th to 90th percentile and the median is $57,020. It is not adjusted for experience or region, and it is not a My Trade Talent band.
Pay, location and the date prepared are blank in the Word version on purpose. They depend on your market and your margins, and a template that guesses at them is worse than one that leaves them to you. The figure above is here so the guess is at least anchored.
The seat
| Reports to | Concrete Foreman |
| Direct reports | None; directs laborers during a placement |
| FLSA status | Non-exempt — confirm with counsel |
| Trade | Masonry & Concrete |
| Pay band | $39,190 to $85,480 — BLS 10th to 90th percentile |
Where the role goes next. Finishers move to lead finisher and foreman, and decorative and polished work extends the career.
Essential duties (15)
- Review the pour plan before the trucks arrive: mix design, slump, admixtures, specified finish, flatness and levelness tolerances, joint layout and curing method.
- Set and check screed rails, wet screeds, edge forms and elevations from the laser or grade stakes before placement starts.
- Place concrete from chute, pump, bucket or buggy, spreading and raking to grade without segregating the mix or walking down reinforcement.
- Vibrate and consolidate at edges, embeds and thickened sections without over-vibrating the slab.
- Screed with a wet screed, roller screed or laser screed and check grade as the placement advances.
- Bull float the surface to close the slab, then wait on the set and judge it by boot print and sheen before taking the next step.
- Edge, hand float, and run walk-behind or ride-on power trowels, changing from float pans to blades as the slab tightens.
- Cut or tool contraction joints at the specified spacing and depth, saw cutting on time — including early-entry sawing — to beat random cracking.
- Produce the finish the specification calls for — broom, swirl, hard troweled, burnished, exposed aggregate, salt or stamped, including dry shake color hardener where specified — and match it across the entire placement.
- Apply cure, cure and seal, evaporation retarder or wet burlap and plastic, and keep the slab protected through the full cure period.
- Coordinate and assist field testing: slump, air, temperature and cylinder casting, and record truck tickets, times and any water added.
- Patch, grind and repair bug holes, honeycombing and edge damage, and strip forms without spalling the edges.
- Set and remove weather protection — blankets, heaters, ground thaw, sun shade, windbreak — and record ambient and concrete temperatures.
- Clean and maintain tools and equipment the same day: trowels, floats, screeds, trowel blades and pans, saws, vibrators and pump line.
- Complete timesheets, pour logs and quantity records at the end of every placement.
Qualifications
- Three or more years finishing commercial concrete flatwork, or completion of a cement mason apprenticeship.
- Ability to read grade from a laser or level, work to specified flatness and levelness tolerances, and judge the set without being told when to start.
- Experience running a walk-behind power trowel and, on larger slabs, a ride-on trowel.
- Working knowledge of joint layout, saw cutting timing, and the common specified finishes including broom, hard trowel and exposed aggregate.
- Ability to work bent at the waist and on knees on uneven surfaces through an extended placement, and to lift 75 pounds.
- Availability for early starts, long placement days and weather-driven schedule changes.
- Own finishing hand tools, knee boards, rubber boots and steel-toe boots.
- Valid driver's license and reliable transportation for site-to-site reporting.
- Experience with superflat and FF/FL-specified floors and with laser screed placement.
- Polished, dyed and densified concrete and decorative stamped or integrally colored work.
- ACI Concrete Flatwork Finisher or Flatwork Technician certification.
- Experience with pump placements, elevated decks and slabs on metal deck.
- Forming, rebar placement and layout experience for small pours.
- Cold and hot weather concreting experience with heated enclosures and ground thaw.
- Ability to run a small placement crew and read the pour plan for the foreman.
The line between these two columns is the one that costs you candidates. Everything in the preferred column that gets written into a posting as a requirement removes people who could do the job, and in a trade with a shortage that is a self-inflicted wound.
Credentials, and who verifies them
| Credential | Status | Verify with |
|---|---|---|
| OSHA 10-Hour Construction | Required | Card number verified with the authorized outreach trainer |
| Silica awareness training and respirator fit test for saw cutting and grinding | Required | Occupational health provider for the fit test and the safety manager for the training record |
| Valid driver's license and insurable record where a company truck or trailer is driven | Required | State motor vehicle record pulled through the company's insurance carrier |
| ACI Concrete Flatwork Finisher certification | Preferred | ACI certification verification portal, by name and certification number |
| Ride-on power trowel, skid steer or buggy operator training | Preferred | The in-house trainer or equipment dealer that issued the card |
| Journeyman cement mason registration | Where the state requires it | The state or local licensing authority and the joint apprenticeship committee |
Verify before an offer rather than after. A credential taken on trust at offer is the most expensive line on this page. We track masonry & concrete licensing in 39 states; which of them applies depends on where the work is, not where the company is.
Physical demands
| Activity | Frequency |
|---|---|
| Bending at the waist over a slab while screeding, floating and edging | Constant (over 2/3 of shift) |
| Walking on fresh concrete, gravel, reinforcement mats and uneven subgrade | Constant (over 2/3 of shift) |
| Pushing and pulling bull floats, screeds, come-alongs and rakes with arms extended | Constant (over 2/3 of shift) |
| Working in rubber boots in wet concrete, with hands exposed to cement and admixtures | Constant (over 2/3 of shift) |
| Exposure to sun, heat, cold and wind outdoors, including early morning and night placements | Constant (over 2/3 of shift) |
| Kneeling on knee boards to hand finish and detail | Frequent (1/3 to 2/3 of shift) |
| Lifting and carrying up to 75 pounds — screed sections, trowel blades, bagged material, saws | Frequent (1/3 to 2/3 of shift) |
| Operating a walk-behind or ride-on power trowel with sustained vibration exposure | Frequent (1/3 to 2/3 of shift) |
| Working through the finishing window without a break because the set does not wait | Frequent (1/3 to 2/3 of shift) |
| Wearing a respirator while saw cutting, grinding or handling dry shake and bagged cement | Occasional (under 1/3 of shift) |
| Climbing into and out of footings, pits and elevated deck areas | Occasional (under 1/3 of shift) |
| Working inside heated enclosures or enclosed interior spaces with heater and generator exhaust | Rarely |
This is the section a reasonable accommodation decision actually turns on, which is why it is role specific rather than copied across a trade. An estimator sits and walks sites; a screed operator stands beside hot asphalt all day.
Work environment
On the slab, outdoors or in buildings not yet enclosed, with early starts and occasional night placements to beat the heat. Conditions include wet concrete, alkaline cement contact, sun, heat, cold, wind and rain, ready-mix truck and pump traffic, saw noise and respirable silica, and reinforcement underfoot. The placement window is set by the mix and the weather, so shifts run long and end when the slab says they do.
Tools and equipment
The employer provides power trowels, screeds, bull floats, vibrators, saws, lasers, pumps, cure and sealer, blades and pans, dust controls, hard hat, glasses and hearing protection. The finisher is expected to own hand trowels, floats, edgers, groovers, knee boards, knee pads, rubber boots, waterproof gloves and steel-toe boots.
How performance is measured
| Measure | What it captures |
|---|---|
| Finish acceptance on first walk | Placements accepted by the general contractor or owner without a grinding, topping or refinish directive |
| Flatness and levelness results | FF and FL numbers or straightedge checks against the specified tolerance on slabs this finisher ran |
| Rework and repair hours | Hours spent grinding, patching, topping or replacing concrete this finisher placed |
| Random cracking and joint performance | Cracks traced to late saw cutting, wrong joint spacing or curing failure |
| Square feet placed and finished per crew day | Production against the target for that slab type and finish |
| Material and cure compliance | Water added to trucks, cure applied inside the required window, and temperature records complete |
| Punch and callback items | Concrete punch items at closeout and warranty callbacks on this finisher's placements |
These are the same measures the annual review for this role is built on, so the document you hire against and the document you rate against are measuring one thing.
Reading a resume for this seat
What separates a strong Concrete Finisher from a plausible one, on paper and in the first ten minutes of a call:
- Reads the set rather than working to a clock
- Knows what jointing is for and where the joints have to land
- Has finished to a flatness specification and knows how it was measured
Screen for it: 3 questions and what a strong answer contains
A job description tells you what you need. These tell you whether the person in front of you has it. Each one comes with what a strong answer contains, because an interviewer who does not know that is persuaded by fluency, which is exactly what the question was supposed to see past.
How do you know when the slab is ready to float, and what happens if you start early?
What a strong answer containsReads the slab rather than the clock: the bleed water gone from the surface, and a footprint leaving a shallow impression rather than sinking in. Knows it varies across the slab with sun, wind, mix and thickness, so one area may be ready while another is not. Starting early works bleed water back into the surface and gives a weak, dusting, crazed finish that shows up months later as a soft floor.
Follow up with: Why is working bleed water back into the surface so damaging?
Where do your control joints go on a slab with columns, and why there?
What a strong answer containsPuts joints through the columns rather than past them, usually with a diamond or a box-out around the column, because the column is a restraint and a crack will start there otherwise. Keeps panels close to square rather than long and thin, respects the maximum spacing for the thickness, and lines joints up with re-entrant corners and changes in the slab. Says a crack will appear where you did not put a joint.
Follow up with: Why does a long thin panel crack when a square one does not?
The forecast says rain in two hours and the truck is on site. What do you do?
What a strong answer containsDecides before the concrete is on the ground: how much can be placed and finished in the time, whether covering is realistic for that area, and whether to cut the pour at a planned joint rather than being caught mid-slab. Has covering and a plan ready rather than sending for it. Will stop and send trucks back, because rain on a fresh surface means a weak, scaled finish that has to come out.
Follow up with: What does rain on a freshly floated slab do to it?
The mistake this seat invites
Screening on general construction labour history. Finishing is a timing judgement under weather pressure, and a slab finished wrong cannot be redone.
How long this takes to fill
We have closed 1 masonry & concrete search in 2026 year to date, too few to publish a median for the trade, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 94 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
Worth writing on the requisition before you post it. The cost of the vacancy runs from the day the seat empties, not from the day you start looking, and the calculator will put a number on it for your billing rate.
Questions employers ask about this role
What does a Concrete Finisher do?
Places, screeds, floats and finishes concrete flatwork. Judges the set by hand and eye, bull floats, edges and cuts joints, power trowels to the specified finish and flatness, and applies cure or sealer. Patches, grinds and protects green concrete afterward. The whole sequence happens inside a window set by weather, mix design and the trucks on the way, so the work is paced by the slab, not by the clock. The full description below lists 15 essential duties in trade terms, with physical demands and frequencies.
What qualifications does a Concrete Finisher need?
8 requirements are written as non-negotiable for this seat. The first 3: Three or more years finishing commercial concrete flatwork, or completion of a cement mason apprenticeship; Ability to read grade from a laser or level, work to specified flatness and levelness tolerances, and judge the set without being told when to start; Experience running a walk-behind power trowel and, on larger slabs, a ride-on trowel. A further 7 qualifications are preferred rather than required, which is the distinction that decides whether a good candidate gets screened out by your own posting.
What credentials should I verify before making an offer to a Concrete Finisher?
4 credentials on this role are either required outright or required where the state requires it: OSHA 10-Hour Construction, Silica awareness training and respirator fit test for saw cutting and grinding, Valid driver's license and insurable record where a company truck or trailer is driven and Journeyman cement mason registration. Each one has a named place to verify it in the table below. Verify before the offer rather than after; a credential taken on trust at offer is the most expensive line in a job description.
Is a Concrete Finisher exempt or non-exempt?
Non-exempt — confirm with counsel. FLSA status turns on the duties actually performed rather than the job title, and the duties for this seat are listed below so a classification decision has something to rest on. We are not lawyers and the note here is a starting point for counsel, not a determination.
What should a Concrete Finisher be paid?
$39,190 to $85,480. Federal figures: BLS Occupational Employment and Wage Statistics, May 2025, national, SOC 47-2051. The range is the 10th to 90th percentile and the median is $57,020. It is not adjusted for experience or region, and it is not a My Trade Talent band.
How long does it take to hire a Concrete Finisher?
We have closed 1 masonry & concrete search in 2026 year to date, too few to publish a median for the trade, so this is the all-trades figure: My Trade Talent's median commercial trades hire took 21 days across 94 searches closed in 2026 year to date, counted as calendar days from our first contact with the candidate to the hire.
What is the most common hiring mistake in this seat?
Screening on general construction labour history. Finishing is a timing judgement under weather pressure, and a slab finished wrong cannot be redone.
One time
Where should we send it?
Tell us who you are once and every document on this site downloads for you from then on, with no form in the way. We are a recruiting firm: someone may call about the roles you are hiring for.